{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,22]],"date-time":"2026-02-22T12:12:56Z","timestamp":1771762376466,"version":"3.50.1"},"reference-count":52,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2020,12,1]],"date-time":"2020-12-01T00:00:00Z","timestamp":1606780800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2020,12,1]],"date-time":"2020-12-01T00:00:00Z","timestamp":1606780800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/www.elsevier.com\/legal\/tdmrep-license"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100003819","name":"Natural Science Foundation of Hubei Province","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100003819","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Reliability Engineering &amp; System Safety"],"published-print":{"date-parts":[[2020,12]]},"DOI":"10.1016\/j.ress.2020.107128","type":"journal-article","created":{"date-parts":[[2020,7,17]],"date-time":"2020-07-17T02:05:43Z","timestamp":1594951543000},"page":"107128","update-policy":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":20,"special_numbering":"C","title":["Considering different streamflow forecast horizons in the quantitative flood risk analysis for a multi-reservoir system"],"prefix":"10.1016","volume":"204","author":[{"given":"Yu","family":"Gong","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pan","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jun","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dedi","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaoqi","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaojing","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/j.ress.2020.107128_bib0001","doi-asserted-by":"crossref","first-page":"334","DOI":"10.1016\/j.ress.2015.05.020","article-title":"Quantitative assessment of risk due to NaTech scenarios caused by floods","volume":"142","author":"Antonioni","year":"2015","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0002","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1016\/j.ress.2018.12.021","article-title":"Reliability analysis and optimum maintenance of coastal flood defences using probabilistic deterioration modelling","volume":"185","author":"Chen","year":"2019","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0003","doi-asserted-by":"crossref","first-page":"2490","DOI":"10.1002\/2016WR019842","article-title":"A decomposition-integration risk analysis method for real-time operation of a complex flood control system","volume":"53","author":"Chen","year":"2017","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0004","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.envsoft.2018.10.007","article-title":"Risk analysis for real-time flood control operation of a multi-reservoir system using a dynamic Bayesian network","volume":"111","author":"Chen","year":"2019","journal-title":"Environ Model Software"},{"key":"10.1016\/j.ress.2020.107128_bib0005","first-page":"504","article-title":"Stochastic simulation of multi-site daily flow in the upper Yangtze River (in Chinese)","volume":"24","author":"Chen","year":"2013","journal-title":"Adv Water Sci"},{"key":"10.1016\/j.ress.2020.107128_bib0006","series-title":"Handbook of applied hydrology","author":"Chow","year":"1964"},{"key":"10.1016\/j.ress.2020.107128_bib0007","doi-asserted-by":"crossref","first-page":"45","DOI":"10.2166\/nh.2004.0004","article-title":"A synthetic groundwater modelling study of the accuracy of GLUE uncertainty intervals","volume":"35","author":"Christensen","year":"2004","journal-title":"Nordic Hydrol"},{"key":"10.1016\/j.ress.2020.107128_bib0008","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/j.ress.2012.04.007","article-title":"Uncertainty analysis of river flooding and dam failure risks using local sensitivity computations","volume":"107","author":"Delenne","year":"2012","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0009","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1016\/j.ress.2011.12.004","article-title":"Correlation models in flood risk analysis","volume":"105","author":"Diermanse","year":"2012","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0010","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2019.04.028","article-title":"Impact of including interdependencies between multiple riverine flood defences on the economically optimal flood safety levels","volume":"191","author":"Dupuits","year":"2019","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0011","doi-asserted-by":"crossref","first-page":"6885","DOI":"10.1002\/2016WR020180","article-title":"Deriving adaptive operating rules of hydropower reservoirs using time-varying parameters generated by the EnKF","volume":"53","author":"Feng","year":"2017","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0012","series-title":"Standard for information and hydrological forecasting","year":"2008"},{"key":"10.1016\/j.ress.2020.107128_bib0013","first-page":"23","article-title":"Design flood estimation methods for cascade reservoirs based on copulas","volume":"10","author":"Guo","year":"2018","journal-title":"Water (Basel)"},{"key":"10.1016\/j.ress.2020.107128_bib0014","first-page":"15","article-title":"Scheduling and benefit analysis on flood resources utilization of Three Gorges Reservoir (in Chinese)","volume":"49","author":"Hu","year":"2018","journal-title":"Yangtze River"},{"key":"10.1016\/j.ress.2020.107128_bib0015","doi-asserted-by":"crossref","first-page":"672","DOI":"10.1016\/j.jhydrol.2018.08.040","article-title":"Risk analysis of flood control reservoir operation considering multiple uncertainties","volume":"565","author":"Huang","year":"2018","journal-title":"J Hydrol (Amst)"},{"key":"10.1016\/j.ress.2020.107128_bib0016","doi-asserted-by":"crossref","first-page":"1004","DOI":"10.1080\/23744731.2018.1464348","article-title":"Evaluation of regression and neural network models for solar forecasting over different short-term horizons","volume":"24","author":"Inanlouganji","year":"2018","journal-title":"Sci Technol Built Environ"},{"key":"10.1016\/j.ress.2020.107128_bib0017","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/S0169-2070(02)00010-9","article-title":"Multi-period forecasting using different models for different horizons: an application to U.S. economic time series data","volume":"19","author":"Kang","year":"2003","journal-title":"Int J Forecast"},{"key":"10.1016\/j.ress.2020.107128_bib0018","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1016\/j.ress.2017.09.016","article-title":"Vulnerability of industrial plants to flood-induced natechs: a Bayesian network approach","volume":"169","author":"Khakzad","year":"2018","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0019","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/j.jhydrol.2010.07.011","article-title":"Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty","volume":"391","author":"Li","year":"2010","journal-title":"J Hydrol (Amst)"},{"key":"10.1016\/j.ress.2020.107128_bib0020","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1016\/0951-8320(88)90029-4","article-title":"Reliability evaluation of reservoir systems","volume":"23","author":"Limnios","year":"1988","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0021","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1016\/0951-8320(92)90078-Y","article-title":"Reliability modeling of uncontrolled and controlled reservoirs","volume":"35","author":"Limnios","year":"1992","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0022","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1016\/j.jhydrol.2014.04.012","article-title":"Parameter uncertainty analysis of reservoir operating rules based on implicit stochastic optimization","volume":"514","author":"Liu","year":"2014","journal-title":"J Hydrol (Amst)"},{"key":"10.1016\/j.ress.2020.107128_bib0023","doi-asserted-by":"crossref","first-page":"803","DOI":"10.1007\/s00477-014-0986-0","article-title":"A two-stage method of quantitative flood risk analysis for reservoir real-time operation using ensemble-based hydrologic forecasts","volume":"29","author":"Liu","year":"2014","journal-title":"Stochastic Environ Res Risk Assess"},{"key":"10.1016\/j.ress.2020.107128_bib0024","doi-asserted-by":"crossref","first-page":"1045","DOI":"10.1016\/j.jhydrol.2015.05.055","article-title":"Optimal design of seasonal flood limited water levels and its application for the Three Gorges Reservoir","volume":"527","author":"Liu","year":"2015","journal-title":"J Hydrol (Amst)"},{"key":"10.1016\/j.ress.2020.107128_bib0025","doi-asserted-by":"crossref","first-page":"1477","DOI":"10.1029\/WR020i011p01477","article-title":"Controllability conditions for reservoir flood control systems with applications","volume":"20","author":"Mari\u00ebn","year":"1984","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0026","doi-asserted-by":"crossref","first-page":"432","DOI":"10.1016\/j.apenergy.2017.07.046","article-title":"Optimizing utility-scale photovoltaic power generation for integration into a hydropower reservoir by incorporating long- and short-term operational decisions","volume":"204","author":"Ming","year":"2017","journal-title":"Appl Energy"},{"key":"10.1016\/j.ress.2020.107128_bib0027","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1016\/j.enconman.2018.06.001","article-title":"Optimal daily generation scheduling of large hydro-photovoltaic hybrid power plants","volume":"171","author":"Ming","year":"2018","journal-title":"Energy Conv Manag"},{"key":"10.1016\/j.ress.2020.107128_bib0028","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2019.106562","article-title":"Dealing with epistemic uncertainty in risk-informed decision making for dam safety management","volume":"191","author":"Morales-Torres","year":"2019","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0029","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1016\/S0022-1694(02)00135-X","article-title":"Flood risk and flood management","volume":"267","author":"Plate","year":"2002","journal-title":"J Hydrol"},{"key":"10.1016\/j.ress.2020.107128_bib0030","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1177\/0047287508321199","article-title":"An assessment of combining tourism demand forecasts over different time horizons","volume":"47","author":"Shen","year":"2008","journal-title":"J Travel Res"},{"key":"10.1016\/j.ress.2020.107128_bib0031","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1029\/WR019i002p00511","article-title":"Design-events with specifified flood risk","volume":"19","author":"Stedinger","year":"1983","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0032","first-page":"1","article-title":"Appraisal of the generalized likelihood uncertainty estimation (GLUE) method","volume":"44","author":"Stedinger","year":"2009","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0033","series-title":"The multivariate normal distribution","author":"Tong","year":"1990"},{"key":"10.1016\/j.ress.2020.107128_bib0034","doi-asserted-by":"crossref","first-page":"833","DOI":"10.1029\/WR017i004p00833","article-title":"Rrisk models for flood levee design","volume":"17","author":"Tung","year":"1981","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0035","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/j.ress.2004.10.002","article-title":"Quantitative flood risk assessment for Polders","volume":"90","author":"van Manen","year":"2005","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2020.107128_bib0036","series-title":"Stochastic hydrology (in chinese)","author":"Wang","year":"2008"},{"key":"10.1016\/j.ress.2020.107128_bib0037","first-page":"401","article-title":"Design flood and control water levels for cascade reservoirs during operation periodin the downstream Jinsha River (in Chinese)","volume":"30","author":"Xiong","year":"2019","journal-title":"Adv Water Sci"},{"key":"10.1016\/j.ress.2020.107128_bib0038","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1061\/(ASCE)WR.1943-5452.0000715","article-title":"Stochastic programming with a joint chance constraint model for reservoir refill operation considering flood risk","volume":"143","author":"Xu","year":"2017","journal-title":"J Water Resour Plan Manage-ASCE"},{"key":"10.1016\/j.ress.2020.107128_bib0039","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1007\/s00477-013-0756-4","article-title":"Estimation of reservoir flood control operation risks with considering inflow forecasting errors","volume":"28","author":"Yan","year":"2014","journal-title":"Stochastic Environ Res Risk Assess"},{"key":"10.1016\/j.ress.2020.107128_bib0040","doi-asserted-by":"crossref","first-page":"1326","DOI":"10.1029\/WR018i005p01326","article-title":"Multiobjective analysis of multireservoir operations","volume":"18","author":"Yeh","year":"1982","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0041","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1029\/2008WR006978","article-title":"Determining forecast and decision horizons for reservoir operations under hedging policies","volume":"44","author":"You","year":"2008","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0042","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/j.envsoft.2018.02.017","article-title":"Error correction-based forecasting of reservoir water levels: improving accuracy over multiple lead times","volume":"104","author":"Zhang","year":"2018","journal-title":"Environ Model Softw"},{"key":"10.1016\/j.ress.2020.107128_bib0043","doi-asserted-by":"crossref","first-page":"4066","DOI":"10.1029\/2019WR025226","article-title":"Determining Inflow Forecast Horizon for Reservoir Operation","volume":"55","author":"Zhao","year":"2019","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0044","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/j.advwatres.2013.03.008","article-title":"Generalized martingale model of the uncertainty evolution of streamflow forecasts","volume":"57","author":"Zhao","year":"2013","journal-title":"Adv Water Resour"},{"key":"10.1016\/j.ress.2020.107128_bib0045","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/j.jhydrol.2014.04.063","article-title":"Joint and respective effects of long- and short-term forecast uncertainties On reservoir operations","volume":"517","author":"Zhao","year":"2014","journal-title":"J Hydrol (Amst)"},{"key":"10.1016\/j.ress.2020.107128_bib0046","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/j.advwatres.2014.05.011","article-title":"Forecast-skill-based simulation of streamflow forecasts","volume":"71","author":"Zhao","year":"2014","journal-title":"Adv Water Resour"},{"key":"10.1016\/j.ress.2020.107128_bib0047","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1029\/2011WR010623","article-title":"Identifying effective forecast horizon for real-time reservoir operation under a limited inflow forecast","volume":"48","author":"Zhao","year":"2012","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0048","doi-asserted-by":"crossref","first-page":"1006","DOI":"10.1080\/02626667.2014.901515","article-title":"Risk analysis for flood control operation of seasonal flood-limited water level incorporating inflow forecasting error","volume":"59","author":"Zhou","year":"2014","journal-title":"Hydrol Sci J Sci Hydrol"},{"key":"10.1016\/j.ress.2020.107128_bib0049","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1016\/j.jhydrol.2015.02.034","article-title":"Deriving joint optimal refill rules for cascade reservoirs with multi-objective evaluation","volume":"524","author":"Zhou","year":"2015","journal-title":"J Hydrol (Amst)"},{"key":"10.1016\/j.ress.2020.107128_bib0050","doi-asserted-by":"crossref","first-page":"785","DOI":"10.1016\/j.energy.2017.11.035","article-title":"Methodology that improves water utilization and hydropower generation without increasing flood risk in mega cascade reservoirs","volume":"143","author":"Zhou","year":"2018","journal-title":"Energy"},{"key":"10.1016\/j.ress.2020.107128_bib0051","doi-asserted-by":"crossref","first-page":"10635","DOI":"10.1002\/2017WR021480","article-title":"Real-time optimal flood control decision making and risk propagation under multiple uncertainties","volume":"53","author":"Zhu","year":"2017","journal-title":"Water Resour Res"},{"key":"10.1016\/j.ress.2020.107128_bib0052","doi-asserted-by":"crossref","first-page":"3043","DOI":"10.1016\/j.eswa.2007.06.023","article-title":"Predicting stock index increments by neural networks: the role of trading volume under different horizons","volume":"34","author":"Zhu","year":"2008","journal-title":"Expert Syst Appl"}],"container-title":["Reliability Engineering &amp; System Safety"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/api.elsevier.com\/content\/article\/PII:S0951832020306293?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/api.elsevier.com\/content\/article\/PII:S0951832020306293?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,10,16]],"date-time":"2025-10-16T06:23:32Z","timestamp":1760595812000},"score":1,"resource":{"primary":{"URL":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/linkinghub.elsevier.com\/retrieve\/pii\/S0951832020306293"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,12]]},"references-count":52,"alternative-id":["S0951832020306293"],"URL":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/doi.org\/10.1016\/j.ress.2020.107128","relation":{},"ISSN":["0951-8320"],"issn-type":[{"value":"0951-8320","type":"print"}],"subject":[],"published":{"date-parts":[[2020,12]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Considering different streamflow forecast horizons in the quantitative flood risk analysis for a multi-reservoir system","name":"articletitle","label":"Article Title"},{"value":"Reliability Engineering & System Safety","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/summer-heart-0930.chufeiyun1688.workers.dev:443\/https\/doi.org\/10.1016\/j.ress.2020.107128","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2020 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}],"article-number":"107128"}}