Jump to content

Splityard Creek Dam: Difference between revisions

Coordinates: 27°22′16″S 152°38′13″E / 27.37111°S 152.63694°E / -27.37111; 152.63694
From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Tags: Mobile edit Mobile web edit
complete sentence
 
(10 intermediate revisions by 6 users not shown)
Line 56: Line 56:
| website = {{URL|http://www.csenergy.com.au/content-%28168%29-wivenhoe.htm|Wivenhoe Power Station}}
| website = {{URL|http://www.csenergy.com.au/content-%28168%29-wivenhoe.htm|Wivenhoe Power Station}}
}}
}}
The '''Splityard Creek Dam''' is a [[Rock-fill dam|rock]] and [[earth-fill dam|earth-fill]] [[embankment dam|embankment]] [[dam]] with an [[Spillway#Types|un-gated spillway]] across the Pryde Creek that is located in the [[South East Queensland|South East]] region of [[Queensland]], [[Australia]]. The sole purpose of the dam is for the generation of [[hydro-electric power|hydroelectricity]].<ref name=ancold>{{cite web|url=http://www.ancold.org.au/wp-content/uploads/2012/10/Dams-Australia-2010-v1-for-website.xls|format=[[Microsoft Excel|Excel]] (requires download)|title=Register of Large Dams in Australia|publisher=[[Australian National Committee on Large Dams]]|year=2010|accessdate=4 July 2014|work=Dams information}}</ref> The impounded [[reservoir]] is called the '''Splityard Creek Reservoir'''.
The '''Splityard Creek Dam''' is a [[Rock-fill dam|rock]] and [[earth-fill dam|earth-fill]] [[embankment dam|embankment]] [[dam]] with an [[Spillway#Types|un-gated spillway]] across the Pryde Creek that is located in the [[South East Queensland|South East]] region of [[Queensland]], [[Australia]]. The sole purpose of the dam is for the generation of [[hydro-electric power|hydroelectricity]].<ref name=ancold>{{cite web|url=http://www.ancold.org.au/wp-content/uploads/2012/10/Dams-Australia-2010-v1-for-website.xls|format=[[Microsoft Excel|Excel]] (requires download)|title=Register of Large Dams in Australia|publisher=[[Australian National Committee on Large Dams]]|year=2010|accessdate=4 July 2014|work=Dams information|archive-date=12 December 2013|archive-url=https://web.archive.org/web/20131212120804/http://www.ancold.org.au/wp-content/uploads/2012/10/Dams-Australia-2010-v1-for-website.xls|url-status=dead}}</ref> The impounded [[reservoir]] is called the '''Splityard Creek Reservoir'''.


==Location and features==
==Location and features==
The dam is located {{convert|30|km}} northwest of {{QLDcity|Ipswich}} in the [[Somerset Region]] and forms the upper reservoir for the [[Wivenhoe Power Station]].
The dam is located {{convert|30|km}} northwest of {{QLDcity|Ipswich}} in the [[Somerset Region]] and forms the upper reservoir for the [[Wivenhoe Power Station]].


Construction commenced in 1977 and was completed in 1980 by contractors [[Thiess Pty Ltd|Thiess Brothers]] and [[John Holland Group|John Holland]].<ref>{{cite web|url=http://www.floodcommission.qld.gov.au/__data/assets/file/0007/7792/Tarong_Energy_Appendix_11.PDF|title=Wivenhoe Power Station: Official Opening|publisher=Queensland Flood Commission|accessdate=4 January 2019}}</ref> The rock and earthfill dam structure is {{convert|76|m}} high and {{convert|1140|m}} long. The {{convert|3371|e3m3|adj=on}} dam wall holds back the {{convert|28600|ML|e6impgal+e6USgal|adj=on}} reservoir when at full capacity. From a [[drainage basin|catchment area]] of {{convert|3.8|km2}}, the dam creates an unnamed reservoir, with a surface area of {{convert|102|ha}}. The uncontrolled un-gated spillway has a discharge capacity of {{convert|570|m3/s}}.<ref name=ancold/> Initially managed by the [[Sunshine Coast Regional Council]], management of the dam was transferred to [[Seqwater]] in July 2008.
Construction commenced in 1977 and was completed in 1980 by contractors [[Thiess Pty Ltd|Thiess Brothers]] and [[John Holland Group|John Holland]].<ref>{{cite web|url=http://www.floodcommission.qld.gov.au/__data/assets/file/0007/7792/Tarong_Energy_Appendix_11.PDF|title=Wivenhoe Power Station: Official Opening|publisher=Queensland Flood Commission|accessdate=4 January 2019}}</ref> The rock and earthfill dam structure is {{convert|76|m}} high and {{convert|1140|m}} long. The {{convert|3371|e3m3|adj=on}} dam wall holds back the {{convert|28600|ML|e6impgal+e6USgal|adj=on}} reservoir when at full capacity. From a [[drainage basin|catchment area]] of {{convert|3.8|km2}}, the dam creates a reservoir with a surface area of {{convert|102|ha}}. The uncontrolled un-gated spillway has a discharge capacity of {{convert|570|m3/s}}.<ref name=ancold/> The asset was transferred to [[CleanCo Queensland]] in October 2019.


===Power station===
===Power station===
{{main|Wivenhoe Power Station}}
{{main|Wivenhoe Power Station}}
Owned and operated by [[CS Energy]], Wivenhoe Power Station is located on the eastern side of [[Wivenhoe Dam]], north west of Brisbane. The station, which began commercial operation in 1984, was Queensland’s first [[Pumped-storage hydroelectricity|pumped-storage]] hydro-electric plant. It is operated remotely from an operating centre used to manage the Queensland electricity grid.<ref name="wdseqw"/>
Owned by [https://www.cleancoqld.com.au/ CleanCo Queensland] and operated by [[CS Energy]], Wivenhoe Power Station is located on the eastern side of [[Wivenhoe Dam]], north west of Brisbane. The station, which began commercial operation in 1984, was Queensland's first [[Pumped-storage hydroelectricity|pumped-storage]] hydro-electric plant. It is operated remotely from an operating centre used to manage the Queensland electricity grid.<ref name="wdseqw"/>


The dam's water capacity is enough for the power station to run at full load for approximately ten hours. Using both pumps, this water can be replaced in about 14 hours. The pumped storage power station consists of two circular concrete silos, each of about {{convert|32|m}} internal diameter. Each of the silos houses a {{convert|250|MW}} turbine generator and pump set, giving a total capacity of {{convert|500|MW}}.<ref name="wdseqw">{{cite web|url=http://www.seqwater.com.au/public/source-store-treat-supply/dams/wivenhoe-dam|title=Wivenhoe Dam|publisher=[[Seqwater]]|accessdate=6 December 2012}}</ref>
The dam's water capacity is enough for the power station to run at full load for approximately ten hours. Using both pumps, this water can be replaced in about 14 hours. The pumped storage power station consists of two circular concrete silos, each of about {{convert|32|m}} internal diameter. Each of the silos houses a {{convert|250|MW}} turbine generator and pump set, giving a total capacity of {{convert|500|MW}}.<ref name="wdseqw">{{cite web|url=http://www.seqwater.com.au/public/source-store-treat-supply/dams/wivenhoe-dam|title=Wivenhoe Dam|publisher=[[Seqwater]]|accessdate=6 December 2012}}</ref>
Line 83: Line 83:
==External links==
==External links==
{{Commons category}}
{{Commons category}}
*[http://www.csenergy.com.au/content-(168)-wivenhoe.htm CS Energy]
*[http://www.csenergy.com.au/content-(168)-wivenhoe.htm CS Energy] {{Webarchive|url=https://web.archive.org/web/20120618095533/http://www.csenergy.com.au/content-(168)-wivenhoe.htm |date=18 June 2012 }}


{{WaterQueensland |state=autocollapse}}
{{WaterQueensland |state=autocollapse}}


[[Category:Reservoirs in Queensland]]
[[Category:Reservoirs in Queensland]]
[[Category:Somerset Region]]
[[Category:Buildings and structures in Somerset Region]]
[[Category:Dams in Queensland]]
[[Category:Dams in Queensland]]
[[Category:Dams completed in 1980]]
[[Category:Dams completed in 1980]]
Line 96: Line 96:
[[Category:Rock-filled dams]]
[[Category:Rock-filled dams]]
[[Category:Earth-filled dams]]
[[Category:Earth-filled dams]]


{{Australia-dam-stub}}
{{Queensland-struct-stub}}

Latest revision as of 05:28, 22 January 2024

Splityard Creek Dam
Splityard Creek Dam is located in Queensland
Splityard Creek Dam
Location of the Splityard Creek Dam
in Queensland
CountryAustralia
LocationSouth East Queensland
Coordinates27°22′16″S 152°38′13″E / 27.37111°S 152.63694°E / -27.37111; 152.63694
PurposeHydroelectricity[1]
StatusOperational
Construction began1977 (1977)
Opening date1980 (1980)
Dam and spillways
Type of damEmbankment dam
ImpoundsPryde Creek
Height76 m (249 ft)[1]
Length1,140 m (3,740 ft)[1]
Dam volume69×10^3 m3 (2.4×10^6 cu ft)[1]
Spillway typeUncontrolled
Spillway capacity570 m3/s (20,000 cu ft/s)[1]
Reservoir
Total capacity28,700 ML (6,300×10^6 imp gal; 7,600×10^6 US gal)[1]
Catchment area3.8 km2 (1.5 sq mi)[1]
Surface area105 ha (260 acres)[1]
Maximum width294 m (965 ft)
Wivenhoe Power Station
Operator(s)CS Energy
Commission date1984 (1984)
TypePumped-storage
Turbines2
Installed capacity500 megawatts (670,000 hp)
Website
Wivenhoe Power Station

The Splityard Creek Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Pryde Creek that is located in the South East region of Queensland, Australia. The sole purpose of the dam is for the generation of hydroelectricity.[1] The impounded reservoir is called the Splityard Creek Reservoir.

Location and features

[edit]

The dam is located 30 kilometres (19 mi) northwest of Ipswich in the Somerset Region and forms the upper reservoir for the Wivenhoe Power Station.

Construction commenced in 1977 and was completed in 1980 by contractors Thiess Brothers and John Holland.[2] The rock and earthfill dam structure is 76 metres (249 ft) high and 1,140 metres (3,740 ft) long. The 3,371-thousand-cubic-metre (119.0×10^6 cu ft) dam wall holds back the 28,600-megalitre (6,300×10^6 imp gal; 7,600×10^6 US gal) reservoir when at full capacity. From a catchment area of 3.8 square kilometres (1.5 sq mi), the dam creates a reservoir with a surface area of 102 hectares (250 acres). The uncontrolled un-gated spillway has a discharge capacity of 570 cubic metres per second (20,000 cu ft/s).[1] The asset was transferred to CleanCo Queensland in October 2019.

Power station

[edit]

Owned by CleanCo Queensland and operated by CS Energy, Wivenhoe Power Station is located on the eastern side of Wivenhoe Dam, north west of Brisbane. The station, which began commercial operation in 1984, was Queensland's first pumped-storage hydro-electric plant. It is operated remotely from an operating centre used to manage the Queensland electricity grid.[3]

The dam's water capacity is enough for the power station to run at full load for approximately ten hours. Using both pumps, this water can be replaced in about 14 hours. The pumped storage power station consists of two circular concrete silos, each of about 32 metres (105 ft) internal diameter. Each of the silos houses a 250 megawatts (340,000 hp) turbine generator and pump set, giving a total capacity of 500 megawatts (670,000 hp).[3]

Recreation

[edit]

Public access including swimming is banned from the dam due to strong currents and submerged hazards.

See also

[edit]

References

[edit]
  1. ^ a b c d e f g h i j "Register of Large Dams in Australia". Dams information. Australian National Committee on Large Dams. 2010. Archived from the original (Excel (requires download)) on 12 December 2013. Retrieved 4 July 2014.
  2. ^ "Wivenhoe Power Station: Official Opening" (PDF). Queensland Flood Commission. Retrieved 4 January 2019.
  3. ^ a b "Wivenhoe Dam". Seqwater. Retrieved 6 December 2012.
[edit]