46 CFR Subpart 35.35 - Subpart 35.35—Cargo Handling
- § 35.35-1 Persons on duty—TB/ALL.
- § 35.35-4 Insulating flange joint or nonconductive hose—TB/ALL.
- § 35.35-5 Electrical bonding—TB/ALL.
- § 35.35-10 Closing of freeing-ports, scuppers, and sea valves—TB/ALL.
- § 35.35-15 Connecting for cargo transfer—TB/ALL.
- § 35.35-20 Inspection before transfer of cargo—TB/ALL.
- § 35.35-25 Approval to start transfer of cargo—TB/ALL.
- § 35.35-30 “Declaration of Inspection” for tank vessels—TB/ALL.
- § 35.35-35 Duties of person in charge of transfer—TB/ALL.
- § 35.35-40 Conditions under which transfer operations shall not be commenced or if started shall be discontinued—TB/ALL.
- § 35.35-42 Restrictions on vessels alongside a tank vessel loading or unloading cargo of Grade A, B, or C—TB/ALL.
- § 35.35-45 Auxiliary steam, air, or electric current—B/ALL.
- § 35.35-50 Termination of transfer operations—TB/ALL.
- § 35.35-55 Transfer of other cargo or stores on tank vessels—TB/ALL.
- § 35.35-60 Transportation of other cargo or stores on tank barges—B/ALL.
- § 35.35-70 Maintenance of cargo handling equipment—TB/ALL.
- § 35.35-75 Emergencies—TB/ALL.
- § 35.35-85 Air compressors—TB/ALL.