0% found this document useful (0 votes)
210 views2 pages

ABB Malaysia Meeting Minutes: Vale Substation

The minutes of meeting document summarizes a project meeting that took place on August 23, 2012 at 2:00 pm at the ABB site cabin. The meeting addressed the Vale 275/33kv main intake subsation project and had three agenda items: 1) Excavation of the busbar and fem, 2) Issues with heavy rain, and 3) Air conditioning installation and wiring at the site office. Action items from the meeting included excavating that week to start the busbar and FEM, preparing a pump to pump water from the switchyard and control building due to heavy rain, and completing the air conditioning and wiring at the site office by August 30.

Uploaded by

Luqman Osman
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
210 views2 pages

ABB Malaysia Meeting Minutes: Vale Substation

The minutes of meeting document summarizes a project meeting that took place on August 23, 2012 at 2:00 pm at the ABB site cabin. The meeting addressed the Vale 275/33kv main intake subsation project and had three agenda items: 1) Excavation of the busbar and fem, 2) Issues with heavy rain, and 3) Air conditioning installation and wiring at the site office. Action items from the meeting included excavating that week to start the busbar and FEM, preparing a pump to pump water from the switchyard and control building due to heavy rain, and completing the air conditioning and wiring at the site office by August 30.

Uploaded by

Luqman Osman
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

ABB Malaysia Sdn Bhd

FORM

Form No: UT-QA-F04 Sheet : 1 of 2

Rev.: 1 Issue 2 Date: 10.03.09

MINUTES OF MEETING

Project Name: Vale 275/33kv main intake subsation Meeting No.: 1


Date Time Venue : : : 23/8/12 2.00 pm ABB site cabin Prepared By Div./Dept. Next Meeting : : : Fittry Field & service department

Attendees Prince Zainorin Fittry

Company ABB ABB ABB

Absentees

Company

Hand out Weekly work schedule

Agenda 1. Excavation busbar and fem 2. Heavy rain issue 3. Aircond installation and wiring site office

Presenter/Facilitator Mr Prince Mr Zainorin Mr Prince

Item 1. 2. 3.

Description Action Need excavate this week to start busbar and FEM WWEC Prepare pump to pump out water from switchyard and control WWEC building Aircond and wiring at site office WWEC

Due Date -30/8/12 -23/8/12 -30/8/12

ABB Malaysia Sdn Bhd


FORM

Form No: UT-QA-F04 Sheet : 2 of 2

Rev.: 1 Issue 2 Date: 10.03.09

MINUTES OF MEETING