UNIVERSITI TEKNOLOGI MALAYSIA
SKUDAI, JOHOR
GROUP ASSIGNMENT
SEE 4443: POWER SYSTEM ANALYSIS
LECTURER: DR. SAIFULNIZAM BIN ABD KHALID
GROUPS MEMBER :
1.
2.
3.
4.
5.
6.
7.
8.
9.
NAME
FATIN HAMIMAH BINTI MOHAMED SALLEH
MOHD FAIZAL BIN OMAR
SHAIK ABDUL ANUAR BIN ABDUL RASHID
MOHD SHAFIZAN BIN BAHARUDDIN
MATRIX NO.
SX090583EEJ03
SX090597EEJ03
SX090629EEJO
3
SX090591EEJ03
Using Iteration Method
Converting Impedance to Admittance
Line
Bus to bus
1-2
1-3
2-3
Impedance (Z)
R(p.u)
X(p.u)
0.01008
0.0504
0.00744
0.0372
0.01008
0.0504
Admittance (y)
y(p.u)
3.8156-j19.0781
5.1696-j25.8478
3.8156-j19.0781
= Y
21
Y
Y
31
11
BUS
12
22
32
Shunt Y
Y(p.u)
0.1025
0.0775
0.1025
Y
Y
13
23
33
jB jB
Y11 = y12 + y13 + 12 + 13
2 2
j 0.1025 j 0.0775
+
2
2
= 3.8156 - 19.0781j + 5.1696 - 25.8478j +
= 8.9852 - j44.8359
Y12 = Y21 = y12 = - 3.8156 +19.0781j
Y13 = Y31 = y13 = - 5.1696 + 25.8478j
jB jB
Y22 = y 21 + y 23 + 21 + 23
2 2
j 0.1025 j 0.1025
+
2
2
= 3.8156 - j19.0781 + 3.8156 - j19.0781 +
= 7.6312 - j38.0537
Y23 = Y32 = y 23
= - 3.8156 + j19.0781
jB jB
Y33 = y31 + y 32 + 31 + 32
2 2
j 0.0775 j 0.1025
+
2
2
= 5.1696 - j25.8478 + 3.8156 - j19.0781 +
= 8.9852 - j44.8359
BUS
8.9852 - j44.8359
- 3.8156 + j19.0781
- 5.1696 + j 25.8478
-3.8156 +19.0781j
7.6312 - j38.0537
- 3.8156 + j19.0781
-5.1696 + 25.8478j
- 3.8156 + j19.0781
8.9852 - j44.8359
Bus Voltage Magnitude & Phase Angle
i)
Note that,
Bus 1 = Slack Bus
Bus 2 = PQ Bus/ Load Bus
Bus 3 = PV Bus
Given
V1
(0)
= 1.03+j0
----------constant
V2
(0)
= 0.9596-j0.1248
----------flat voltage
V3
(0)
= 1.0199-j0.0135
----------flat voltage
At Bus 2:
S2
sch
P2 + jQ2
100
500 j100
100
...................................
P2 = PG 2 PL 2 = 0 500 = -500
Q2 = QG 2 QL 2 = 0 100 = -100
= -5 j1 p.u
(1)
V2
1 P2 jQ2 (0) (0)
Y21V1 + Y23V3
Y22 V2 *
1 5+ j ( -3.8156+ 19.0781j) (1.03+ j0) +
7.6312- j38.0537 0.9596+ j0.1248 ( -3.8156+ j19.0781) (1.019 - j0.0135)
1
= 7.6312 - j38.0537 [ 4.9906 + j1.6911 [3.9301 + j19.6504 3.6340 + j19.5093]]
= 0.9596 j0.1248 p.u
= 0.9677 7.4104 0 p.u
To stop iteration,
V2
(1)
V2
(0)
0.9596 - 0.9596
0.001
0.001
< 0.001
0.000
Then,
V2
= 0.9677
2 = -7.4104
At Bus 3:
S3
sch
P3 + jQ3
100
...................................
200 + j 42.53
100
P3 = PG 3 PL 3 = 200 - 0 = 200
Q3 = QG 3 Q L 3 = 42.53 - 0 =
42.53
= 2 + j0.4253 p.u
V3
(1)
1 P3 jQ3 (0) (1)
Y31V1 + Y32V2
Y33 V3 *
1 2 j0.4253 ( -5.1696+ j25.8478) (1.03+ j0) +
8.9852- j4 .8359 1.019 + j0.0135 ( -3.8156+ j19.0781) ( 0.9596- j0.1248 )
1
= 8.9852 - j44.8359 [1.9551 j 0.4429 [5.3247 + j 26.6232 1.2805 + j18.7835]]
= 1.0200 j0.0135 p.u
= 1.0200 0.7565 0 p.u
To stop iteration,
7
V3(1) V3( 0)
0.001
1.0200 - 1.0199
0.001
0.000
< 0.001
Then,
3 = -0.7565
V3
= 1.0200
ii)
Generation and load at each bus in MW and MVar
Line current flow:
I 12 =
V1 V2
Z 12
1.03 (0.9596 - j0.1248)
0.01008 + j 0.0504
= 2.6496 j0.8669 p.u
I 21 = I 12 = - 2.6496 + j0.8669 p.u
I 13 =
V1 V3
Z 13
1.03 (1.0200 - j0.0135)
0.00744 + j 0.0372
= 0.4006 j0.1887 p.u
I 31 = I 13 = - 0.4006 + j0.1887 p.u
I 23 =
V2 V3
Z 23
(0.9596 - j0.1248) (1.0200 - j0.0135)
0.01008 + j 0.0504
= -2.3539 + j0.7276 p.u
I 32 = I 23 = 2.3539 j0.7276 p.u
Line flows:
S12 =
V1 I 12 *
= 1.03( 2.6496 + j0.8669 )
= 2.7291 + j0.8929 p.u ..........................272.91MW + j89.29Mvar
S 21 =
V2 I 21 *
= ( 0.9596 - j0.1248 )( 2.6496 - j0.8669 )
= -2.6507 j0.5012 p.u ......................-265.07MW j50.12MVar
S13 =
V1 I 13 *
9
= 1.03( 0.4006 + j0.1887 )
= 0.4126 + j0.1944 p.u ..........................41.26MW+ j19.44MVar
S 31 =
V3 I 31 *
= (1.0200 - j0.0135 )( - 0.4006 - j0.1887 )
= -0.4112 - j0.1871 p.u ..........................-41.12MW - j18.71MVar
S 23 =
V2 I 23 *
= ( 0.9596 - j0.1248 )( - 2.3539 - j0.7276 )
= -2.3496 j0.4044 p.u ..........................-234.96MW j40.44MVar
S 32 =
V3 I 32 *
= (1.0200 - j0.0135 )( 2.3539 + j0.7276 )
= 2.4108 + j0.7103 p.u ..........................241.08MW + j71.03MVar
Line loses
S L12 = S12 + S 21
= (272.91MW + j89.29Mvar)+( -265.07MW j50.12Mvar)
= 7.84MW + j39.17MVar
S L13 = S13 + S 31
= (41.26MW+ j19.44Mvar) + (-41.12MW - j18.71Mvar)
= 0.14MW + j0.73Mvar
10
S L 23 = S 23 + S 32
= (-234.96MW j40.44Mvar) + (241.08MW + j71.03Mvar)
= 6.12MW + j30.59MVar
iii)
The Total MW and Mvar loses in the system
S TOTALLOSES = S L12 + S L13 + S L 23
= (7.84MW + j39.17Mvar) + (0.14MW + j0.73Mvar) + (-476.04MW + j30.59Mvar)
= - 468.06MW + j70.49MVar
Using Power World
11
Branch data for 3-Bus system
12
Result
At Bus 1
At Bus 2
13
At Bus 3
14
15
Comparison Table
Parameter
Bus voltage,
magnitude and
phase angle
Calculation result
Simulation result
Bus 1: 1.03<0 p.u
Bus 1: 1.03<0 p.u
Bus 2: 0.9677 7.4104 0
p.u
Bus 2: 0.9677 7.4104 0 p.u
Bus 3: 1.0200 0.7565 0 p.u
Bus 3: 1.0200 0.7565 0 p.u
I 12 = 2.6496 j0.8669 p.u
I 12 = -2.6496 + j0.8669 p.u
Generation and
load at each bus in
MW and MVar
I 13 = 0.4006 j0.1887 p.u
I 31 = - 0.4006 + j0.1887 p.u
I 23 = -2.3539 + j0.7276 p.u
I 32 = 2.3539 j0.7276 p.u
The flow of MW and
Mvar from that bus
over each
transmission line
connected to the
bus
The total MW and
Mvar losses in the
system
S12 = 272.91MW + j89.29Mvar
S12 = 272.88MW + j83.86Mvar
S 21 = -265.07MW j50.12Mvar
S 21 = -265.05MW j54.93Mvar
S13 = 41.26MW+ j19.44Mvar
S13 = 41.21MW+ j15.58Mvar
S 23 = -234.96MW j40.44Mvar
S 23 =-234.95MW j45.07Mvar
S 32 = 241.08MW + j71.03MVar
S 32 =241.07MW + j65.52MVar
SL12 = 7.833MW + j28.928Mvar
SL12 = 7.84MW + j39.17Mvar
SL13 = 0.146MW j7.411Mvar
SL13 = 0.14MW + j0.73Mvar
SL23 = 6.17MW + j20.453Mvar
SL23 = 6.12MW + j30.59MVar
16
STOTAL LOSSES =-468.06MW +
j70.49MVar
STOTAL LOSSES =14.0279MW + j41.97
Discussion
Discuss the methods to ensure that good operating condition of power system is
maintained when there is appreciable drop in voltage on the primary of a transformer
caused by a change of load.
To ensure that good operating condition of power system is maintained when there is
appreciable drop in voltage on the primary of a transformer caused by a change of
load.Its could be done by power flow analysis which examines normal steady state and
contingency conditions in an electrical system. The results are used to optimize the
loading of electrical distribution equipment, establish reactive power flows needed to
stabilize bus voltages, determine transformer tap settings and minimize system losses.
17