0% found this document useful (0 votes)
82 views36 pages

Structural Member Retrofitting Details

The document provides structural details for renovations and repairs to multiple units across two buildings numbered 24 and 25. It includes specifications on beam, column, and shear wall repairs by unit and area. It also outlines specifications for soap niches, washer/dryer installations, slab soffit work, and ceiling cladding by unit and area. The total cost for all repairs is estimated at $902,658.09 plus 12% VAT for a total amount due of $1,010,977.06.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views36 pages

Structural Member Retrofitting Details

The document provides structural details for renovations and repairs to multiple units across two buildings numbered 24 and 25. It includes specifications on beam, column, and shear wall repairs by unit and area. It also outlines specifications for soap niches, washer/dryer installations, slab soffit work, and ceiling cladding by unit and area. The total cost for all repairs is estimated at $902,658.09 plus 12% VAT for a total amount due of $1,010,977.06.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

UNIT

LOCATION
LIVING

2401

COMMON T&B - CORRIDOR

2402
2403
2404
2412
2414

LIVING
MASTER
LIVING
LIVING
MASTER
COMMON T&B
COMMON T&B - CORRIDOR

LIVING
2417
2501

COMMON T&B - CORRIDOR

LIVING
MASTER
BR 2
LIVING
MASTER
BR 2
LIVING
BR 2
MASTER
LIVING
MASTER

2504

2505
2512
2514
2515
2516
2517

UNIT
2401
2404
2405
2406
2407
2407A
2415
2416
2506
2514

UNIT
2405
2412
2505

LOCATION
LIVING
MASTER
BR 2
MASTER
LIVING
LIVING
LIVING
MASTER
LIVING
LIVING
BR 2

LOCATION
COMMON T&B
COMMON T&B
COMMON T&B

STRUCTURAL MEMBER RETRIFICATION


BEAM
AREA
qty/unit TOTAL AREAMATERIAL
1.2
0.66
1.6371
1.2833
1.6422
0.6
0.36
0.671
0.2915
2.147
0.66
m
24.0071
480
3.575
0.45
0.67
0.671
0.867
0.825
1.8668
0.375
0.1798
1.288
1.0374

AREA
0.875
0.36
0.8155
0.2576
2.16
1.568
2.7494
0.91
1.832
0.312
2.784

AREA
6.2746
6.528
6.2746

COLUMN
qty/unit TOTAL AREAMATERIAL

15.2835

480

SHEARWALL
qty/unit TOTAL AREAMATERIAL
m

26.8052

480

m
2512

UNIT

2401
2402
2403

2404

2405
2406
2406A
2407
2407A
2408
2409
2410
2411

2412

2414
2415
2416

2417

2501
2502
2503

2504

2505

26.8052

480

COMMON T&B

6.528

LOCATION
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B

SOAPNICHE (AND RELOCATION)


AREA
qty/unit TOTAL AREAMATERIAL
0.09
0.09
0.18
0.09
0.09
0.09
0.18
0.09
0.18
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09
0.18
m
6.03
480
0.09
0.09
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09

2506
2506A
2507
2507A
2508
2509
2510
2511

25412

2514
2515
2516

24517

COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B

0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09
0.18
0.09
0.18
0.09
0.09
0.09
for REPLACEMENT

UNIT
2402
2407
2408
2416
2517

UNIT
2402
2403
2415
2416
2502
2503
2515
2516

KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN

WASHER AND DRYER SQUARENESS


AREA
qty/unit TOTAL AREAMATERIAL
0.09
0.09
m
0.45
480
0.09
0.09
0.09

KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN

WASHER AND DRYER LOW WALL


AREA
qty/unit TOTAL AREAMATERIAL
1.86
1.86
1.86
1.86
m
14.88
800
1.86
1.86
1.86
1.86

LOCATION

LOCATION

* The documentation of low walls are included in the punchlist submitted last Nove

SLAB SOFFIT RETRIFICATION

UNIT

2401
2402
2403

2404
2405
2406
2406A
2407
2408
2409
2410
2411
2412
2414
2415
2416

2417

2501
2502
2505
2506
2506A
2507
2508
2509

LOCATION
LIVING
BR 2
MASTER
LIVING
MASTER
LIVING
MASTER
LIVING
MASTER
BR 2
MASTER
BR 2
LIVING
LIVING
LIVING
LIVING
MASTER
LIVING
LIVING
LIVING
MASTER
BR 2
LIVING
MASTER
LIVING
MASTER
LIVING
MASTER
LIVING
MASTER
BR 2
BR 3
LIVING
BR 2
MASTER
LIVING
MASTER
LIVING
LIVING
LIVING
LIVING
MASTER
LIVING

AREA

CEILING CLADDING
qty/unit TOTAL AREAMATERIAL

34.5855
32.0588
32.5768
35.684
15.315
11.84
11.918
11.8482
21.4455
12.3
12.12
12.15
15.2265
33.113
35.125
31.41

45.1136

34.07
24
8.555
12.6575
11.9475
11.9475
21.2175
12.095

655.2049

850

2510
2511

2512
2514
2515
2517

LIVING
LIVING
LIVING
MASTER
BR 2
LIVING
MASTER
MASTER
LIVING
MASTER

12.095
12.505
25.555
32.17
9.45
23.11

TRIFICATION
LABOR

TOTAL

200

680

LABOR

TOTAL

200

680

LABOR

TOTAL

200

680

TOTAL COST

16,324.83

24.0071

TOTAL COST

10,392.78

TOTAL COST
18,227.54

0.00675

200

680

18,227.54

LABOR

TOTAL

OCATION)
TOTAL COST

0.00675

200

680

4,100.40

UARENESS
LABOR

200

TOTAL

TOTAL COST

700

315
V

OW WALL
LABOR

400

TOTAL

TOTAL COST

1,200

nchlist submitted last November 12, 2014

CATION

17,856.00
V

NG
LABOR

450

TOTAL

1,300

TOTAL COST

851,766.37

662.8049

TOTAL AMOUNT:
with 12% VAT
TOTAL MOUNT DUE:

902,658.09
108,318.97
1,010,977.06

811720.4446
856,980.59
838,438.05
838,753.05

838,753.05

UNIT

LOCATION
LIVING

2401

COMMON T&B - CORRIDOR

2402
2403
2404
2412
2414

LIVING
MASTER
LIVING
LIVING
MASTER
COMMON T&B
COMMON T&B - CORRIDOR

LIVING
2417
2501

COMMON T&B - CORRIDOR

LIVING
MASTER
BR 2
LIVING
MASTER
BR 2
LIVING
BR 2
MASTER
LIVING
MASTER

2504

2505
2512
2514
2515
2516
2517

UNIT
2401
2404
2405
2406
2407
2407A
2415
2416
2506
2514

UNIT
2405
2412
2505

LOCATION
LIVING
MASTER
BR 2
MASTER
LIVING
LIVING
LIVING
MASTER
LIVING
LIVING
BR 2

LOCATION
COMMON T&B
COMMON T&B
COMMON T&B

STRUCTURAL MEMBER RETRIFICATION


BEAM
AREA
qty/unit TOTAL AREA MATERIAL
1.2
0.66
1.6371
1.2833
1.6422
0.6
0.36
0.671
0.2915
2.147
0.66
m
22.9571
500
3.575
0.45
0.67
0.671
0.867
0.825
1.8668
0.375
0.1798
1.288
1.0374

AREA
0.875
0.36
0.8155
0.2576
2.16
1.568
2.7494
0.91
1.832
0.312
2.784

AREA
6.2746
6.528
6.2746

COLUMN
qty/unit TOTAL AREA MATERIAL

14.6235

500

SHEARWALL
qty/unit TOTAL AREA MATERIAL
m

25.6052

500

m
2512

UNIT

2401
2402
2403

2404

2405
2406
2406A
2407
2407A
2408
2409
2410
2411

2412

2414
2415
2416

2417

2501
2502
2503

2504

2505

25.6052

500

COMMON T&B

6.528

LOCATION
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B

SOAPNICHE (AND RELOCATION)


AREA
qty/unit TOTAL AREA MATERIAL
0.09
0.09
0.18
0.09
0.09
0.09
0.18
0.09
0.18
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09
0.18
m
6.03
500
0.09
0.09
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09

2506
2506A
2507
2507A
2508
2509
2510
2511

25412

2514
2515
2516

24517

COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B
MASTER T&B
COMMON T&B
MAID'S T&B
COMMON T&B
COMMON T&B
MASTER T&B
COMMON T&B
MAID'S T&B

0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.18
0.09
0.09
0.09
0.09
0.18
0.09
0.18
0.09
0.09
0.09
for REPLACEMENT

UNIT
2402
2407
2408
2416
2517

UNIT
2402
2403
2415
2416
2502
2503
2515
2516

KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN

WASHER AND DRYER SQUARENESS


AREA
qty/unit TOTAL AREA MATERIAL
0.09
0.09
m
0.45
500
0.09
0.09
0.09

KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN

WASHER AND DRYER LOW WALL


AREA
qty/unit TOTAL AREA MATERIAL
1.86
1.86
1.86
1.86
m
14.88
850
1.86
1.86
1.86
1.86

LOCATION

LOCATION

* The documentation of low walls are included in the punchlist submitted last No

SLAB SOFFIT RETRIFICATION

UNIT

2401
2402
2403

2404
2405
2406
2406A
2407
2408
2409
2410
2411
2412
2414
2415
2416

2417

2501
2502
2505
2506
2506A
2507
2508
2509

LOCATION
LIVING
BR 2
MASTER
LIVING
MASTER
LIVING
MASTER
LIVING
MASTER
BR 2
MASTER
BR 2
LIVING
LIVING
LIVING
LIVING
MASTER
LIVING
LIVING
LIVING
MASTER
BR 2
LIVING
MASTER
LIVING
MASTER
LIVING
MASTER
LIVING
MASTER
BR 2
BR 3
LIVING
BR 2
MASTER
LIVING
MASTER
LIVING
LIVING
LIVING
LIVING
MASTER
LIVING

AREA

CEILING CLADDING
qty/unit TOTAL AREA MATERIAL

34.5855
32.0588
32.5768
35.684
15.315
11.84
11.918
11.8482
21.4455
12.3
12.12
12.15
15.2265
33.113
35.125
31.41

45.1136

34.07
24
8.555
12.6575
11.9475
11.9475
21.2175
12.095

655.2049

950

2510
2511

2512
2514
2515
2517

LIVING
LIVING
LIVING
MASTER
BR 2
LIVING
MASTER
MASTER
LIVING
MASTER

12.095
12.505
25.555
32.17
9.45
23.11

RIFICATION
LABOR

TOTAL

550

1050

LABOR

TOTAL

550

1050

TOTAL COST

24,104.96

< chipping works

TOTAL COST

15,354.68
< chipping works

LABOR

TOTAL

550

1050

TOTAL COST
26,885.46

0.00675

550

1050

LABOR

TOTAL

26,885.46

CATION)

550

1,050

TOTAL COST

6,331.50

0.00675

ARENESS
LABOR

550

TOTAL

TOTAL COST

1,050

473

W WALL
LABOR

550

TOTAL

1,400

hlist submitted last November 12, 2014

ATION

TOTAL COST

20,832.00

G
LABOR

500

TOTAL

1,450

TOTAL COST

950,047.11

TOTAL AMOUNT:
with 12% VAT
TOTAL MOUNT DUE:

1,019,923.24
122,390.79
1,142,314.03

811720.4446

UNIT
2401
2403
2404
2406
2406a
2410
2411
2414
2415
2417
2501
2503
2504
2506
2506A
2510
2511
2514
2515
2517

UNIT

2401
2402
2403

2404

2405
2406
2406A
2407

LOCATION
2
2
LONGER
1
1
1
1
LONGER
2
2
2
2
L
1
1
1
1
L
2
2

LOCATION
BR 2
MAS
BR 3
KITCHEN
MAS
KITCHEN
MAS
KITCHEN
MAS
BR 2
KITCHEN
MAS
BR 2
KITCHEN
LIVING
KITCHEN
LIVING
KITCHEN
LIVING

AREA

BALCONY REGLET PLASTER


qty/unit
TOTAL AREA
MATERIAL

LABOR

CONCRETE TOPPING (CABINET AREA AND KITCHEN)


AREA
qty/unit
TOTAL AREA
MATERIAL
LABOR

2407
2407A
2408
2409
2410
2411

2412

2414
2415
2416

2417

UNIT

2501
2502
2503

2504

2505
2506
2506A

KITCHEN
MAS
KITCHEN
MAS
KITCHEN
LIVING
KITCHEN
LIVING
KITCHEN
LIVING
KITCHEN
MAS
BR 2
KITCHEN
MAS
BR 2
KITCHEN
MAS
KITCHEN
MAS
KITCHEN
MAS
BR 2
BR 3
KITCHEN

LOCATION
BR 2
MAS
BR 3
KITCHEN
MAS
KITCHEN
MAS
KITCHEN
MAS
BR 2
KITCHEN
MAS
BR 2
KITCHEN
LIVING
KITCHEN
LIVING

CONCRETE TOPPING (CABINET AREA AND KITCHEN)


AREA
qty/unit
TOTAL AREA
MATERIAL
LABOR

2506A
2507
2507A
2508
2509
2510
2511

2412

2514
2515
2516

2517

KITCHEN
LIVING
KITCHEN
MAS
KITCHEN
MAS
KITCHEN
LIVING
KITCHEN
LIVING
KITCHEN
LIVING
KITCHEN
MAS
BR 2
KITCHEN
MAS
BR 2
KITCHEN
MAS
KITCHEN
MAS
KITCHEN
MAS
BR 2
BR 3
KITCHEN

TOTAL

TOTAL COST

TOTAL

TOTAL COST

CHEN)

CHEN)
TOTAL

TOTAL COST

You might also like