0% found this document useful (0 votes)
51 views18 pages

Scenario of Mech. Work Rev-A

The document outlines the plans for mechanical works and firefighting network installations at storage, processing, and juice preparation areas of the Beity Plant Extension Project. Key steps include erecting scaffolding, identifying work areas, installing pipes and supports, pressure testing, and installing sprinklers. Air conditioning work will involve identifying unit locations, fabricating bases, lifting units with cranes, and making openings for ducts. Safety measures such as evacuating areas and specifying labor numbers are also covered. Diagrams show scaffolding, equipment, and material access and flow.

Uploaded by

hesham3bbas
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views18 pages

Scenario of Mech. Work Rev-A

The document outlines the plans for mechanical works and firefighting network installations at storage, processing, and juice preparation areas of the Beity Plant Extension Project. Key steps include erecting scaffolding, identifying work areas, installing pipes and supports, pressure testing, and installing sprinklers. Air conditioning work will involve identifying unit locations, fabricating bases, lifting units with cranes, and making openings for ducts. Safety measures such as evacuating areas and specifying labor numbers are also covered. Diagrams show scaffolding, equipment, and material access and flow.

Uploaded by

hesham3bbas
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Beity Plant Extension Project No.

: 1607-P1-b

ScenarioofsitesMechanicalWorks
Firefightingnetworkinstallations

Storagearea(B03)
1 Thecontractorwillaskedtheownerbeforestartinghisworkswith4daysto evacuatetheworkingareabetweentheracksandtheupperlevelofitin ordertobeabletowork 2 Thestorageareawillbedividedintothreepartsinthestoragearea. 3 Thecontractorwillstartinstallationofscaffoldingineachareafromthe groundtoupasshowninthe(fig1.)otherwiseovertheracksifaccepted.

Redarrows:Scaffolding Blackarrows:Labors&Materials

(Fig1)
GAMAForTrading&Contracting 1

Beity Plant Extension Project No.: 1607-P1-b 4 Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig2.)Showingtheentrance&theexitofthematerials&labors.

(Fig2) 5 Thelocutionofpowersupplypanelforeclectictoolsisshowing(fig3.) WhereonlythedrillingM/C&thecuttingM/Cwellbeused

(Fig3) 6Thenumberoflaborswhichwillworkatetchareaitwillbespecifiedindaily report&willnotbelessthan45workers/eacharea


GAMAForTrading&Contracting 2

Beity Plant Extension Project No.: 1607-P1-b 7 Paintingofthepipeswiththetwolayersofprimercoatwillbeoutsidethe site&thefinishlayerwillbeinsite. 8Thefabricationofpipesitswillbeinourworkshopyardoutsidetheworking areaasshowing(Fig4)

(Fig4) 9installationoffirefightingpipessupports(usingEquipmentDrillonlyand thereisnohotworks) 10Usingfixedscaffoldingabovetheracksortendenciesfloorsandmoving scaffoldingatflatfloorandcorridorstoInstallationofsupportsandpipes 11Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanually fromtheworkshoptotheplaceofinstallationandlargediameters(largerthan 2.5")transportitbyhandvehicletotheplacesofinstallation. 12Liftingpipeswithlargediametersfromthegroundtotheinstallationplaces byBlancoandliftingpipeswithsmalldiameterstotheplaceofinstallationby Handrollerspull 13Afterfinishingoftheinstallationworkandinstallationofpipesthenwater pressuretestforpipeswillbedone 14Afterthepressuretests,installationofsprinklers.

GAMAForTrading&Contracting 3

Beity Plant Extension Project No.: 1607-P1-b

AirConditioninginstallations:
1 Stepsforinstallationoffans(rooftopfans)
1 Identifyingtheplacesofthefansaccordingtotheapproveddrawing 2Thecontractorwillstartinstallationofscaffoldingineachareafromthe Groundtoupasshowninthe(fig1.)otherwiseovertheracksifaccepted

(Fig1) 3Thelocationofpowersupplypanelforeclectictoolsisshowing(fig2) WhereonlythedrillingM/C&thecuttingM/Cwellbeused

GAMAForTrading&Contracting

Beity Plant Extension Project No.: 1607-P1-b

(Fig2) 4Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig3)showingtheentrance&theexitofthematerials

(Fig3) 5Makethenecessarystrengtheningintheinternalceilingforthesteel structureaccordingtoapproveddrawings.


GAMAForTrading&Contracting 5

Beity Plant Extension Project No.: 1607-P1-b

6Installtheframewherethefanswillbeinstalledon 7Makeopeningsinthecorditesheetmetalwhichwillbefrominsidethe building 8Installation&fixingthecurbfromabovethesteelstructure 9Liftingthefansbycranes&fixingitabovetothecurb 10Supplying&installationelectriccablesfromthefanstotheelectrical board


6

GAMAForTrading&Contracting

Beity Plant Extension Project No.: 1607-P1-b

Firefightingnetworkinstallations

Processingarea(B03groundfloor)
1 Thecontractorwillaskedtheownerbeforestartinghisworkswith4daysto evacuatetheworkingareabetweentheracksandtheupperlevelofitinorder tobeabletowork 2 Thecontractorwillstartinstallationofscaffoldingineachareafromthe groundtoupasshowninthe(fig1.)

Fig1
GAMAForTrading&Contracting 7

Beity Plant Extension Project No.: 1607-P1-b 3 Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig2.)Showingtheentrance&theexitofthematerials

(Fig2) 4 Thelocationofpowersupplypanelforeclectictools(fig3.)

Fig3
GAMAForTrading&Contracting 8

Beity Plant Extension Project No.: 1607-P1-b 5Thenumberoflaborswhichwillworkatetchareaitwillbespecifiedindaily report&willnotbelessthan45workers/eacharea 6Thefabricationofpipesitswillbeinoutsideattheworkshoparea(fig4.)

(Fig4) 7Installationoffirefightingpipessupports(usingEquipmentDrillonlyandthere isnohotworks) 8UsingfixedscaffoldinginFlooringleaningandmovingscaffoldingatflatfloor andcorridorstoInstallationofsupportsandpipes 9InstallandfixcantileversupportsinColumnsofsteelstructureformainloops andthreadedrodsforbranchespipesbyfixeditinpearlinessthatinupperfloor passagethroughthesandwichpanel 10Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanuallyfrom theworkshoptotheplaceofinstallationandlargediameters(largerthan2.5") transportitbyhandvehicletotheplacesofinstallation. 11Liftingpipeswithlargediametersfromthegroundtotheinstallationplacesby BlancoandliftingpipeswithsmalldiameterstotheplaceofinstallationbyHand rollerspull 12Afterfinishingoftheinstallationworkandinstallationofpipesthenwater pressuretestforpipeswillbedone 13Afterthepressuretests,installationofsprinklers.
GAMAForTrading&Contracting 9

Beity Plant Extension Project No.: 1607-P1-b

Firefightingnetworkinstallations

Juicepreparationarea(B02)
1 Thecontractorwillaskedtheownerbeforestartinghisworkswith48hours toevacuatetheworkingareabetweentheracksandtheupperlevelofitin ordertobeabletowork 2 Thecontractorwillstartinstallationofscaffoldinginetchareafromthe groundtoupasshowninthe(fig1.)Someareaswillbefixedscaffolding(above thetanksandM/C)andotherswillbemovingscaffolding

(fig1) 3 Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig2.)Showingtheentrance&theexitofthematerials

GAMAForTrading&Contracting

10

Beity Plant Extension Project No.: 1607-P1-b

(Fig2) 4 Thereisnopathforpassageofcablestoworkinthisareaandtherefore sourceofelectricitywillbeusedfrominsidethebuilding,knowingthatthe toolsusedonlythedrillingM/C&thecuttingM/Cwillbeused 5 Thenumbersoflaborswhichwillworkatetchareaitwillbespecifiedindaily Report&willnotbelessthan45workers/eacharea 6 Paintingofthepipeswiththetwolayersofprimercoatwillbeoutsidethe Site&thefinishlayerwillbeonside. 7 Thefabricationofpipesitswillbeinourwork shopyardoutsidetheworkingareaasshowing(Fig

(Fig3) 8 installationoffirefightingpipessupports(usingEquipmentDrillonlyand thereisnohotworks) 9 Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanually fromtheworkshoptotheplaceofinstallationandlargediameters(larger than2.5")transportitbyhandvehicletotheplacesofinstallation. 10 Liftingpipeswithlargediametersfromthegroundtotheinstallationplaces byBlancoAndliftingpipeswithsmalldiameterstotheplaceofinstallationby Handrollerspull 11 Afterfinishingoftheinstallationworkandinstallationofpipesthenwater pressuretestforpipeswillbedone 12 Afterthepressuretests,installationofsprinklers.
GAMAForTrading&Contracting 11

Beity Plant Extension Project No.: 1607-P1-b

AirConditioninginstallations:
Airhandlingunit'sinstallation&ductconnection
1Identifyingthelocutionoftheunitsaccordingtotheapproveddrawing 2Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig1.)Showingtheentrance&theexitofthematerials

(Fig1) 3Fabricatethebasesthattheunitswillbeinstalledonit 4Liftingtheunitfromoutsidethebuildingbycranes 5Makeopeningsinthesandwichpaneltopassagetheairduct Fromtheouttoinside 6Assemblytheductinoutsideareaintheworkshopandtransportitbyhand Vehicletothefeedpoints 7Connectionofpowercablefromtheunittothepowerdistributionpanel


GAMAForTrading&Contracting 12

Beity Plant Extension Project No.: 1607-P1-b

Proposed Scenario for work over the walk able ceiling areas
1Thefabricationofpipeswillbeinourworkshopyardoutsidetheworking Areaasshowing(Fig1)

(Fig1)
2Installationofsupportsforpipeswillbefixedbythreadedrodfromthebeamsandpurlins asshowingin(fig.2)

(Fig2)

GAMAForTrading&Contracting

13

Beity Plant Extension Project No.: 1607-P1-b


3Transferpipesfromtheworkshoptothearea(1)acrossthepathshowninattached drawing.

4 Liftingpipesmanuallybylaborsviathestairsandputitinthearea(1)

GAMAForTrading&Contracting 14

Beity Plant Extension Project No.: 1607-P1-b


5Transferepipesintothewalkableareabyworkersandputitinhangarsshowninthe abovefigure.

6Totalnumbersofworkersinthewalkableceilingareawillbe7workersatthesametime.

GAMAForTrading&Contracting

15

Beity Plant Extension Project No.: 1607-P1-b

Alternative Scenario for work over the walk able celling areas
After calculation of weights (workers & pipes) over the walk able ceiling it is found that we need another method of installation which is:
1Thefabricationofpipeswillbeinourworkshopyardoutsidetheworking Areaasshowing(Fig1)

(Fig1) 2Fabricationcantileversupportsshowingin(fig2)andfixeditinwallthatis Inwalkablesuspendedcelling


GAMAForTrading&Contracting 16

Beity Plant Extension Project No.: 1607-P1-b


3Transferpipesfromtheworkshoptothearea(1)&area(2)acrossthepathattachedin thefollowingfigure.

4Makeopeninginthewallbetweenthewalkablesuspendedceilingandthebesideroom Area(1)asshowninthefollowingfigure.

5Afterinstallthesupportsonthewallofthewalkablesuspendedceilingandworkwall openinginthesandwichpanelwillbepushthepipesthroughthesupportsasshowing. GAMAForTrading&Contracting 17

Beity Plant Extension Project No.: 1607-P1-b

6Totalnumbersofworkersinthewalkableceilingareawillbe4workersatthesame time.

GAMAForTrading&Contracting

18