Beity Plant Extension Project No.
: 1607-P1-b
ScenarioofsitesMechanicalWorks
Firefightingnetworkinstallations
Storagearea(B03)
1 Thecontractorwillaskedtheownerbeforestartinghisworkswith4daysto evacuatetheworkingareabetweentheracksandtheupperlevelofitin ordertobeabletowork 2 Thestorageareawillbedividedintothreepartsinthestoragearea. 3 Thecontractorwillstartinstallationofscaffoldingineachareafromthe groundtoupasshowninthe(fig1.)otherwiseovertheracksifaccepted.
Redarrows:Scaffolding Blackarrows:Labors&Materials
(Fig1)
GAMAForTrading&Contracting 1
Beity Plant Extension Project No.: 1607-P1-b 4 Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig2.)Showingtheentrance&theexitofthematerials&labors.
(Fig2) 5 Thelocutionofpowersupplypanelforeclectictoolsisshowing(fig3.) WhereonlythedrillingM/C&thecuttingM/Cwellbeused
(Fig3) 6Thenumberoflaborswhichwillworkatetchareaitwillbespecifiedindaily report&willnotbelessthan45workers/eacharea
GAMAForTrading&Contracting 2
Beity Plant Extension Project No.: 1607-P1-b 7 Paintingofthepipeswiththetwolayersofprimercoatwillbeoutsidethe site&thefinishlayerwillbeinsite. 8Thefabricationofpipesitswillbeinourworkshopyardoutsidetheworking areaasshowing(Fig4)
(Fig4) 9installationoffirefightingpipessupports(usingEquipmentDrillonlyand thereisnohotworks) 10Usingfixedscaffoldingabovetheracksortendenciesfloorsandmoving scaffoldingatflatfloorandcorridorstoInstallationofsupportsandpipes 11Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanually fromtheworkshoptotheplaceofinstallationandlargediameters(largerthan 2.5")transportitbyhandvehicletotheplacesofinstallation. 12Liftingpipeswithlargediametersfromthegroundtotheinstallationplaces byBlancoandliftingpipeswithsmalldiameterstotheplaceofinstallationby Handrollerspull 13Afterfinishingoftheinstallationworkandinstallationofpipesthenwater pressuretestforpipeswillbedone 14Afterthepressuretests,installationofsprinklers.
GAMAForTrading&Contracting 3
Beity Plant Extension Project No.: 1607-P1-b
AirConditioninginstallations:
1 Stepsforinstallationoffans(rooftopfans)
1 Identifyingtheplacesofthefansaccordingtotheapproveddrawing 2Thecontractorwillstartinstallationofscaffoldingineachareafromthe Groundtoupasshowninthe(fig1.)otherwiseovertheracksifaccepted
(Fig1) 3Thelocationofpowersupplypanelforeclectictoolsisshowing(fig2) WhereonlythedrillingM/C&thecuttingM/Cwellbeused
GAMAForTrading&Contracting
Beity Plant Extension Project No.: 1607-P1-b
(Fig2) 4Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig3)showingtheentrance&theexitofthematerials
(Fig3) 5Makethenecessarystrengtheningintheinternalceilingforthesteel structureaccordingtoapproveddrawings.
GAMAForTrading&Contracting 5
Beity Plant Extension Project No.: 1607-P1-b
6Installtheframewherethefanswillbeinstalledon 7Makeopeningsinthecorditesheetmetalwhichwillbefrominsidethe building 8Installation&fixingthecurbfromabovethesteelstructure 9Liftingthefansbycranes&fixingitabovetothecurb 10Supplying&installationelectriccablesfromthefanstotheelectrical board
6
GAMAForTrading&Contracting
Beity Plant Extension Project No.: 1607-P1-b
Firefightingnetworkinstallations
Processingarea(B03groundfloor)
1 Thecontractorwillaskedtheownerbeforestartinghisworkswith4daysto evacuatetheworkingareabetweentheracksandtheupperlevelofitinorder tobeabletowork 2 Thecontractorwillstartinstallationofscaffoldingineachareafromthe groundtoupasshowninthe(fig1.)
Fig1
GAMAForTrading&Contracting 7
Beity Plant Extension Project No.: 1607-P1-b 3 Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig2.)Showingtheentrance&theexitofthematerials
(Fig2) 4 Thelocationofpowersupplypanelforeclectictools(fig3.)
Fig3
GAMAForTrading&Contracting 8
Beity Plant Extension Project No.: 1607-P1-b 5Thenumberoflaborswhichwillworkatetchareaitwillbespecifiedindaily report&willnotbelessthan45workers/eacharea 6Thefabricationofpipesitswillbeinoutsideattheworkshoparea(fig4.)
(Fig4) 7Installationoffirefightingpipessupports(usingEquipmentDrillonlyandthere isnohotworks) 8UsingfixedscaffoldinginFlooringleaningandmovingscaffoldingatflatfloor andcorridorstoInstallationofsupportsandpipes 9InstallandfixcantileversupportsinColumnsofsteelstructureformainloops andthreadedrodsforbranchespipesbyfixeditinpearlinessthatinupperfloor passagethroughthesandwichpanel 10Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanuallyfrom theworkshoptotheplaceofinstallationandlargediameters(largerthan2.5") transportitbyhandvehicletotheplacesofinstallation. 11Liftingpipeswithlargediametersfromthegroundtotheinstallationplacesby BlancoandliftingpipeswithsmalldiameterstotheplaceofinstallationbyHand rollerspull 12Afterfinishingoftheinstallationworkandinstallationofpipesthenwater pressuretestforpipeswillbedone 13Afterthepressuretests,installationofsprinklers.
GAMAForTrading&Contracting 9
Beity Plant Extension Project No.: 1607-P1-b
Firefightingnetworkinstallations
Juicepreparationarea(B02)
1 Thecontractorwillaskedtheownerbeforestartinghisworkswith48hours toevacuatetheworkingareabetweentheracksandtheupperlevelofitin ordertobeabletowork 2 Thecontractorwillstartinstallationofscaffoldinginetchareafromthe groundtoupasshowninthe(fig1.)Someareaswillbefixedscaffolding(above thetanksandM/C)andotherswillbemovingscaffolding
(fig1) 3 Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig2.)Showingtheentrance&theexitofthematerials
GAMAForTrading&Contracting
10
Beity Plant Extension Project No.: 1607-P1-b
(Fig2) 4 Thereisnopathforpassageofcablestoworkinthisareaandtherefore sourceofelectricitywillbeusedfrominsidethebuilding,knowingthatthe toolsusedonlythedrillingM/C&thecuttingM/Cwillbeused 5 Thenumbersoflaborswhichwillworkatetchareaitwillbespecifiedindaily Report&willnotbelessthan45workers/eacharea 6 Paintingofthepipeswiththetwolayersofprimercoatwillbeoutsidethe Site&thefinishlayerwillbeonside. 7 Thefabricationofpipesitswillbeinourwork shopyardoutsidetheworkingareaasshowing(Fig
(Fig3) 8 installationoffirefightingpipessupports(usingEquipmentDrillonlyand thereisnohotworks) 9 Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanually fromtheworkshoptotheplaceofinstallationandlargediameters(larger than2.5")transportitbyhandvehicletotheplacesofinstallation. 10 Liftingpipeswithlargediametersfromthegroundtotheinstallationplaces byBlancoAndliftingpipeswithsmalldiameterstotheplaceofinstallationby Handrollerspull 11 Afterfinishingoftheinstallationworkandinstallationofpipesthenwater pressuretestforpipeswillbedone 12 Afterthepressuretests,installationofsprinklers.
GAMAForTrading&Contracting 11
Beity Plant Extension Project No.: 1607-P1-b
AirConditioninginstallations:
Airhandlingunit'sinstallation&ductconnection
1Identifyingthelocutionoftheunitsaccordingtotheapproveddrawing 2Theaccesspassagetotheworkingareaisdescribedbelowasshownin (Fig1.)Showingtheentrance&theexitofthematerials
(Fig1) 3Fabricatethebasesthattheunitswillbeinstalledonit 4Liftingtheunitfromoutsidethebuildingbycranes 5Makeopeningsinthesandwichpaneltopassagetheairduct Fromtheouttoinside 6Assemblytheductinoutsideareaintheworkshopandtransportitbyhand Vehicletothefeedpoints 7Connectionofpowercablefromtheunittothepowerdistributionpanel
GAMAForTrading&Contracting 12
Beity Plant Extension Project No.: 1607-P1-b
Proposed Scenario for work over the walk able ceiling areas
1Thefabricationofpipeswillbeinourworkshopyardoutsidetheworking Areaasshowing(Fig1)
(Fig1)
2Installationofsupportsforpipeswillbefixedbythreadedrodfromthebeamsandpurlins asshowingin(fig.2)
(Fig2)
GAMAForTrading&Contracting
13
Beity Plant Extension Project No.: 1607-P1-b
3Transferpipesfromtheworkshoptothearea(1)acrossthepathshowninattached drawing.
4 Liftingpipesmanuallybylaborsviathestairsandputitinthearea(1)
GAMAForTrading&Contracting 14
Beity Plant Extension Project No.: 1607-P1-b
5Transferepipesintothewalkableareabyworkersandputitinhangarsshowninthe abovefigure.
6Totalnumbersofworkersinthewalkableceilingareawillbe7workersatthesametime.
GAMAForTrading&Contracting
15
Beity Plant Extension Project No.: 1607-P1-b
Alternative Scenario for work over the walk able celling areas
After calculation of weights (workers & pipes) over the walk able ceiling it is found that we need another method of installation which is:
1Thefabricationofpipeswillbeinourworkshopyardoutsidetheworking Areaasshowing(Fig1)
(Fig1) 2Fabricationcantileversupportsshowingin(fig2)andfixeditinwallthatis Inwalkablesuspendedcelling
GAMAForTrading&Contracting 16
Beity Plant Extension Project No.: 1607-P1-b
3Transferpipesfromtheworkshoptothearea(1)&area(2)acrossthepathattachedin thefollowingfigure.
4Makeopeninginthewallbetweenthewalkablesuspendedceilingandthebesideroom Area(1)asshowninthefollowingfigure.
5Afterinstallthesupportsonthewallofthewalkablesuspendedceilingandworkwall openinginthesandwichpanelwillbepushthepipesthroughthesupportsasshowing. GAMAForTrading&Contracting 17
Beity Plant Extension Project No.: 1607-P1-b
6Totalnumbersofworkersinthewalkableceilingareawillbe4workersatthesame time.
GAMAForTrading&Contracting
18