WBS Template
Information Technology - North Carolina Department
Project Assistant
Instructions and of Transportation
Project Information
Work Breakdown Structure (WBS)
Instructions:
This template presents a standard Work Breakdown Structure (WBS) design for planning and monitoring IT
projects at NCDOT. It provides a framework for developing a plan/schedule for any project.
To create a schedule in the selected project management tool, refer to the WBS template and perform the following
steps:
1. Set up the Project Initiation, Planning, Execution, Controlling and Closing Phases
as the 2nd Level of the WBS.
Note: the Project Definition is the 1st Level of the WBS.
2. Review the 3rd Level WBS elements listed under each project phase and:
a. Delete those not relevant to your project.
b. Add new elements (add appropriate number of "Other" boxes and rename)
3. Incorporate WBS into project management tool.
You must have "Tools/Options/View/Comment Indicator Only" checked in order to see on-line help.
PROJECT INFORMATION
Project Description
Project Definition
IT Project Manager
Template: Work Breakdown Structure [Rev 1.1 07/16/2004]
1 Print Date: 12/23/2009
Information Technology - WBS Template North Carolina Department
Project System of Transportation
SAP PROJECT OTHER PROJECT
SYSTEM TOOLS
NCDOT
Level 1 WBS Project Name
IT Project
Level 2 WBS Initiation Planning Execution Controlling Closing Phase
Phase Phase Phase Phase Phase
Project Project Project Project Project
Level 3 WBS Task
Evaluation Management Management Management Management
Evaluation &
Other Requirements Other Other
Selection
Other Other Design Other Other
Other Other Build Other Other
Other Other Test Other Other
Other Other Training Other Other
Implementation
Stabilization
Other
Template: Work Breakdown Structure [Rev 1.1 07/16/2004]