Petropars
Ltd
FOSTER WHEELER
ENERGY LIMITED
NATIONAL IRANIAN OIL COMPANY
SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6, 7 & 8
ENGINEERING SERVICES
N.I.O.C.
DOCUMENT TITLE
56 ONSHORE PIPELINE
PHASE
AREA
SPY
BARRED TEE DATA SHEET
DOCUMENT No
TRAIN/
DIS
DOC
UNIT
0000
PN
DT
SEQ
REV
005
B1
Page 1 of 3
NATIONAL IRANIAN OIL COMPANY
SOUTH PARS GAS FIELD DEVELOPMENT
PHASES 6, 7 & 8
ENGINEERING SERVICES
Document Title
56 ONSHORE GAS PIPELINE
BARRED TEE DATASHEET
SPY-3-0000-PN-DT-005
13.06.01
B1
Issued for Company Approval
MRW
AB
AB
31.05.01
B0
Issued for Company Comment
MRW
AB
AB
03-05-01
01
Issued for Comment
AUTHOR
CHECKE
D
FW
PPL
QA
APPROVED
DOCUMENT CLASS
DATE
ISSUED
REV
DSN NUMBER
56 Pipeline Barred Tee Data Sheet
G:\F.W PIPELINE\Pipelines\SPY-3-0000-PN-DT-005-B1.doc
PURPOSE OF ISSUE
4306
Petropars
Ltd
FOSTER WHEELER
ENERGY LIMITED
NATIONAL IRANIAN OIL COMPANY
SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6, 7 & 8
ENGINEERING SERVICES
N.I.O.C.
DOCUMENT TITLE
56 ONSHORE PIPELINE
PHASE
AREA
SPY
BARRED TEE DATA SHEET
DOCUMENT No
TRAIN/
DIS
DOC
UNIT
0000
PN
DT
SEQ
REV
005
B1
Pipeline Reference
56 Onshore Pipeline
Sour Service Requirement
NACE MR0175
Design Life
25 Years
Design Pressure
100 barg
Test Pressure
95% of SMYS
Design Temperature
85oC
Post Weld Heat Treatment
SPY-Y-0000-TY-SP-008
Pipeline Design Code
ASME B31.8
Pipeline Dimensions
Class 1
Class 2
1422mm (56)
1422mm (56)
22.2mm
27.0mm
1377.6mm
1368mm
External Diameter
Wall Thickness
Internal Diameter
Fluids to be conveyed
Dry Sour Gas
Pipeline Material Grade
API 5L Grade X 65
Pipeline Material Specification
SPY-Y-0000-TY-SP-017
Corrosion Allowance
Nil
Fitting Description
56 x 56 x56 Weld End, Barred Tee.
Tee Material Grade
ASTM A694 Grade F65 (or equivalent).
Specification
Branch Dimensions
ASME B 16.9
Class 1
1422mm (56)
22.2mm
1377.6mm
External Diameter
Wall Thickness
Internal Diameter
Class 2
1422mm (56)
27.0mm
1368mm
Branch Connection Material Grade
API 5L Grade X 65
Welding Procedure Qualification Ring
Required
Pressure Design Calculations
Required
Fabrication Drawing
External Coating
Project Coating Specification
Required
Factory applied Multi-Compound PE
SPY-Y-0000-TY-SP-006
Internal Lining
Nil
Inspection
Special Requirements
SPY-Y-0000-TY-SP-008
1.0m Weld End pup pieces to all Outlets
Bore to match pipeline diameter
Bar Fabrication
See attached Sketch
G:\F.W PIPELINE\Pipelines\SPY-3-0000-PN-DT-005-B1.doc
Page 2 of 3
Petropars
Ltd
FOSTER WHEELER
ENERGY LIMITED
NATIONAL IRANIAN OIL COMPANY
SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6, 7 & 8
ENGINEERING SERVICES
N.I.O.C.
DOCUMENT TITLE
56 ONSHORE PIPELINE
PHASE
AREA
SPY
BARRED TEE DATA SHEET
DOCUMENT No
TRAIN/
DIS
DOC
UNIT
0000
PN
DT
SEQ
REV
005
B1
Page 3 of 3
Sketch for Guide Bar Design
Notes
1. All branch diameter wall thickness changes shall be made with tapered transition pieces of 1:5
minimum slope.
2. Barred Tees required at greater than 50% of pigged line size.
3. Weld procedure required for bars and tee.
4. Bar dimensions 50mmx9mm bars 36 100mmx12mm.
5. Fabrication and Inspection requirements included in SPY-Y-0000-TY-SP-008
6. Manufacturer to transport free issue pup pieces from pipeline supplier.
G:\F.W PIPELINE\Pipelines\SPY-3-0000-PN-DT-005-B1.doc