75% found this document useful (4 votes)
2K views3 pages

56" Onshore Pipeline Datasheet

This document provides specifications for a 56" barred tee fitting for a sour gas pipeline in the South Pars Gas Field in Iran. It specifies that the tee will connect three 56" pipelines and be made of Grade F65 steel. It also provides details on design pressure, coating, welding requirements and inspection standards to ensure integrity for the 25-year design life in sour gas service. Guide bars will be installed to support the tee and ensure smooth internal flow transition.

Uploaded by

Biginch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
2K views3 pages

56" Onshore Pipeline Datasheet

This document provides specifications for a 56" barred tee fitting for a sour gas pipeline in the South Pars Gas Field in Iran. It specifies that the tee will connect three 56" pipelines and be made of Grade F65 steel. It also provides details on design pressure, coating, welding requirements and inspection standards to ensure integrity for the 25-year design life in sour gas service. Guide bars will be installed to support the tee and ensure smooth internal flow transition.

Uploaded by

Biginch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Document Cover
  • Pipeline Specifications
  • Bar Design Sketch

Petropars

Ltd

FOSTER WHEELER
ENERGY LIMITED

NATIONAL IRANIAN OIL COMPANY


SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6, 7 & 8
ENGINEERING SERVICES
N.I.O.C.

DOCUMENT TITLE
56 ONSHORE PIPELINE

PHASE

AREA

SPY

BARRED TEE DATA SHEET

DOCUMENT No
TRAIN/
DIS
DOC
UNIT
0000

PN

DT

SEQ

REV

005

B1

Page 1 of 3

NATIONAL IRANIAN OIL COMPANY

SOUTH PARS GAS FIELD DEVELOPMENT


PHASES 6, 7 & 8
ENGINEERING SERVICES

Document Title

56 ONSHORE GAS PIPELINE


BARRED TEE DATASHEET

SPY-3-0000-PN-DT-005

13.06.01

B1

Issued for Company Approval

MRW

AB

AB

31.05.01

B0

Issued for Company Comment

MRW

AB

AB

03-05-01

01

Issued for Comment

AUTHOR

CHECKE
D

FW

PPL

QA
APPROVED

DOCUMENT CLASS

DATE
ISSUED

REV

DSN NUMBER

56 Pipeline Barred Tee Data Sheet


G:\F.W PIPELINE\Pipelines\SPY-3-0000-PN-DT-005-B1.doc

PURPOSE OF ISSUE
4306


Petropars
Ltd

FOSTER WHEELER
ENERGY LIMITED

NATIONAL IRANIAN OIL COMPANY


SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6, 7 & 8
ENGINEERING SERVICES
N.I.O.C.

DOCUMENT TITLE
56 ONSHORE PIPELINE

PHASE

AREA

SPY

BARRED TEE DATA SHEET

DOCUMENT No
TRAIN/
DIS
DOC
UNIT
0000

PN

DT

SEQ

REV

005

B1

Pipeline Reference

56 Onshore Pipeline

Sour Service Requirement

NACE MR0175

Design Life

25 Years

Design Pressure

100 barg

Test Pressure

95% of SMYS

Design Temperature

85oC

Post Weld Heat Treatment

SPY-Y-0000-TY-SP-008

Pipeline Design Code

ASME B31.8

Pipeline Dimensions

Class 1

Class 2

1422mm (56)

1422mm (56)

22.2mm

27.0mm

1377.6mm

1368mm

External Diameter
Wall Thickness
Internal Diameter
Fluids to be conveyed

Dry Sour Gas

Pipeline Material Grade

API 5L Grade X 65

Pipeline Material Specification

SPY-Y-0000-TY-SP-017

Corrosion Allowance

Nil

Fitting Description

56 x 56 x56 Weld End, Barred Tee.

Tee Material Grade

ASTM A694 Grade F65 (or equivalent).

Specification
Branch Dimensions

ASME B 16.9
Class 1
1422mm (56)
22.2mm
1377.6mm

External Diameter
Wall Thickness
Internal Diameter

Class 2
1422mm (56)
27.0mm
1368mm

Branch Connection Material Grade

API 5L Grade X 65

Welding Procedure Qualification Ring

Required

Pressure Design Calculations

Required

Fabrication Drawing
External Coating
Project Coating Specification

Required
Factory applied Multi-Compound PE
SPY-Y-0000-TY-SP-006

Internal Lining

Nil

Inspection
Special Requirements

SPY-Y-0000-TY-SP-008
1.0m Weld End pup pieces to all Outlets
Bore to match pipeline diameter

Bar Fabrication

See attached Sketch

G:\F.W PIPELINE\Pipelines\SPY-3-0000-PN-DT-005-B1.doc

Page 2 of 3


Petropars
Ltd

FOSTER WHEELER
ENERGY LIMITED

NATIONAL IRANIAN OIL COMPANY


SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6, 7 & 8
ENGINEERING SERVICES
N.I.O.C.

DOCUMENT TITLE
56 ONSHORE PIPELINE

PHASE

AREA

SPY

BARRED TEE DATA SHEET

DOCUMENT No
TRAIN/
DIS
DOC
UNIT
0000

PN

DT

SEQ

REV

005

B1

Page 3 of 3

Sketch for Guide Bar Design

Notes
1. All branch diameter wall thickness changes shall be made with tapered transition pieces of 1:5
minimum slope.
2. Barred Tees required at greater than 50% of pigged line size.
3. Weld procedure required for bars and tee.
4. Bar dimensions 50mmx9mm bars 36 100mmx12mm.
5. Fabrication and Inspection requirements included in SPY-Y-0000-TY-SP-008
6. Manufacturer to transport free issue pup pieces from pipeline supplier.

G:\F.W PIPELINE\Pipelines\SPY-3-0000-PN-DT-005-B1.doc

Petropars 
Ltd 
Α 
FOSTER WHEELER 
ENERGY LIMITED 
NATIONAL IRANIAN OIL COMPANY 
SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6,
Petropars 
Ltd 
Α 
FOSTER WHEELER 
ENERGY LIMITED 
NATIONAL IRANIAN OIL COMPANY 
SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6,
Petropars 
Ltd 
Α 
FOSTER WHEELER 
ENERGY LIMITED 
NATIONAL IRANIAN OIL COMPANY 
SOUTH PARS GAS FIELD DEVELOPMENT PHASES 6,

You might also like