Job Safety Analysis Work Sheet Electrician: Activity Hazards Risk Control Measures Responsible

This document outlines a job safety analysis for electricians. It identifies potential hazards for various activities including wiring repairs, trenching, general labor, clean up, using power tools, working outside, and using hand tools. For each activity, it lists the associated hazards and the risk control measures that should be taken. Responsibility for following the risk control measures lies with the contractor performing the work. At the end, it recommends contractors complete a safe working agreement and requires the contractor's signature, acknowledging they will comply with the safety guidelines.

Uploaded by

Deny Safari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
726 views2 pages

Job Safety Analysis Work Sheet Electrician: Activity Hazards Risk Control Measures Responsible

This document outlines a job safety analysis for electricians. It identifies potential hazards for various activities including wiring repairs, trenching, general labor, clean up, using power tools, working outside, and using hand tools. For each activity, it lists the associated hazards and the risk control measures that should be taken. Responsibility for following the risk control measures lies with the contractor performing the work. At the end, it recommends contractors complete a safe working agreement and requires the contractor's signature, acknowledging they will comply with the safety guidelines.

Uploaded by

Deny Safari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

JOB SAFETY ANALYSIS WORK SHEET

ELECTRICIAN
ACTIVITY

HAZARDS

RISK CONTROL
MEASURES

RESPONSIBLE

Wiring repairs

Electrocution

Ensure complete lock out


tag out isolation before
commencing job. Provide
sign at isolation point to
advise of lock out.

Contractor

Trenching

Back injuries

Warm up prior to starting.


Do not lift objects over 16kg
per person. Use trolley to
move heavy objects. Wear
appropriate Personal
Protective Equipment.

Contractor

Trenching

Cave in

Ensure trench is constructed


in accordance with
Regulations and that
appropriate shoring is in
place where required. Have
at least one person on
standby when working in
trench.

Contractor

General/Clean up

Cuts / scratches

Wear appropriate personal


protective clothing

Contractor

General Labour

Working at height.
Electrical hazards

Do not use ladder over 2m


high. Use cherry picker or
scaffold. Establish perimeter
around area that is no-go
area. Ensure all tools are
appropriately guarded and
electrical appliances are
protected by means of a
residual current device.
Ensure all extension leads
are in a safe condition with
plugs and connections.
Ensure there are no
electrical cables in the
vicinity of area.

Contractor

Clean up

Insect bites / Broken


glass / syringes / spiders

Wear appropriate foot and


hand protection. Dispose of
material in an appropriate
manner.

Contractor

Using power tools

Noise /Vibration /Dust /


Electrical hazards.

Wear appropriate personal


protective equipment.
Ensure all tools are
appropriately guarded and
electrical appliances are
protected by means of a
residual current device.
Ensure all extension leads
are in a safe condition with
plugs and connections.

Contractor


ACTIVITY

HAZARDS

RISK CONTROL
MEASURES

RESPONSIBLE

Working outside

Sunburn

Sunhat / glasses /
sunscreen / protective
clothing.

Contractor

Using hand tools

Cuts / tears sprains etc.

Use tools in a manner that


will not cause jamming or
seizing. Wear appropriate
PPE.

Contractor

NOTE: It is recommended that every Contractor complete and sign the Solutions in
Engineering Contractors Safe Working Agreement
I have read the JSA Work Sheet and agree to comply with the guidelines as set out in the above
mentioned documentation.

Contractor:..

Signature:.. Date:...