2015
USER MANUAL
Processing of Letter of Credit in SAP
SAP-MAS
Byco Petroleum Pakistan Limited.
6/15/2015
Table of Contents
1 Processing of Letter of Credit in SAP SD .............................................................................. 3
1.1 Purpose: ......................................................................................................................... 3
1.2 Advantage: ..................................................................................................................... 3
1.3 Pre-Requisites: ............................................................................................................... 4
1.4 Trigger: ........................................................................................................................... 4
1.5 Process Flow: ................................................................................................................. 5
1.6 Training User Manual ..................................................................................................... 6
1.6.1 Creation of LC Document in SAP: ........................................................................... 6
1.6.2 Making the LC Document Available to be used for Sales ..................................... 12
1.6.3 Enhancement in the LC ......................................................................................... 14
Page 2 of 17
1 Processing of Letter of Credit in SAP SD
1.1 Purpose:
Financial Document of LC should be created in SAP.(No financial Impact after creation)
Document of LC should be integrated with Separate Sales Document type.
Through this integration Business Should be able to trace the Sales Orders which will be
created against that LC Document.
Disengagement from Manual Work for LC.
1.2 Advantage:
Reporting of the business process will be streamlined in a way that anybody can have
the idea how many Sales orders based on a LC are being created in a specific period of
time.
Better controls with the help of LC Financial document based on a LC Amount.
- Shipments will not be allowed in case the Sales Order value exceeds the LC Value.
- Shipments will not be allowed in case LC Document VALIDITY DATE Expires.
- Shipments will not be allowed in case PGI Date falls above Latest Date of Shipment.
Page 3 of 17
1.3 Pre-Requisites:
Assignment of Payment Guarantee Procedure in the Billing Tab of Customer Master to
put the Customer on LC.
Creation of LC Financial Document.
Creation of Sales Order with the document type ZLC in ORB1 / YLCF in PMB.
1.4 Trigger:
Under Incompletion Log at the time of saving the Sales Order, it will ask the user to
assign the LC Document under Billing Tab of Sales Header Data.
Page 4 of 17
1.5 Process Flow:
SAP LC Based Sales Order Processing (Order to Cash) ORC1
Delivery Delivery
Challan
Shipment & Oil
Token
Accounts
Outbound Outbound Post Goods Proof of
delivery # - at Delivery # at Issued to Delivery(POD).
Weight Bridge GANTRY Customer after After Customer
Weighbridge Weighbridge Acknowledgment
Refinery Operations Weight Bridge
Material
Document
No
Customer Services
If Sales Order Sales Order
Sales Order
Sales Order Amount Exceeds YES
Blocked
Release by
LC Amount Authorized Person
Assignment
of LC # in the
Sales Order
Finance
Recording of LC
Start Invoice End
in the SAP
Accounting
Document
Page 5 of 17
1.6 Training User Manual
1.6.1 Creation of LC Document in SAP:
T-CODE: VX11N / VX12N / VX13N
Enter:
Financial Document Category
Financial Document Type
Company Code
Page 6 of 17
Enter:
Customer #
Ship to Party #
Bank Country, Bank Key & External LC #
Page 7 of 17
Enter in Delivery Dates TAB.
Opening Date,
Latest Shipping Date
Validity End Date
Page 8 of 17
Under Document Tab
Enter:
Original Document & Copies
Page 9 of 17
Press Save Button & Verify the Customer Address
Page 10 of 17
SAVE the document Again.
Document will set to status A (Document has been created)
Page 11 of 17
1.6.2 Making the LC Document Available to be used for Sales
T-CODE: VX12N
After creating the LC Document in SAP, user should set a status D which means that Now LC Document
is available to be used for SALES Purposes.
Now LC Document is ready to be assigned in Sales Order.
Page 12 of 17
After making the LC Document available for Sales, the LC Amount field Grey out (not changeable).
Page 13 of 17
1.6.3 Enhancement in the LC
T-CODE: VX12N
Goto STATUS Tab and Press Status E & Select Amendment
Page 14 of 17
After putting up the status E.
Page 15 of 17
Goto General TAB & Change the LC Amount. The field is open & changeable.
Page 16 of 17
Goto Status Tab Press the Status D
Save the document.
Page 17 of 17