Automatic batch determination in...
KRIS HAIT 191 posts since Oct 22, 2010
Automatic batch determination in process order Oct 22, 2010 6:32 AM
Hi,
I have done batch management both for header and component level and batch determination have
beed activated with search procedure. During Goods receipt, for component against PO (in MIGO) and
for FG process order release batches are automatically created. But during release of process order,
release is rejected showing the message "Please enter the batch for the component". When I am trying to
select the batch for the component it shows "batch determination for component number without selection
data"....."No search strategy could be found"..........."Dp you want to create selection criteria for the batch?" and
lastly....'selection criteria transferred from material classification (of finished goods)". So wher is the problem for
component automatic batch determination? I have used standard search procedure...C00001 and mentioned in
process order dependent parameter" Please help.
Sundaresan Velayudam 2,185 posts since Jan 19, 2008
Re: Automatic batch determination in process order Oct 22, 2010 6:37 AM
I feel you have maintained batch search strategy for Goods movement in MBC1.
IN order to get in production order
Create a Batch search strategy for production order in COB1 and maintain sort rule in CU70
Hrishi J 604 posts since Sep 10, 2010
Re: Automatic batch determination in process order Oct 22, 2010 7:47 AM
Hi,
In Addition to the expert, please check whether you allocates the IM search procedure and activates the
check.t-codeOMCG
Here assign the search procedure to 261 movement and tick mark batch managament
Check and revert.
Thanks,
Hrishi
Generated by Jive on 2016-05-25+02:00
1
Automatic batch determination in...
KRIS HAIT 191 posts since Oct 22, 2010
Re: Automatic batch determination in process order Oct 26, 2010 6:17 AM
Hi,
Thanks for your suggestion.
I need auto batch determination of the component material during process order release.
I have done:-
1. T code: MBC1:- Batch search strategy ME01 for the component mat with movement type 261.
2. T Code: CU70:-Created new sort sequence - BATCH_01 underwhich I have inserted the characteristic
colour and carbon percentage in assending order. These characteristicsare maintained in mat. master of
component also.
3. T code: COR4:-maintain Search procedure CO0001in order type dependent parameter with check bat
active.
4. T code: COB1:- under batch strategy ZPI1 maintain order type, component no., plant, material as
component no. validity period, batch split-999, tick in dialogue batch determination, selection criteria- put the
characteristic for the component mainatained in mat master also. and sort rule- BATCH_01.
What I have missed? Please help.
Thanks
Kris
KRIS HAIT 191 posts since Oct 22, 2010
Re: Automatic batch determination in process order Oct 26, 2010 6:18 AM
Hi,
Thanks for your suggestion.
I need auto batch determination of the component material during process order release.
I have done:-
1. T code: MBC1:- Batch search strategy ME01 for the component mat with movement type 261.
2. T Code: CU70:-Created new sort sequence - BATCH_01 underwhich I have inserted the characteristic
colour and carbon percentage in assending order. These characteristicsare maintained in mat. master of
component also.
3. T code: COR4:-maintain Search procedure CO0001in order type dependent parameter with check bat
active.
Generated by Jive on 2016-05-25+02:00
2
Automatic batch determination in...
4. T code: COB1:- under batch strategy ZPI1 maintain order type, component no., plant, material as
component no. validity period, batch split-999, tick in dialogue batch determination, selection criteria- put the
characteristic for the component mainatained in mat master also. and sort rule- BATCH_01.
I have done the IM....setting also.
What I have missed? Please help.
Thanks
Kris
Dhaval Choksi 2,765 posts since Jan 19, 2008
Re: Automatic batch determination in process order Oct 26, 2010 6:29 AM
Dear Kris,
1) Check in T.Code OPLG, whether you have maintain ZPI1 in search procedure CO0001.If not maintain it.
2) Also Check in material master of all the bom components.Batch Entry file should be maintain as 3.
3) Check the correctness of Batch Class assignment in all the bom components.
4) Characteristic(which you have maintain in CU70) value should be there in all the concern batches of bom
components.
Regards,
Dhaval
R Brahmankar
Re: Automatic batch determination in process order Oct 26, 2010 6:43 PM
Dear,
Please refer this link for details,
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c09b7216-65da-2b10-bdb5-870cf9916350?
quicklink=index&overridelayout=true
Regards,
R.Brahmankar
Kiran Kumar 2,307 posts since Jul 29, 2008
Re: Automatic batch determination in process order Oct 26, 2010 6:48 AM
Dear Apart from above inputs check OMCG and CORC for batch serach procedure allocation and check
activation .
Generated by Jive on 2016-05-25+02:00
3
Automatic batch determination in...
Check and Revert.
Cheers
KK
Kiran Kumar 2,307 posts since Jul 29, 2008
Re: Automatic batch determination in process order Oct 22, 2010 8:23 AM
Dear Check below threads for more info on Batch Determination
[Batch Determination issue|Batch Determination issue -reg;
[Batch Determination in Process Industry (PP-PI) |Batch Determination in Process Industry (PP-PI);
Cheers
KK
KRIS HAIT 191 posts since Oct 22, 2010
Re: Automatic batch determination in process order Oct 26, 2010 6:17 AM
Hi,
Thanks for your suggestion.
I need auto batch determination of the component material during process order release.
I have done:-
1. T code: MBC1:- Batch search strategy ME01 for the component mat with movement type 261.
2. T Code: CU70:-Created new sort sequence - BATCH_01 underwhich I have inserted the characteristic
colour and carbon percentage in assending order. These characteristicsare maintained in mat. master of
component also.
3. T code: COR4:-maintain Search procedure CO0001in order type dependent parameter with check bat
active.
4. T code: COB1:- under batch strategy ZPI1 maintain order type, component no., plant, material as
component no. validity period, batch split-999, tick in dialogue batch determination, selection criteria- put the
characteristic for the component mainatained in mat master also. and sort rule- BATCH_01.
What I have missed? Please help.
Thanks
Kris
Generated by Jive on 2016-05-25+02:00
4
Automatic batch determination in...
Sundaresan Velayudam 2,185 posts since Jan 19, 2008
Re: Automatic batch determination in process order Oct 27, 2010 6:36 AM
T code: COB1:- under batch strategy ZPI1 maintain order type, component no., plant, material as
component no. validity period, batch split-999, tick in dialogue batch determination, selection criteria-
put the characteristic for the component mainatained in mat master also. and sort rule- BATCH_01.
What I have missed? Please help.
Dear KRIS,
Please check in order type - are you maintained batch search procedure. and tick the check
Are you maintained in Material master for that component - Batch entry- Automatic batch determination of the
order release
and Check are you maintained the tick in OPJ2 for that order type,
And check it is coming or not
IF still comes
Go to component view of Order
and click the batch determination and find for what strategy the condition is missing
Maintain the Condition in COB1 for the material and order type and maintain sort rule,
KRIS HAIT 191 posts since Oct 22, 2010
Re: Automatic batch determination in process order Oct 28, 2010 6:10 AM
Dear All,
Lastly the problem is solved. I am able to do batch determination at release of process order . Thanks for your
help.
Jiaul Haque 2,705 posts since Oct 29, 2007
Re: Automatic batch determination in process order Oct 26, 2010 9:46 PM
Dear
Generated by Jive on 2016-05-25+02:00
5
Automatic batch determination in...
Please check the folloing set up for automatic batch determination :
It is required lot of set up both in production order parameters and Batch Managemnet .I am providing you a
summery of it .
Configuration Required for your above issue are as follows :
1.Activated Batch Management in the Material Master-MRP2 view and Work Scheduling view of the FG
2.check material master MM02, tab MRP2 and set field "Batch Entry" to value 3 here
4.You maintain a Search Procedure in OPL8 - Order Type Dependent parameters .Before that you should have
Batch serach strategy :The sequence of steps are as follows -
Create Condition Tables
Create Access Sequences
Create Strategy Types
Batch Search procedure definition
Batch Search procedure allocation and check activation
Define Selection classes
Define sort rules
Maintain Batch Allocation Strategy Number Ranges
All the above are available in the Path - SPRO --->Logistics-General ---> Batch Management ---> Batch
Determination and Batch Check
5.Maintain the setting in T.code OPKP (production scheduling profile). Select automatic batch creation on order
creation.
6.If u want to execute the batch determination for components in the component overview of production order ,
then u have to create batch search strategy at COB1
7.If u want to execute during order confirmation u have to create batch search strategy at MBC1.
Regards
JH
Generated by Jive on 2016-05-25+02:00
6