100% found this document useful (1 vote)
255 views3 pages

Attachment 23 Criticality Assessment v3

This document contains a criticality assessment for an unnamed project. Section 1 identifies the assessment team members and their roles. Section 2 describes the system and scopes the assessment. Section 3 evaluates direct and indirect subcomponents for their effects on product, process, safety, and criticality. Section 4 defines calibration requirements for critical instruments. Section 5 approves the assessment with signatures.

Uploaded by

bo.ratchadaporn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
255 views3 pages

Attachment 23 Criticality Assessment v3

This document contains a criticality assessment for an unnamed project. Section 1 identifies the assessment team members and their roles. Section 2 describes the system and scopes the assessment. Section 3 evaluates direct and indirect subcomponents for their effects on product, process, safety, and criticality. Section 4 defines calibration requirements for critical instruments. Section 5 approves the assessment with signatures.

Uploaded by

bo.ratchadaporn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Attachment 23

Criticality Assessment

PROJECT NAME PROJECT REFERENCE NUMBER:

SYSTEM/EQUIPMENT DESCRIPTION:

SECTION 1: IDENTIFICATION OF CRITICALITY ASSESSMENT TEAM

Role/Area Job Title Name Responsibilities

Process Owner

Engineering

Quality Assurance

Other

SECTION 2: DESCRIPTION OF SYSTEM AND DEFINITION OF SCOPE OF ASSESSMENT

Identification of Sub-Components Function(s) of Sub-component Determination of Impact on Either Product, Process, or


Environment based on Function

Direct / Indirect / No Impact

Direct / Indirect / No Impact

Direct / Indirect / No Impact


SECTION 3: INSTRUMENT CRITICALITY ASSESSMENT FOR DIRECT AND IN-DIRECT SUBCOMPONENTS ONLY

Sub-Component 1:

Instrument Id Function of Sub- Effect of Failure on Product Effect of Failure on Effect of Failure on Safety Criticality
Component Process

Critical/ Non-critical

Critical/ Non-critical

Critical/ Non-critical

Sub-Component 2:

Instrument Id Function Effect of Failure on Product Effect of Failure on Effect of Failure on Safety Criticality
Process

Critical/ Non-critical

Critical/ Non-critical

Critical/ Non-critical

SECTION 4: DEFINITION OF CALIBRATION RANGE, TOLERANCE AND FREQUENCY FOR CRITICAL INSTRUMENTION ONLY

Instrument Id Manufacturer Model Instrument Specification Process Requirements Periodicity/ Acceptance of


Frequency of Instrument
Operating Tolerance Process Process Calibration
Range Range Tolerance

Accept/Reject

Accept/Reject

Accept/Reject
SECTION 5: APPROVAL OF ASSESSMENT

Role/Area Name Signature Date

Process Owner

Engineering

Quality Assurance

Other

You might also like