METHOD STATEMENT
SYSTEM: AIR CONDITION & VENTILATION
METHOD STATEMENT FOR
FAN COIL UNIT INSTALLATION
1. GENERAL
This method statement describes the Fan Coil Unit installation. Detail of the procedure contained herein may be
modified based on the actual site condition.
2. EQUIPMENT AND TOOLS
Basic equipment for installation of ventilation fan is as follows; 2.1
Ladder
2.2 Scaffolding
2.3 Drilling machine
2.4 Wrench
2.5 Adjustable wrench
2.6 Chain lock
2.7 Spirit level
3. WORKING PROCEDURE
3.1 Site Preparation
3.1.1 Check the builder.s work and installation location.
3.1.2 Check setting out of pipe route lines
3.2 Equipment Check
3.2.1 Check FCU type and model.
3.2.2 Check visible damage of FCU.
3.2.3 Rotate fan blower by hand for abnormality check of blower and housing.
3.2.4 Ensure that there is no foreign material inside blower and housing.
3.3 Installation
3.3.1 Check dimension of FCU base and mounting points.
3.3.2 Fix expansion bolts, rods.
3.3.3 Size of hanger rods and type of vibration isolator shall be followed the summary table.
3.3.4 Hang or mount FCU with rubber pads or spring vibration isolator in accordance with
standard installation drawing.
3.3.5 Adjust FCU level to meet drain water flow to direction of condensate drain pipe. Fix
bolts, nuts and washers.
3.3.6 In case of FCU install in the conceal area, service panel minimum size 450x450 mm.
shall be provided. Service panel location and its detail drawing shall be coordinated with
architectural work in working drawing stage.
Page 1 of 4
METHOD STATEMENT
SYSTEM: AIR CONDITION & VENTILATION
4. QUALITY CONTROL
Quality control works should be performed in the particular works as discussed in the following.
4.1 FCU type and Model shall be checked before transportation to installation place.
4.2 Installation work shall be performed in accordance with approved shop drawing and acceptance by
inspection and check list as per attachment.
Page 2 of 4
METHOD STATEMENT
SYSTEM: AIR CONDITION & VENTILATION
AIR HANDLING UNIT INSTALLATION FLOW CHART
START
CHECK TYPE, MODEL AND DIMENTION OF FCU.S BASE OR SUPPORT
PREPARE FOR FCU.S SUPPORT OR HANGER
INSTALL
ADJUST LEVEL
FIX BOLTS, NUTS AND WASHERS
END
Page 3 of 4
METHOD STATEMENT
SYSTEM: AIR CONDITION & VENTILATION
CHECK LIST FOR FAN COIL UNIT INSTALLATION
PROJECT NAME : ____________________________ REF. NO. : ____________
LOCATION : ______________________________ DATE : ____/____/____
GRID LINE : ______________________________
REFER DRAWING NO. : _______________ REV. NO. : _______________
FCU : UNIT NO. __________________
: TYPE __________________
: MODEL __________________
INSPECTION AND STATUS
ITEM DESCRIPTION TEST REQUIRED SATISFIED UNSATISFIED REMARK
Equipment Type & Model
1 Type and Model Check Type & Model
Installation
1 Hanger and/or Support Physical Check
2 Adjust Level Physical Check
3 Bolts & Nuts Physical Check
4 Vibration Isolator Physical Check
Note: _____________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Inspected by: Approved by:
Signature: _______________ Signature: _______________
Name: __________________ Name: __________________
Date: ___________________ Date: ___________________
Page 4 of 4