Project: Subject: Owner Name:: Proposed One Storey Residential Building Bill of Materials and Cost Estimates

The document provides a bill of materials and cost estimates for a proposed one storey residential building. It includes estimates for earthworks, concrete works, masonry, doors and windows, wood truss, roofing, plumbing, electrical, and painting. The total construction cost is estimated to be PHP 2,039,087.40. It was prepared by the architect Felix A. Ogabang III and approved by the owner.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views8 pages

Project: Subject: Owner Name:: Proposed One Storey Residential Building Bill of Materials and Cost Estimates

The document provides a bill of materials and cost estimates for a proposed one storey residential building. It includes estimates for earthworks, concrete works, masonry, doors and windows, wood truss, roofing, plumbing, electrical, and painting. The total construction cost is estimated to be PHP 2,039,087.40. It was prepared by the architect Felix A. Ogabang III and approved by the owner.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

PROJECT: PROPOSED ONE STOREY RESIDENTIAL BUILDING

SUBJECT: BILL OF MATERIALS AND COST ESTIMATES


OWNER NAME:

UNIT DESCRIPTION QTTY. UNIT COST MTRL.COST TOTAL COST


EARTH WORKS
cu.m. EARTH FILL 45 300 PhP 13,500.00
cu.m. EXCAVATION 25 300 PhP 7,500.00
GRAVEL BASE
cu.m. Gravel Base 1''o 10 450 PhP 4,500.00
PhP 30,000.00
CONCRETE WORKS:
cu.m. Volume 140.00
bags Portland Cement 1,260 245 308,700 PhP 308,700.00
cu.m. Fine Sand 70 450 31,500 PhP 31,500.00
cu.m. 3/4''Crush Gravel 140 800 112,000 PhP 112,000.00
kgs. 10mmo Deform bars 1,500 40 60,000 PhP 60,000.00
kgs. 16mmo Deform bars 2,000 91 181,080 PhP 181,080.00
kgs. #16 G.I. Tie wire 5 80 400 PhP 400.00
PhP 693,680.00
MASONRY
pcs. 4"X8"X16" CHB 10,470 10.0 104,700 PhP 104,700.00
Mortar filler & Block laying
bags Portland Cement 50 220 11,000 PhP 11,000.00
cu.m. Fine Sand 20 450 9,000 PhP 9,000.00
Rebars
kgs. 10mm 0 Deform Bar 678 40 27,120 PhP 27,120.00
DOORS AND WINDOWS
Doors
sets D1: MAIN DOOR 13 3,000 39,000 PhP 39,000.00
Accessories
sets Door Knob at entrance 13 2,000 26,000 PhP 26,000.00
Windows
set W1:SIDING WINDOWS 12 4,500.00 54,000 PhP 54,000.00
PhP 324,820.00
Wood truss
pcs 2"x3" C PURLIS 127 750 95,250 PhP 95,250.00
pcs 2"X4" C PURLIS 50 1,200 60,000 PhP 60,000.00
kg nails lumsum PhP 4,000.00
PhP 159,250.00
ROOFING
sq.m. Philmetal Roofing 327.00 400 130,800 PhP 130,800.00
PhP 130,800.00
PLUMBING
Fixtures
sets Water Closet 1 12,000 12,000 PhP 12,000.00
sets Lavatory 1 2,500 2,500 PhP 2,500.00
sets Floor Drain 4"x4" 1 350 350 PhP 350.00
sets Kitchen sink 1 7,000 7,000 PhP 7,000.00
sets Faucet 5 450 2,250 PhP 2,250.00
Pipe and Fittings
lnts. 4"o PVC Pipe emerald 2 643 1,286 PhP 1,286.00
lnts. 2"o PVC Pipe 1 225 225 PhP 225.00
pcs. 2''o PVC Elbow 2 20 40 PhP 40.00
pcs. 2''o PVC Ptrap 7 20 140 PhP 140.00
lit Solvent Cement 1 150 150 PhP 150.00
pc. 1/2''o Gate Valve 1 250 250 PhP 250.00
pc. 1/2''o Check Valve 1 215 215 PhP 215.00
pcs. 1/2''o Tee PVC 5 31 155 PhP 155.00
pcs. 1/2''o Elbow plain PVC 4 30 120 PhP 120.00
pcs. 1/2''o Coupling PVC 5 30 150 PhP 150.00
pcs. 1/2''o Elbow PVC 5 130 650 PhP 650.00
pcs. 1/2''o PVC 4 115 460 PhP 460.00
PhP 27,941.00
ELECTRICAL
sq.m LUM-SUM PhP 50,000.00
PAINTING
sq.m LUM-SUM PhP 40,000.00

Labor cost ₱ 582,596.40


Buidling cost ₱ 1,456,491.00
Construction cost ₱ 2,039,087.40

PREPARED BY: APPROVED BY


AR.FELIX A. OGABANG III UAP
ARCHITEC OWNER
Beam-1 ties
RSB no. of bars spacing NO. L/4 4
X 4 0.05 NO. L/2 2
Y 4 0.1 NO. REBARS 5
Z 4 0.1 no. rebars 20mm 41
Rest 0.2
length of ties 3
no. beams 3
length of beam 11.7
no. rebars 10mm 64
Beam-2 ties horisontal bars
RSB no. of bars spacing NO. L/4 4
X 4 0.05 NO. L/2 1
Y 4 0.1 NO. REBARS 5
Z 4 0.1 no. rebars 20mm 760
Rest 0.2
length of ties 2
no. beams 125
length of beam 5.61
no. rebars 10mm 1533
Roof beam ties horisontal bars
RSB no. of bars spacing NO. L/4 4
X 4 0.05 NO. L/2 1
Y 4 0.1 NO. REBARS 5
Z 4 0.1 no. rebars 20mm 122
Rest 0.2
length of ties 2
no. beams 20
length of beam 5.61
no. rebars 10mm 246
TB ties horisontal bars
RSB no. of bars spacing
X 4 0.05
Y 4 0.1 NO. REBARS 6
Z 4 0.1 no. rebars 20mm 169
Rest 0.2
length of ties 2
no. beams 30
length of beam 5.61
no. rebars 10mm 368
Columns
RSB spacing no. obars
X 0.05 5
Y 0.1 5
Z 0.15 4
Rest 0.2
length of ties 1.2
no. columns 30
hight of column 16
no. of vertical bars 6
no. rebars 10mm 1026
no. rebars 20mm 480
footing 20mm 501
basement slab
length of slab 50
width of slab 25
spaceing of bars 0.2
no. rebars 10mm 7292
ground floor slab
no. rebars 10mm
no. rebars 20mm
no. rebars 25mm
no. rebars 12mm
no. rebars 16mm
column only
Lateral perimeter of column 2.2 no. of Plywood post: 489 pcs
shorter side of the column 0.5 area of plywood 2.88
the longer side of column 0.5

Area 1408
number of columns 40
post hight 16

BEAM 2
Lateral perimeter of beam 2 1.6 no. of Plywood beam: 564 pcs
shorter side of the beam 2 0.6 area of plywood 2.88
the longer side of beam2 0.3 column braces,supports
total span of columns 625
Area 1122 number of columns 125
number of columns 125 height of column 5
column length 5.61 scaffolding for beam
BEAM 1-A total span of beam 701
Lateral perimeter of beam 2 scaffolding for conrete slab
shorter side of the column 0.8 total area of slab 100.47
the longer side of column 0.3 PLUS 20% 20.8 0

Area 46.8
number of columns 2
column length 11.7
BEAM 1
Lateral perimeter of column 0.1
shorter side of the column 0
the longer side of column 0

Area 0
number of columns 0
column length 0
TIE BEAM
Lateral perimeter of column 1.3
hight of tie beam 0.6
Area 218.79
number of columns 30
tie beam length 5.61
ROOF BEAM
Lateral perimeter of column 1.2
shorter side of the column 0.3
the longer side of column 0.5

Area 134.64
number of columns 20
column length 5.61

27154
2032
1945
4580
1605
lumber 2" X 2" (post): 14509 bd.ft.

lumber 2" X 2" (beam): 37833 bd.ft.


lumber 2" X 3" (beam): 9497 bd.ft.
PLUS 20% 0