Sketch of Basic Stringing Work For 500 KV Transmission Line Jawa 1 CCP Project

This document outlines the basic stringing work for a 500 kV transmission line project. It shows the process of stringing the conductor, pilot wires, and backstays between towers using tensioners, flying boards, insulators, and an anchorage system. The pilot wires of different diameters are strung first before the main conductor using rewinders and tensioners mounted on towers along the line.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
759 views1 page

Sketch of Basic Stringing Work For 500 KV Transmission Line Jawa 1 CCP Project

This document outlines the basic stringing work for a 500 kV transmission line project. It shows the process of stringing the conductor, pilot wires, and backstays between towers using tensioners, flying boards, insulators, and an anchorage system. The pilot wires of different diameters are strung first before the main conductor using rewinders and tensioners mounted on towers along the line.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

SKETCH OF BASIC STRINGING WORK FOR 500 KV TRANSMISSION LINE JAWA 1 CCP PROJECT

GSW 100mm2
Flying Board Backstays
Insulator & Montage roll

Pilot wire 12mm Pilot wire 14mm


T.1 T.3, 4, 5, ... T.293
Rewinder for
Tensioner Pilot wire Engine 1,5-2M
Anchorage (Dead Men)