Comprehensive Risk Assessment Deliverables

The document outlines the various studies required for a Quantitative Risk Assessment of an FPSO unit. It lists the input documents and deliverables for each study, including piping diagrams, process information, layouts, and previous reports. The key studies include a Quantitative Risk Assessment, Fire and Explosion Risk Analysis, Smoke and Gas Dispersion Analysis, and Escape and Evacuation planning. The deliverables will be risk assessment reports and safety documentation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
468 views9 pages

Comprehensive Risk Assessment Deliverables

The document outlines the various studies required for a Quantitative Risk Assessment of an FPSO unit. It lists the input documents and deliverables for each study, including piping diagrams, process information, layouts, and previous reports. The key studies include a Quantitative Risk Assessment, Fire and Explosion Risk Analysis, Smoke and Gas Dispersion Analysis, and Escape and Evacuation planning. The deliverables will be risk assessment reports and safety documentation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Input Documents and Deliverables

Quantitative Risk Assessment (QRA) Study:

Study Input Documents Deliverables


Quantitative Risk Assessment  Piping & Instrumentation Diagrams (P&ID’s); QRA Study Report along with approved
(QRA) Study  Process Flow Diagram (PFDs); QRA Assumption Register
 Heat & Mass Balance(H&MB);
 Layout Drawings
 Equipment Layouts
 Isometric drawings
 Process Design Basis
 Living Quarters manning details
 Manning levels at various decks and occupancy level
 Meteorological & Tidal data with reference height
 Previous QRA reports (P1501-TOS-70000-FS-ST-0034)
 FPSO Technical Description (P1501-TOS-70000-NA-SP-0008
 Structural Properties of FPSO
 Operational and Control Philosophy;
 HSE Philosophy Document
 Isolation, Vent & Drain Philosophy (if available)
 Blow down and flaring Philosophy (if available)

Fire & Explosion Risk Analysis (FERA):

Study Input Documents Deliverables


Fire & Explosion Risk Analysis  Piping & Instrumentation Diagrams (P&ID’s); FERA Study Report
(FERA)  Process Flow Diagram (PFDs);
 Heat & Mass Balance(H&MB);
 Process Design Basis
 Process Description
 Plot Plan / Overall Field Layout
 Pipeline Routing Layout
 Operational and Control Philosophy;
 Fire Protection Design Basis
 Fire Fighting Layout
 Loss Prevention Philosophy
 Previous HAZOP reports
 Existing/New Active and Passive Fire Protection Details
Smoke & Gas Dispersion Analysis:

Study Input Documents Deliverables


Smoke & Gas Dispersion  Process flow diagram ( PFD ) Smoke & Gas Dispersion
Analysis  Piping and Instrumentation diagram ( Analysis Study Report
P & ID )
 Heat and Mass Balance (H&MB)
 Layout Drawings
 HSE Philosophy Document
 Blow Down and flaring Philosophy
 Isolation, Vent & Drain Philosophy
 Process Design Basis

Escape, Temporary Refuge, Evacuation And Rescue Analysis (ETRERA):

Study Input Documents Deliverables


Escape, Temporary Refuge,  Overall facility layout showing ETRERA Study Report
Evacuation And Rescue Emergency Escape routes and
Analysis (ETRERA) Assembly points
 Existing Emergency Response Plan (If
available)

Emergency Systems Survivability Analysis (ESSA):

Study Input Documents Deliverables


Emergency Systems  Existing Emergency System in FPSO ESSA Study Report
Survivability Analysis including Major Accident
(ESSA) Hazards (MAH) Register
Fire & Gas Mapping Study:

Study Input Documents Deliverables


Fire & Gas Mapping Study  Piping & Instrumentation Diagrams Fire & Gas Mapping Study
(P&ID’s); Report
 Process Flow Diagram (PFDs);
 Process Design Basis
 Heat & Mass Balance(H&MB);
 Layout Drawings
 Piping isometric drawings
 F&G Philosophy
 Existing Fire Protection system details

Thermal Plume Dispersion and Turbulent Analysis:

Study Input Documents Deliverables


Thermal Plume Dispersion  Piping & Instrumentation Diagrams Thermal Plume Dispersion
and Turbulent Analysis (P&ID’s) and Turbulent Analysis
 Process Design Basis Study Report
 Heat & Mass Balance(H&MB);
 Blow down rates (Peak/Emergency)
 Layout Drawings
 Piping isometric drawings
 Operational and Control Philosophy

Non Flammable Hazards Analysis (NFHA):

Study Input Documents Deliverables


Non Flammable Hazards  Equipment list Non Flammable Hazards
Analysis (NFHA)  Safe working load of equipment Analysis (NFHA) Study
 Layout drawings Report

 Shutdown and Isolation Philosophy (If


available)
 Operating and Control Philosophy (If
available)
 Pipeline and Riser Protection Study
report
 Specification for RLE, Refurbishment,
Conversion & Integration of FPSO
(P1501-TOS-70000-MA-SP-0003)
 Helicopter Trip Frequency
 Loading / Unloading operation
schedule
 Mooring Schedule
 Pipelines line list
 Valves list
 Loss time incident record

Formal Safety Assessment (FSA):

Study Input Documents Deliverables


Formal Safety Assessment  QRA Study report Conducting a Major
(FSA)  Project HSE Plan Accident Hazard workshop
to develop an Operational
Safety Case for the FPSO
Formal Safety Assessment
(FSA) Study Report

ALARP and CBA Assessment:

Covered under QRA Study.

Emission Study:

Study Input Documents Deliverables


Emission Study  Piping & Instrumentation Diagrams Emission Study Report
(P&ID’s)
• Emission source, type, frequency,
flow rate/Quantity details
• Flaring philosophy (If available)

Safety Critical Elements (SCE) Identification

Study Input Documents Deliverables


Safety Critical Elements • Safeguarding diagram Safety Critical Elements
(SCE) Identification • Cause & Effect diagram (SCE) Identification Report
• List of safety Relief valves, HIPPS
valves and Bursting disc details

Safety Critical Elements Performance Standards (SCE-PS)

Study Input Documents Deliverables


Safety Critical Elements • Safety critical elements performance Safety Critical Elements
Performance Standards standards (If available) Performance Standards
• Operational and Control Philosophy
• Cause & Effect diagram
• Line list
• Alarm and Trip schedule details

Study for the need of PFP System

Study Input Documents Deliverables


Study for the need of PFP  Piping & Instrumentation Diagrams Passive fire protection
System (P&ID’s) report including
• Extent and rating of fire identifying fire sources,
• Areas to be protected precaution
• Line list methodologies, safe
• Equipment list handling of PFP products
and etc.

Design Safety Case

Study Input Documents Deliverables


Design study case  Piping & Instrumentation Diagrams Design Safety Case
(P&ID’s)
• Management roles & responsibilities
• Facility description
• Maintenance schedule for the entire
FPSO.