0% found this document useful (0 votes)
120 views4 pages

Daily Work Report for Mbarara Hospital

The daily works report provides an update on the proposed redevelopment of Mbarara Hospital in Uganda. It includes details of the project such as the owner, contractor, location, and consultant. Information is also given on weather conditions, visitors, deliveries, manpower, plant/equipment used, and a description of the day's work. The report is prepared by the project/site quantity surveyor and approved by the project/site engineer.

Uploaded by

Munaba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views4 pages

Daily Work Report for Mbarara Hospital

The daily works report provides an update on the proposed redevelopment of Mbarara Hospital in Uganda. It includes details of the project such as the owner, contractor, location, and consultant. Information is also given on weather conditions, visitors, deliveries, manpower, plant/equipment used, and a description of the day's work. The report is prepared by the project/site quantity surveyor and approved by the project/site engineer.

Uploaded by

Munaba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
  • Daily Works Report Form

EXCEL CONSTRUCTION LIMITED

PROJECT NAME: DAILY WORKS REPORT


THE PROPOSED REDEVELOPMENT OF MBARARA Date:
HOSPITAL
Contract No. BH-SHSSPP/WRKS/08-09/00019
1. Contract Details

OWNER: CONTRACTOR: EXCEL CONSTRUCTION LIMITED

LOCATION: PROJECT MANAGER:

CONSULTANT: PROJECT ENGINEER:

2. Other Details 3. Deliveries


Weather: Time Visitors: Description Qty Description Qty
Sunshine to 1
to 2
Rainfall to 3

Safety Events/Issues: 4
5

4. Man power 5. Plant/Equipment

OCCUPATION No. Hrs OCCUPATION No. Hrs Equipment Description No Hrs

0 TOTAL:

6. Description of Work

PREPARED BY: APPROVED BY: RECEIVED BY:


PROJECT/SITE QS PROJECT/SITE ENGINEER EL - ARCHS PARTNERSHIP
ONSTRUCTION LIMITED