Week 1 1) Just-In-Time was successfully implemented by; 1 point
Week 2 Toyota
Honda
Week 3
Suzuki
Week 4 Volkswagen
Week 5 No, the answer is incorrect.
Score: 0
Week 6 Accepted Answers:
Toyota
Week 7
2) POK stands for; 1 point
Week 8
Product Ordering Kanban
Week 9
Process Ordering Kanban
Week 10 Production Ordering Kanban
Plan Ordering Kanban
Week 11
No, the answer is incorrect.
Week 12 Score: 0
Just In Time Accepted Answers:
(JIT) Production Ordering Kanban
Kanban 3) The following is (are) the prerequisite(s) for JIT; 1 point
System
Multi skilled workers
Materials
Requirement Vendor should produce defect free
Planning
(MRP)-I Worker should be empowered for his own decision
Materials All of the above
Requirement
Planning No, the answer
© 2014 NPTEL -isPrivacy
incorrect.
& Terms - Honor Code - FAQs -
(MRP)-II
A project of Score: 0 In association with
Enterprise Accepted Answers:
Resource All of the above
Planning (ERP)
Funded byon;
4) Just-In-Time technique has major emphasis 1 point
Quiz :
1 of 3 Thursday 17 May 2018 05:43 PM
Operations Management - - Unit 13 - Week 12 [Link]
Assignment 12 Powered by
Zero inventories
Feed back
week-12 Reduced manpower
Solution for Over production
Assignment 12 All of the above
DOWNLOAD No, the answer is incorrect.
VIDEOS Score: 0
Accepted Answers:
Zero inventories
5) Which one of the following items is NOT a part of the fundamental JIT concept? 1 point
Right place
Right time
Right quantities
Right customer
No, the answer is incorrect.
Score: 0
Accepted Answers:
Right customer
6) Just-In-time (JIT) does NOT include which one of the following? 1 point
Lean manufacturing
High inventory production
Fast-throughput manufacturing
None of the above
No, the answer is incorrect.
Score: 0
Accepted Answers:
High inventory production
7) Kanban is a visual system for controlling production. 1 point
True
False
No, the answer is incorrect.
Score: 0
Accepted Answers:
True
8) Modular design and standard parts are two elements of product design in lean systems. 1 point
True
False
No, the answer is incorrect.
Score: 0
Accepted Answers:
True
9) Kaizen relates to continuous improvement. 1 point
True
2 of 3 Thursday 17 May 2018 05:43 PM
Operations Management - - Unit 13 - Week 12 [Link]
False
No, the answer is incorrect.
Score: 0
Accepted Answers:
True
10)What does ERP stand for? 1 point
Enterprise resource planning
Expanse research project
Enterprise research planning
Expanse resource project
No, the answer is incorrect.
Score: 0
Accepted Answers:
Enterprise resource planning