The document is an intimation letter from the Hyderabad Metropolitan Water Supply & Sewerage Board to T Subbarao regarding payment for water and sewerage connections to a property. It provides details of the charges to be paid within 57 days, totaling Rs. 609,200. It includes water supply connection charges, 60 days water consumption charges, meter costs, and various other fees. Instructions are provided regarding meter installation and requirements that must be met before the connections will be released.

Uploaded by

thotauma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

Water Connection - Report

The document is an intimation letter from the Hyderabad Metropolitan Water Supply & Sewerage Board to T Subbarao regarding payment for water and sewerage connections to a property. It provides details of the charges to be paid within 57 days, totaling Rs. 609,200. It includes water supply connection charges, 60 days water consumption charges, meter costs, and various other fees. Instructions are provided regarding meter installation and requirements that must be met before the connections will be released.

Uploaded by

thotauma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

HYDERABAD METROPOLITAN WATER SUPPLY & SEWERAGE BOARD

OFFICE OF THE GENERAL MANAGER (ENGG) PRINT DATE : 20/08/2019

INTIMATION FOR PAYMENT (In Committee No , Sl.No , Dt. )

To
T Subbarao,
File No : 2019-5-2585
PLOT NO.5, SRI BALAJI LAYOUT, SHAPURNAGAR MAIN Circle : Circle - 4
RD, 500055 Division : Division 12 (QUTHUBULLAPUR)
Category : MULTI STORIED BUILDING
Revenue Category :M1-MSAC-DOMESTIC

Sir/Madam ,
Sub :- Your Application for Sanction of WaterAndSewerage connection -Reg.
Adverting to the subject cited,it is to inform that 25mm Water Supply Connection and corresponding Sewerage
Connection to the premises bearing PLOT NO.5, SRI BALAJI LAYOUT, SHAPURNAGAR MAIN RD, 500055 is
under consideration for sanction (the Connection may be released if the water supply main is within 35 rmt or after
laying of pipeline otherwise the connection charges may be refunded). It is hereby requested to make the payment of
the following charges with in 57 days (by 12/10/2019) otherwise your application will become Inactive. Intimation
For Payment Generated Date: 16/08/2019.
The Following is the breakup:
Water Supply Connection Charges (468) SqMtrs : Rs. 270000.00
60 Days Water Consumption Charges : Rs. 8200.00
Meter Cost 25 mm : Rs. 37000.00
Green Brigade Charges ( DCW ) : Rs. 11000.00
RWHS Consultancy Charges ( DCW ) : Rs. 3000.00
Water Supply Connection Improvement ( DCW ) : Rs. 280000.00
Sewerage Improvement Charges ( DCW ) : Rs. 0.00
Main Infrastructure Development Charges : Rs. 0.00

Road Restoration Charges : Rs. 0.00


Total Amount : Rs. 609200.00
Total Deduction : Rs. ( - ) 0.00

Tentative Amount : Rs. 609200.00

Amount In Words : Rupees Six Lakhs Nine Thousand Two Hundred And Zero Paise Only

The Payment to be made in full (no part payment ) through NEFT/RTGS

NEFT/RTGS account details For Axis Bank: NEFT/RTGS account details For ICICI Bank:
---------------------------------------------------------- ------------------------------------------------------------
Account No: 181512019052585 Account No: HMWS12019052585
Bank & Branch: Axis Bank, Mumbai Bank & Branch: ICICI Bank Ltd. & CMS HUB
Account Name: HMWSSB Account Name: HMWSSB
IFSC Code: UTIBØCCH274 IFSC Code: ICICØØØØ1Ø4 Digitally Signed By
M SRIDHAR REDDY

Hyderabad Metropolitan Water Supply & Sewerage Board Powered by


CoOptions Technologies Limited
OFFICE OF THE GENERAL MANAGER (ENGG) PRINT DATE : 20/08/2019

NOTE :
1. The applicant should purchase and hand over to GB agency a water meter conforming to ISO-4064,
Class-B for releasing Connection.
2. Water Connection will be released only after constructing Meter Chamber of size 0.45m X 0.45m (1.5ft
X 1.5 ft) for 15mm dia and 0.75m X 0.75m (2.5ft X 2.5ft) for 20mm to 40mm dia and fixing of Meter
at applicants cost. The applicant has to safe guard the water meter from theft or any tampering.

3. Connection will be released only after constructing Meter Chamber and fixing of AMR Meter.

4. Connections sanctioned under Bulk Category, upto the agreed quantity the rate per KL is
and above agreed quantity will be charged at per KL.
5. The additional length of connection from meter chamber to sump has to be taken up at the cost of the
applicant.
6. Connection will be released only after laying the proposed Main, if lines are not existing and water
supply and sewerage improvement charges are levied.

7. Construction of Rain Water Harvesting structure in the premises where plot area is more than 200
Sq.mts is mandatory.
8. Occupancy Certificate is mandatory for all buildings, however in respect of individual buildings in
plots upto 100 Sq.mtrs with height upto 7mtrs obtaining OC is optional.

9. Connection will be released only after submission of Occupancy Certificate from GHMC or else
connection will be released duly levying the monthly water bill @ 3 times of normal tariff.

10. Obtaining the Sewerage connection is the responsibility of the applicant duly consulting the HMWSSB
& GHMC field officers.If road cutting permission is required for obtaining the sewerage connections,
the applicant shall obtain the same from GHMC by paying requisite charges.

11. Silt chambers are mandatory for all commercial buildings and for all connections under Category-II &
III.
12. Any other supplemental works inside the applicant’s premises relating to release of water supply &
sewerage connection such as dismantling and restoration of ramps, CRS masonry, drilling to sump, etc.
has to be taken up at the cost of the applicant.
13. HMWSSB reserves the right to revise this order at any time if the field particulars are found to be
incorrect.
14. The connection given to the premises does not confer any legal right regarding the property in
question.
15.As per Cir.No.CE(M)/GHMC/TA-11/K1/2018-19/292 Dated 22/05/2018 all the Connection works
which involve Road cutting and Restoration will be executed after 15/10/2018 after receding of
Monsoon.

Hyderabad Metropolitan Water Supply & Sewerage Board Powered by


CoOptions Technologies Limited
OFFICE OF THE GENERAL MANAGER (ENGG) PRINT DATE : 20/08/2019

JOIN OUR HAPPY CUSTOMER FAMILY

Hyderabad Metropolitan Water Supply & Sewerage Board Powered by


CoOptions Technologies Limited

You might also like