DAY -1 DAY – 6 DAY – 11
NAVIGATION Scheduling the project
Setting Project status
Primavera P6 overview Scheduling overview
Defining Project Status
An introduction to Primavera P6 Setting up Project Dates Calculating a Schedule
Dashboards, Portfolios, Projects Setting up Project Codes Analyzing Schedule Dates
and Resources Tabs Project Parameters
Project Shortening a Project Schedule
Project Workspaces DAY –7 DAY – 12
Navigating the Project Pages Exercise -1 Formatting Project Data
Project phases and life cycle DAY – 8 Formatting overview
DAY – 2 Codes, Notebooks, Calendars
Grouping
STRUCTURING THE PROJECT Sorting
Project Codes
Enterprise Project Structure (EPS) Resource Codes Filtering
overview Activity Codes DAY – 13-14
Modifying the EPS Notebooks Resource management
Organizational Breakdown Global Calendar Types of resources
Structure (OBS) Resource Calendar Units of measures
Project
j Calendar Creating resource
DAY – 3
DAY – 9 Default & Maximum units per time
Project controls
Adding activities Resource price
User administration
Resource shift creation
Activities overview
User control & Limited access
Entering manpower resources
Describing an Activity and its
provisions Entering Material resources
attributes
Setting user preferences Entering Construction equipment
Working with Activity Types
DAY – 4 resources
Adding Activities
Project creation Creating roles
Duration Types
Project creation overview Assigning roles
Assigning Activity Codes
Project calendars Assigning roles to resources
Activity summary
Working with calendars Assigning roles to activities
DAY – 10
Resource
R lloading
di
Creating new project Relationships & Constraints
Resource Curves
DAY – 5 Relationships overview
Bucket loading
WORK BREAKDOWN STRUCTURE Relationship Types DAY – 15
(WBS) Creating Relationships
Exercise -2
Work Breakdown Structure (WBS) Performing a Forward and
overview Backward Pass DAY – 16
Defining a WBS Apply a Constraint to an Activity Baselines
Modifying the WBS Critical Path Method Baselines overview
Modifying the Project Duration Creating a baseline
Working with baselines
DAY -17-18 DAY – 23 -24
P j t costt managementt
Project
Reporting
Project Funding Sources
Template Reporting
Activity Costing
Manual Reporting
Expenses
Report Batches
Estimating Budgeted and Actual
Procurement Report
cost for Activities
Project Progress Report
Project
Establishing budgets for Work
Schedule Comparison Report
Packages
Weekly Report
Estimating Project Budgets
Project Cost Report
Preparing Project Cash Flow
Project Closing Report Client
Cost Comparison Analysis
Cost Monitoring & Revisions DAY – 25
Project Budget revisions Other features
DAY – 19 Project Portfolio Management
Project Risk management Managing Multiple Projects
Identifying Project Risk Project Work Products &
Categorizing Risk Documents
Creating Layouts
Analysing Pre-Risk Impact
User Defined Fields
Setting risk control plan
Global Change
Post Risk Impact Analysis
Store Period Performances
Finding Risk cost Recalculate Assignment Cost
Cause and effect analysis
DAY – 25
DAY – 20-21
I
Importing
ti & exporting
ti data
d t
Project monitoring and control
Import & Export the project data
Setting up & Assigning Baselines
Project Management Concepts
Apply Actuals
DAY –26 to 30
Progress Update
Project work
Look Ahead Schedule
Delay Impact Analysis
Earned Value Analysis
S-Curve Analysis
Setting up Project Thresholds
Project Issue Register
Working
W ki iin P
Project
j t Issues
I
Leveling Project Resources
Project Tracking
DAY –22
Exercise -3