100% found this document useful (1 vote)
288 views2 pages

Wastewater Treatment Calculations

The document provides solutions to three problems related to activated sludge systems. The first problem calculates a sludge waste rate of 68 m3/day given design parameters. The second problem estimates the required air supply of 38,853 m3/day. The third problem calculates the required aeration tank volume as 788.5 m3 given effluent standards and characteristics of the influent wastewater.

Uploaded by

Uý Đại
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
288 views2 pages

Wastewater Treatment Calculations

The document provides solutions to three problems related to activated sludge systems. The first problem calculates a sludge waste rate of 68 m3/day given design parameters. The second problem estimates the required air supply of 38,853 m3/day. The third problem calculates the required aeration tank volume as 788.5 m3 given effluent standards and characteristics of the influent wastewater.

Uploaded by

Uý Đại
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Tutorial 4 (Solutions)

1. If 5 days mean cell residence time is to be maintained and sludge contained 5700 mg/L,
what should the sludge waste rate? Volume of the aeration tank is 970 m 3 and MLVSS in the
tank 2000 mg/L.

Solution:

VX
θc =
Qr X r

5 days = 970 m3 * 2000 mg/L/(5700 mg/L * Qr)

Qr = 68 m3/day

2. Estimate the volume of the air to be supplied (m 3/d) for the new activated sludge using the
following data. Assume that BOD5 is the 68% of the ultimate BOD and the oxygen transfer
efficiency is 8%.

Data:
 Flow = 0.15 m3/s
 Air density = 1.185 kg/m3
 O2 in the air = 23.2%
 BOD5in = 84 mg/L, BOD5out =11 mg/L
 Waste activated sludge produced =378 kg/d

Solution

MO2 = Q (So-S) *10-3 kg/g/f -1.42 Px

= 0.15 *24 *3600 (84-11) *10-3/0.68 – 1.42*378 = 854.5 kg/day

Density of air = 1.185 kg/m3

% O2 in the air = 23.2%

Volume of air = 854.5/(1.185*23.2/100) = 3108.3 m3/day


If air transfer efficiency is 8%, volume of air = 3108.3/8/100 = 38853 m3/day

3. The town of Gatesville has been directed to upgrade its primary WWTP to a secondary plant
that can meet an effluent slandered of 30.0 mg/l BOD5 and 30 mg/l suspended solid (SS).
They have selected a completely mixed activated sludge system.
Assuming that BOD5 of the SS may be estimated as equal to 63% of the SS concentration,
estimate the required volume of the aeration tank. The following data are available from the
existing primary plant. Flow = 0.150m3/s, BOD= 84.0 mg/l, Assume the following values for
the growth constants, Ks = 100 mg/l BOD5, µm= 2.5 d-1, Kd = 0.05 d-1, Y = 0.50 mg VSS/mg BOD5
removed.

Solution

S = BOD5 allowed – BOD5 in the suspended solid = 30 -30 *0.63 = 11.1 mg/L

K s ( 1+ K d θc )
S=
θ c ( μm −k d )−1

100 ( 1+0.05 θc )
11.1=
θ c ( 2.5−0.05 )−1

ϴc = 4.0 day

ϴ s Y ( S o−S)
X=
t o ( 1+ θc K d )

Assume MLVSS (X) = 2000 mg/L

5∗0.5(84−11.1)
2000=
t o ( 1+0.05∗5 )

to = 0.0608 d = 1.46 h

Volume = retention time * flow rate = 1.46*3600*0.15 m3 = 788.5 m3