Main Barrages Portion
Crest:
• Crest is the weir surface at the required height above the floor at which gates rest at
its closed position.
Impervious Floor:
• It prevents scouring under
the impervious floor.
• To serve as inverted filter.
• To check scour downstream.
• To withstand high velocities
d/s of the hydraulic jump.
Thursday, July 2, 2020 9