75% found this document useful (4 votes)
2K views11 pages

BMS System Point List & Notes

The document discusses the building management system (BMS) for a medical facility in Saudi Arabia. It provides 17 general notes specifying requirements for the BMS, including that it will use Lonworks protocol, each direct digital controller must be stand-alone, and the BMS contractor must provide all necessary interfaces and consider redundancy. The BMS contractor is responsible for the complete BMS system operation and all associated control, monitoring, and programming.

Uploaded by

calidad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
2K views11 pages

BMS System Point List & Notes

The document discusses the building management system (BMS) for a medical facility in Saudi Arabia. It provides 17 general notes specifying requirements for the BMS, including that it will use Lonworks protocol, each direct digital controller must be stand-alone, and the BMS contractor must provide all necessary interfaces and consider redundancy. The BMS contractor is responsible for the complete BMS system operation and all associated control, monitoring, and programming.

Uploaded by

calidad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • System Overview and Index
  • Control Schematics
  • Operational Diagrams
  • Control Panels and Wiring Details
  • Specific Area Configurations

OWNER

KINGDOM OF SAUDI ARABIA


A MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
GENERAL NOTES: RIYADH 11525, SAUDI ARABIA

BUILDING MANAGEMENT SYSTEM CONSULTING ARCHITECT


1. BUILDING MANAGEMENT SYSTEM (BMS) SHALL UTILIZE LONWORKS PROTOCOL. HKS ARCHITECTS, PC.
2. DIRECT DIGITAL CONTROLLERS (DDCs) TO BE USED SHALL BE FULLY STAND-ALONE DEFINED BY
A HAVING ITS OWN INTERNAL CLOCK, DATA GATHERING MEMORY BANK AND CENTRAL PROCCESSING UNIT. 235 E. MAIN STREET, SUITE 102C
3. EACH DDC PANEL SHALL BE CAPABLE OF ACTING INDEPENDENTLY FROM THE BMS NETWORK. CONTROL AND MONITORING NORTHVILLE, MI 48167, U.S.A.
PROGRAMS OF EACH DDC POINT SHALL STILL BE IN EFFECT EVEN IN CASES OF DISCONNECTION FROM THE NETWORK DUE TO
TECHNICAL / INCIDENTAL MATTERS.
CIVIL / LANDSCAPE
4. HIGH LEVEL INTERFACE VIA RS 232/485 COMMUNICATION LINK SHALL BE REQUIRED FOR A SELECTED ELECTRO-MECHANICAL
EQUIPMENT FOR ACCURATE DATA GATHERING. THE HIGH LEVEL INTERFACE INCLUDES A THIRD PARTY INTERFACE WHICH IS DIFFERENT STRUCTURAL / MEP ENGINEER
FROM THE LON WORKS PROTOCOL USED BY THE BMS WHICH INCLUDES MODBUS, BACNET,PROFIBUS, ETC. DAR ENGINEERING
THE CONTRACTOR SHALL PROVIDE THE NECESSARY DEVICES TO THE ADAPT THE THIRD PARTY INTERFACE TO THE PRIMARY
NETWORK PROTOCOL P.O. BOX 301
5. THE BMS CONTRACTOR SHALL CONSIDER IN THE BMS OPERATIONS PROGRAMMING THE REDUNDANCY OF DATA GATHERING RIYADH 11411, SAUDI ARABIA
AND OPERATIONS.
6. THE BMS CONTRACTOR SHALL CONSIDER PROVISION OF THE THIRD PARTY INTERFACE TO OTHER SYSTEMS
IN THE BUILDING SUCH AS;
A. FIRE ALARM SYSTEM
B. SECURITY SYSTEM (CCTV (SURVEILLANCE SYSTEM) AND ACCESS CONTROL)
C. LIGHTING CONTROL SYSTEM
D. OTHER ELECTRO-MECHANICAL SYSTEMS
7. THE PURPOSE OF THE SCHEMATIC DIAGRAM IS TO PROVIDE THE GENERAL CONCEPT AND PRINCIPLE OF THE PROPOSED
KFMC BUILDING MANAGEMENT SYSTEM (BMS).
8. THE EQUIPMENT AND DEVICES REFLECTED ON THE PLANS ARE INDICATIVE ONLY. THE BMS CONTRACTOR SHALL FURNISH
THE WHOLE SYSTEM TO INCLUDE ALL CABLES, DEVICES, FIELD DEVICES, ACCESSORIES, SOFTWARE PROGRAMMING,
AND ENGINEERING WORKS AS MAY DEEM NECESSARY FOR A COMPLETE AND SUCCESSFUL OPERATION OF THE SYSTEM.
9. ALL BMS POINTS INDICATED ON THE PLAN ARE INDICATIVE ONLY. THE CONTRACTOR SHALL ENSURE THAT ALL BMS
CONTROL POINTS REQUIRED FOR THE ELECTRO-MECHANICAL OPERATIONS ARE COMPLETELY CONSIDRED.
10. THE BMS CONTRACTOR SHALL PROVIDE AND SUBMIT THE ACTUAL CONTROL AND MONITORING DIAGRAM (SHOP DRAWINGS)
FOR EACH SYSTEM OR EQUIPMENT FOR THE APPROVAL OF THE CONSULTANT PRIOR TO INSTALLATION.
11. BMS CONTRACTOR SHALL DETERMINE THE SIZES OF DDC ENCLOSURES WITH CONSULTANTS APPROVAL PRIOR TO INSTALLATION.
12. BMS TERMINAL BOXES SHALL INCLUDE REPEATER CIRCUITS. THE BMS CONTRACTOR SHALL DETERMINE EXACT QUANTITY OF
REPEATERS , WHENEVER NECESSARY.
13. THE UNIT RATE FOR EACH BMS POINT SHALL INCLUDE THE FOLLOWING WORKS:
A. DIRECT DIGITAL CONTROLLERS (DDC'S) AND ALL ASSOCIATED ACCESSORIES.
B. ALL COMMUNICATION / CONTROL SIGNAL CABLES, CONDUITS / TRUNKING, TERMINATION, ETC. RIYADH, SAUDI ARABIA
C. ALL FIELD SENSORS, DEVICES INCLUDING FLOW METER.
A DIFFERENTIAL PRESSURE SWITCH, TEMPERATURE SENSORS, ETC.
D. SOFTWARE AND PROGRAMMING.
E. GRAPHIC GENERATION AND TREND LOGGING.
F. ELECTRICAL TERMINAL, CONTRACTORS, MARSHALING BOX, ETC.
G. TESTING AND COMMISSIONING.
14. THE BMS CONTRACTOR SHALL CONSIDER THE SPARE POINTS IN THE BMS POINTS LIST.
15. THE BMS CONTRACTOR SHALL CONSIDER THE REQUIRED BMS POINTS IN THE OPERATION OF OTHER ELECTRO-MECHANICAL
EQUIPMENT REQUIRED IN THE ELECTRO-MECHANICAL DESIGN BUT NOT EXACLTY MENTIONED IN THE ATTACHED
BMS POINTS LIST. ANY BMS POINTS NOT CONSIDERED BY THE BMS CONTRACTOR ON THE BMS PACKAGE BUT
REQUIRED IN THE SYSTEM OPERATION SHALL BE UNDER THE RESPONSIBILITY OF THE BMS CONTRACTOR . NO ADDITIONAL
COST AND TIME SHALL BE PROVIDED TO THE CONTRACTOR.
16. THE SUPPLY OF ALL NECESSARY INTERFACE / TRANSDUCERS / MODULE /ACCESSORIES FOR EFFECTIVE BMS/ FA
NOTES:
INTERLOCKS / CONTROLS / MONITORING, ETC. AS DEFINED IN THE RELEVANT SPECIFICATION CLAUSE SHALL BE INCLUDE IN THE BMS
CONTRACTOR'S SCOPE OF WORKS. 1. FOR GENERAL NOTES REFER
17. ALL WIRING INSTALLATION WORKS SHALL BE IN ACCORDANCE WITH THE NEC AND SASO STANDARDS.
TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


LEGEND: INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
- 400mm (W) x 400mm (H) x 200mm (D)
PB (OR SIZE AS REQUIRED) MECHANICAL EQUIPMENT.
DDC - DIRECT DIGITAL CONTROLLER

HLI - HIGH LEVEL INTERFACE


3. FINAL LOCATION OF DDC & HLI
BMS - BUILDING MANAGEMENT SYSTEM
SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
Generator Priority Loading - KFMC FOR APPROVAL.
Priority 1 - Life Safety Loads/Critical Loads

Life Safety Branch:

a. Illumination of means of egress.


b. Exit lighting fixtures.
c. Alarm and alerting systems such as fire alarm and medical gas systems.
d. Communication systems : if used during emergency conditions, they shall include:
(1) Disaster Control or emergency communication centers, i.e. communication equipment,
selected receptacles, and task illumination
(2) Public address system (PA).
(3) Nurse Call System
e. Generator set location : typical for all task illumination, battery charger for emergency battery
powered lighting, and selected receptacles, and
f. Elevators: cab lighting, control intercom, signal systems, and elevator machine room lighting.
g. Fire Pumps
h. Smoke Control and Stair Pressurization System REFERENCE DRAWINGS

The Critical Branch DESCRIPTION DWG. NOS

a. Data Centre / Building Management System

Priority 2 - Equipment System necessary for Hospital Operations

1. Arrange the following equipment for delayed-automatic connection to the alternate power source thru BMS:

a. Central Suction Systems


b. Sump pumps and associated controls and alarm systems
c. Compressed air system/Medical gas systems
d. Kitchen hood Supply
e. Heating, ventilating, and air-conditioning (HVAC) systems for all types of Clean Rooms i.e. ICU,
Surgical Suites, Isolation Rooms,
CT Scanners, Proton Theraphy, Linear accelerator, UPS & Battery rooms, BMS rooms, Server rooms, etc.
A f. Closed loop water chilling equipment for linear accelerator, Proton Therapy, CT Scanners and other medical equipment.

Priority 3 - Equipment System necessary for Patient Care

1. Arrange the following equipment for delayed-automatic or manual connection to the alternate power source thru the BMS;

a. Heating equipment;
b. Equipment and control systems for elevators;
c. General supply, return, and exhaust ventilating systems serving common basement, toilets and stores;
d. Proton Therapy cooling system;
e. Automatically operated doors.
f. Minimal electrically heated autoclaving equipment shall be permitted to be arranged for either automatic or manual KEY PLAN
connection to the alternate source.

Priority 5 - Other Loads not included above

In case of one unit of genset as well as the standby genset break down the reverse sequence of operation will be observed i.e.
Priority 5 will be the first to be shed. 1 2 3 4
A
5 6 7 8

REVISION
NO. DESCRIPTION DATE

DAR PROJECT NUMBER

DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SYSTEMPOINT LIST,


A GEN. NOTES, & LEGEND

SHEET NO.
BMS SYSTEM POINT LIST, GEN. NOTES, & LEGEND
N.T.S
OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

NOTES:

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

3. FINAL LOCATION OF DDC & HLI


SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
FOR APPROVAL.

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

KEY PLAN
1 2 3 4

5 6 7 8

REVISION
NO. DESCRIPTION DATE

BMS SYSTEM POINT LIST FOR CSB (ADDITIONAL)


N.T.S

DAR PROJECT NUMBER

DB-12
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SYSTEM POINT LIST


FOR CSB (ADDITIONAL)

SHEET NO.
OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

NOTES:

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

3. FINAL LOCATION OF DDC & HLI


SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
FOR APPROVAL.

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

KEY PLAN

1 2 3 4

5 6 7 8

REVISION
NO. DESCRIPTION DATE

DAR PROJECT NUMBER

DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS CONTROL DIAGRAM

BMS CONTROL DIAGRAM SHEET NO.


N.T.S

M5.00.02
JF OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

TYPICAL
PARKING TYPICAL
SUPPLY PARKING EXHAUST/ NOTES:
FAN SMOKE FAN

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

3. FINAL LOCATION OF DDC & HLI


SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
FOR APPROVAL.

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

KEY PLAN

1 2 3 4

5 6 7 8

REVISION
NO. DESCRIPTION DATE

DAR PROJECT NUMBER

DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS CONTROL DIAGRAM

SHEET NO.

M5.00.03
OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

NOTES:

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

3. FINAL LOCATION OF DDC & HLI


SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
FOR APPROVAL.

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

KEY PLAN

1 2 3 4

5 6 7 8

REVISION
NO. DESCRIPTION DATE

DAR PROJECT NUMBER

DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS CONTROL DIAGRAM

SHEET NO.

M5.00.04
OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
PB PB
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI
235 E. MAIN STREET, SUITE 102C
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI NORTHVILLE, MI 48167, U.S.A.

PB PB CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
PB RIYADH 11411, SAUDI ARABIA
PB
VAV VAV VAV VAV
DDC DDC DDC DDC

PB
PB
VAV VAV VAV VAV
DDC DDC DDC DDC

PB
PB
VAV VAV VAV VAV
DDC DDC DDC DDC

PB PB
PB
VAV VAV VAV VAV
DDC DDC DDC DDC

RIYADH, SAUDI ARABIA


PB PB
PB
VAV VAV VAV VAV
DDC DDC DDC DDC

PB PB
PB PB
VAV VAV VAV VAV VAV VAV
DDC DDC DDC DDC DDC DDC

NOTES:

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01
PB PB
PB PB
VAV
DDC
VAV
DDC
VAV VAV VAV VAV
2. DDC & HLI QUANTITY
DDC DDC DDC DDC
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
PB PB
PB PB
VAV VAV VAV VAV VAV VAV VAV VAV
DDC DDC DDC DDC DDC DDC DDC DDC
3. FINAL LOCATION OF DDC & HLI
SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
PB
PB PB
PB PB
FOR APPROVAL.
VAV VAV VAV VAV VAV VAV VAV VAV
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI DDC DDC DDC DDC DDC DDC DDC DDC
HLI HLI HLI HLI

VAV VAV
DDC DDC
CAV VAV CAV CAV VAV CAV CAV CAV VAV CAV CAV
DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC

VAV VAV CAV CAV VAV CAV CAV


CAV CAV VAV VAV CAV CAV DDC DDC DDC DDC DDC DDC DDC
PB DDC DDC DDC DDC DDC DDC PB PB PB PB PB
CAV CAV VAV CAV CAV VAV VAV CAV CAV VAV VAV VAV VAV VAV VAV
HLI VAV CAV CAV VAV VAV CAV VAV VAV DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC
DDC DDC DDC DDC DDC DDC DDC DDC

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

VAV VAV
DDC DDC

HLI HLI HLI HLI

HLI HLI HLI HLI HLI HLI HLI


PB PB PB HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI PB HLI HLI HLI HLI HLI HLI HLI HLI HLI PB PB

HLI HLI HLI HLI HLI VAV VAV VAV VAV VAV VAV
DDC DDC DDC DDC HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI DDC DDC

PB

VAV VAV
DDC DDC

PB

VAV VAV
DDC DDC

KEY PLAN
PB PB

PB

VAV VAV
DDC DDC

PB

VAV VAV
DDC DDC

PB PB PB

VAV VAV VAV VAV


DDC DDC DDC DDC

PB PB PB

REVISION
NO. DESCRIPTION DATE

PB PB

PB PB

PB

PB

HLI

PB

HLI HLI

DAR PROJECT NUMBER

DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SINGLE LINE


DIAGRAM

SHEET NO.
BMS SINGLE LINE DIAGRAM
N.T.S

M5.00.05
OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA

PB

HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI

RIYADH, SAUDI ARABIA

PB

HLI

NOTES:

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

3. FINAL LOCATION OF DDC & HLI


SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
FOR APPROVAL.

HLI HLI HLI HLI

HLI HLI HLI HLI HLI HLI HLI


PB

HLI HLI HLI HLI HLI

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

KEY PLAN

PB

REVISION
NO. DESCRIPTION DATE

DAR PROJECT NUMBER

DB-09/10/11
HLI HKS PROJECT NUMBER

PB 14381.000
DATE
HLI HLI

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SINGLE LINE


DIAGRAM PART-1

SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-1
N.T.S

M5.00.06
PB PB
PB
VAV VAV VAV VAV
DDC DDC DDC DDC

OWNER
PB PB KINGDOM OF SAUDI ARABIA
PB MINISTRY OF HEALTH
VAV VAV VAV VAV KING FAHAD MEDICAL CITY
DDC DDC DDC DDC
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
PB PB
PB NORTHVILLE, MI 48167, U.S.A.
VAV VAV VAV VAV VAV VAV
DDC DDC DDC DDC DDC DDC CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA

PB PB
PB
VAV VAV VAV VAV VAV VAV
DDC DDC DDC DDC DDC DDC

VAV VAV
DDC DDC
CAV VAV CAV CAV VAV CAV CAV CAV VAV CAV CAV
DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC

VAV VAV CAV CAV VAV CAV CAV


CAV CAV VAV VAV CAV CAV DDC DDC DDC DDC DDC DDC DDC
DDC DDC DDC DDC DDC DDC PB PB PB
CAV CAV VAV CAV CAV VAV VAV CAV CAV VAV VAV VAV VAV RIYADH, SAUDI ARABIA
VAV CAV CAV VAV VAV CAV VAV VAV DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC DDC
DDC DDC DDC DDC DDC DDC DDC DDC

NOTES:

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

3. FINAL LOCATION OF DDC & HLI


SHOP DRAWING SHALL BE
VAV VAV SUBMITTED BY CONTRACTOR
DDC DDC
FOR APPROVAL.

PB PB HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI PB HLI HLI HLI HLI HLI HLI HLI HLI

VAV VAV VAV VAV


DDC DDC DDC DDC HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI

PB
REFERENCE DRAWINGS
VAV VAV
DDC DDC
DESCRIPTION DWG. NOS

PB

VAV VAV
DDC DDC

PB

PB

VAV
DDC

KEY PLAN
PB

VAV
DDC

PB

VAV
DDC

PB PB

REVISION
NO. DESCRIPTION DATE

PB

PB

PB

DAR PROJECT NUMBER

PB DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SINGLE LINE


DIAGRAM PART-2

SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-2
N.T.S

M5.00.07
OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
PB

HLI HLI HLI HLI HLI HLI HLI


RIYADH, SAUDI ARABIA

HLI HLI HLI HLI HLI HLI HLI

PB
NOTES:

1. FOR GENERAL NOTES REFER


TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
PB
3. FINAL LOCATION OF DDC & HLI
VAV VAV SHOP DRAWING SHALL BE
DDC DDC SUBMITTED BY CONTRACTOR
FOR APPROVAL.

PB

VAV VAV
DDC DDC

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

PB

VAV VAV
DDC DDC

PB PB

VAV VAV
DDC DDC

KEY PLAN

PB PB

VAV VAV
DDC DDC

REVISION
PB PB NO. DESCRIPTION DATE

PB
VAV VAV VAV VAV
DDC DDC DDC DDC

DAR PROJECT NUMBER


PB PB
DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SINGLE LINE


DIAGRAM PART-3

SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-3
N.T.S

M5.00.08
DDC DDC DDC

PB PB OWNER
KINGDOM OF SAUDI ARABIA
VAV VAV VAV
DDC DDC DDC MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
PB PB PB DAR ENGINEERING
VAV VAV VAV P.O. BOX 301
DDC DDC DDC
RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

VAV VAV
DDC DDC

NOTES:
HLI HLI HLI HLI PB HLI HLI HLI HLI HLI HLI HLI HLI HLI PB PB 1. FOR GENERAL NOTES REFER
TO DWG. # M5.00.01
VAV VAV
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI DDC DDC

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

3. FINAL LOCATION OF DDC & HLI


SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
FOR APPROVAL.

PB

REFERENCE DRAWINGS

DESCRIPTION DWG. NOS

VAV VAV
DDC DDC

VAV VAV
DDC DDC

PB PB

VAV VAV VAV VAV


DDC DDC DDC DDC

KEY PLAN

PB

PB

REVISION
NO. DESCRIPTION DATE

DAR PROJECT NUMBER

DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SINGLE LINE


DIAGRAM PART-4

SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-4
N.T.S

M5.00.09
PB
OWNER
KINGDOM OF SAUDI ARABIA
MINISTRY OF HEALTH
KING FAHAD MEDICAL CITY
P.O. BOX 59046
RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT
HKS ARCHITECTS, PC.
HLI HLI HLI HLI HLI HLI HLI 235 E. MAIN STREET, SUITE 102C
NORTHVILLE, MI 48167, U.S.A.

HLI HLI HLI HLI HLI HLI HLI


CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
DAR ENGINEERING
P.O. BOX 301
PB RIYADH 11411, SAUDI ARABIA

PB
VAV VAV
DDC DDC

RIYADH, SAUDI ARABIA

PB
VAV VAV
DDC DDC

NOTES:
PB
1. FOR GENERAL NOTES REFER
VAV VAV
DDC DDC TO DWG. # M5.00.01

2. DDC & HLI QUANTITY


INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.

PB
3. FINAL LOCATION OF DDC & HLI
VAV VAV
DDC DDC SHOP DRAWING SHALL BE
SUBMITTED BY CONTRACTOR
FOR APPROVAL.

PB
VAV VAV
DDC DDC

PB REFERENCE DRAWINGS
VAV VAV
DDC DDC DESCRIPTION DWG. NOS

PB
VAV VAV
DDC DDC

KEY PLAN

PB
VAV VAV
DDC DDC

PB
VAV VAV
DDC DDC

REVISION
NO. DESCRIPTION DATE

PB PB
VAV VAV
DDC DDC

DAR PROJECT NUMBER

DB-09/10/11
HKS PROJECT NUMBER

14381.000
DATE

15 APRIL, 2012
ISSUE

TENDER ISSUE
SHEET TITLE

BMS SINGLE LINE


DIAGRAM

SHEET NO.
BMS SINGLE LINE DIAGRAM
N.T.S

M5.00.10

You might also like