INSULATION RESISTANCE TEST REPORT FOR DOCUMENT NUMBERING:
CONTROL CABLES
Project: Aqaba Screening Project task 5 of APC storing Contractor: Negemco
Employer: Arab Potash Company (APC)
EQUIPMENT NO:
SYSTEM/SUBSYSTEM No:
DESCRIPTION:
REPORT No:
INSULATION TEST
CABLE IDENTIFICATION (TAG): CABLE TYPE (cores/mm2):
TEST VOLTAGE: ____________________________VDC
ACCEPTANCE TEST VALUE: > _________________________________ Mega ohms
Duration: 1 min
Conduct test with instruments disconnected Do not test coaxial / telecom cables
Insulation Test on Armour Vs Overall Shield (Ω):
NOTE: ORIGIN and DESTINATION conductor CONNECTIONS must be checked according to WIRING DIAGRAM
INSULATION RESISTANCE (OHMS)
CONTINUITY &
NUMBER ORIGIN DESTINATION CONNECTION
CONDUCTOR TO RACEWAY, CONDUCTOR TO CHECKING
CONDUCTOR TO SHIELD
ARMOUR OR EARTH CONDUCTORS
TEST EQUIPMENT:
EQUIPMENT NAME, MANUFACTURER
AND MODEL:
SERIAL NUMBER:
CAL. CERTIFICATE NUMBER.:
CALIBRATION DATE
(FROM-TO):
REMARKS:
WITNESSED/REVIEWED BY: CONTRACTOR (NEGMCO) ENGINEER (DAR) APC (IF Required)
SIGNATURE:
PRINT NAME:
DATE: