INTERIOR DESIGN DEPARTMENT
MATERIAL REFERENCE
TWINLAKES VINEYARD MANOR
FUNCTION HALL
MARCH 14, 2019
INTERIOR DESIGN DEPARTMENT SCHEDULE
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14, 2019
LOCATION: NASUGBU, BATANGAS AREA: FUNCTION HALL
Item No. Description Quantity Unit
SP-01 POLISHED CONCRETE REFER TO THE SQ.M
PLAN
SP-02 FAUX BRICKS - SQ.M
SP-03 WALL PAPER - SQ.M
PT-01 -WALL PAINT FINISH IN SEMI GLOSS - SQ.M
COLOR: CLIFFSWALLOW 0131
PT-02 -WALL PAINT FINISH IN SEMI GLOSS - SQ.M
COLOR: HIDEAWAY 0137
PT-03 -WALL PAINT FINISH IN SEMI GLOSS - SQ.M
COLOR: COCONUT MACAROON 0138
WD-01 -LAMINATE FINISH - SQ.M
COLOR: C094G WHITE
WD-02 -SOLID WOOD - SQ.M
TL-01 -200MM X 200MM - SQ.M
MOROCCAN TILES
TL-02 -900MM X 150MM WOOD TILE
14/F Alliance Global Tower 4, Taguig City | Tel No. : 328.43.74 | [Link]
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14, 2019
LOCATION: NASUGBU, BATANGAS AREA: FUNCTION HALL
SP-01 SP-02 SP-03 WALLPAPER @
POLISHED CONCRETE FAUX BRICKS @ WALLS COLUMNS
@FLOOR
PT-01 PT-02 PT-03
PAINT FINISH @ CEILING PAINT FINISH @ DROP PAINT FINISH @ WALL
CEILING
WD-01 WOOD STAIN @CEILING WD-01 TL-01
SOLID WOOD @ BASEBOARD CERAMIC TILE:GRAND BLUE
TL-02
WOOD TILES
14/F Alliance Global Tower 4, Taguig City | Tel No. : 328.43.74 | [Link]
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14, 2019
LOCATION: NASUGBU, BATANGAS AREA: FUNCTION HALL
SPECIAL FINISH
SP-01 Manufacturer: 1. Name: POLISHED CONCRETE
Special Finish@FLOOR 2. Finish: SEMI GLOSS
& WALLS Source: 3. Finish: Semi-Gloss - 50%,
Requirement as indicated on
LOCAL SOURCE Designer documentation package
and FF&E specifications.
4. Color: GRAY
5. Finish must be impervious to chips
& scratches. Substrate to be
pre-stained/aniline finish.
6. All materials used must be
suitable for use in tropical and
high humidity areas.
7. Submit 30cm (12") x 30cm (12")
minimum strike-off for approval
to Designer prior to shipment.
SP-02 Manufacturer: 1. Name: ANTIQUE BRICKS
Special Finish@WALL 2. Finish: Textured
Source: 3. Finish: (A) Matt - 50%, Requirement
as indicated on Designer
MILESTONE ENTERPRISES documentation package and FF&E
1078 EDSA, Balintawak, specifications.
Quezon City, PHILIPPINES 4. Color:
(0632) 454-3201/(0632) 5. Finish must be impervious to chips
362-6143 & scratches. Substrate to be
(0632) 413-3812/(0632) pre-stained/aniline finish.
456-1163 6. All materials used must be
suitable for use in tropical and
high humidity areas.
7. Submit 30cm (12") x 30cm (12")
minimum strike-off for approval
to Designer prior to shipment.
SP-03 Manufacturer: 1. Name: ANTIQUE BRICKS
Special Finish@ 2. Finish: Textured
COLUMNS Source: 3. Finish: (A) Matt - 50%, Requirement
as indicated on Designer
MILESTONE ENTERPRISES documentation package and FF&E
1078 EDSA, Balintawak, specifications.
Quezon City, PHILIPPINES 4. Color:
(0632) 454-3201/(0632) 5. Finish must be impervious to chips
362-6143 & scratches. Substrate to be
(0632) 413-3812/(0632) pre-stained/aniline finish.
456-1163 6. All materials used must be
suitable for use in tropical and
high humidity areas.
7. Submit 30cm (12") x 30cm (12")
minimum strike-off for approval
to Designer prior to shipment.
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14, 2019
LOCATION: NASUGBU, BATANGAS AREA: FUNCTION HALL
PAINT
PT-01 Manufacturer: 1. COLOR: CLIFFSWALLOW
Paint @ CEILING CODE:0131
Source: 1. Finish: MATTE
2. Finish: (A) Matt - 70%, (B) Semi-
Pacific Paint (Boysen) Gloss - 10%, (C) High Gloss - 20%.
Philippines, Inc. Requirement as indicated on
Marketing & Technical Designer documentation package
Service: 292 D. and FF&E specifications.
Tuazon Street, Quezon
City,
Philippines 1115
Tel. Nos. (632) 366-3962;
363-9738; 3309662;
367-8880
Fax Nos. (632) 367-8878
PT-02 Manufacturer: 1. COLOR: HIDEAWAY
Paint @ DROP CODE:0137
CEING(BEAM) Source: 1. Finish: MATTE
2. Finish: (A) Matt - 70%, (B) Semi-
Pacific Paint (Boysen) Gloss - 10%, (C) High Gloss - 20%.
Philippines, Inc. Requirement as indicated on
Marketing & Technical Designer documentation package
Service: 292 D. and FF&E specifications.
Tuazon Street, Quezon
City,
Philippines 1115
Tel. Nos. (632) 366-3962;
363-9738; 3309662;
367-8880
Fax Nos. (632) 367-8878
PT-03 Manufacturer: 1. COLOR: COCONUT MACAROON
Paint @ WALL CODE:0138
Source: 1. Finish: MATTE
2. Finish: (A) Matt - 70%, (B) Semi-
Pacific Paint (Boysen) Gloss - 10%, (C) High Gloss - 20%.
Philippines, Inc. Requirement as indicated on
Marketing & Technical Designer documentation package
Service: 292 D. and FF&E specifications.
Tuazon Street, Quezon
City,
Philippines 1115
Tel. Nos. (632) 366-3962;
363-9738; 3309662;
367-8880
Fax Nos. (632) 367-8878
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14, 2019
LOCATION: NASUGBU, BATANGAS AREA: FUNCTION HALL
WOOD
WD-01 Manufacturer: 1. Name: WOOD STAIN – TO MATCHED
Wood Finish @ CEILING 2. Species:
Source: 3. Cut: Crown Cut, Quarter-Cut, Straight
Quarter-Cut, Flat-Cut, Burl, Crotch,
Figured.
AVANTI PHIL. FURNITURE 4. Finish: Semi Gloss, Textured
INC. 5. Finish: (A) Matt - 30%, (B) Semi-Gloss -
S.E. Jaime St. Paknaan, 50%, (C) Gloss - 70% & (D) High Gloss -
Mandaue City 6014 100%. All FF&E Timber to be finished as
Cebu, Philippines, S noted on individual specification
Jayme St, Mandaue, sheets. Locations as indicated on
Designer documentation package and
Lalawigan ng Cebu FF&E specifications.
6. Quantity: To be verified by general
contractor.
7. All materials shall be of first
quality, free of manufacturer's
defects and shall comply with all
state and local codes and
standards.
8. Construction shall be of highest
quality and suitable for hospitality
use.
9. Submit 20x20cm sample to Designer
for approval prior to production.
10. Refer to actual sample on Designer
control board for colour matching
purposes.
11. Any custom designed materials should
be coordinated and confirmed by
Designer prior to fabrication by the
contractor.
WD-02 Manufacturer: 1. Name: SILVER WOOD STAIN
Wood Finish @ 2. Species:SILVER WOOD STAIN
BASEBOARD Source: 3. Cut: Crown Cut, Quarter-Cut, Straight
Quarter-Cut, Flat-Cut, Burl, Crotch,
Figured.
AVANTI PHIL. FURNITURE 4. Finish: Semi Gloss, Textured
INC. 5. Finish: (A) Matt - 30%, (B) Semi-Gloss -
S.E. Jaime St. Paknaan, 50%, (C) Gloss - 70% & (D) High Gloss -
Mandaue City 6014 100%. All FF&E Timber to be finished as
Cebu, Philippines, S noted on individual specification
Jayme St, Mandaue, sheets. Locations as indicated on
Designer documentation package and
Lalawigan ng Cebu FF&E specifications.
6. Quantity: To be verified by general
contractor.
7. All materials shall be of first
quality, free of manufacturer's
defects and shall comply with all
state and local codes and
standards.
8. Construction shall be of highest
quality and suitable for hospitality
use.
9. Submit 20x20cm sample to Designer
for approval prior to production.
10. Refer to actual sample on Designer
control board for colour matching
purposes.
11. Any custom designed materials should
be coordinated and confirmed by
Designer prior to fabrication by the
contractor.
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14, 2019
LOCATION: NASUGBU, BATANGAS AREA: FUNCTION HALL
CERAMIC TILE
tl-01 Manufacturer: 1. Description: Ceramic Tile @
Ceramic Tile @ Floor FUNCTION HALL
Source: 2. Type: grand blue zone.
3. Finish: As per submitted sample.
GUSTOFIL CONSTRUCTION & 4. Size: 200mm X 200mm.
INTERIOR SUPPLIES 5. Color: As per submitted sample.
COMPANY 6. Grout Color: To match CT-01 Tile
Color & to be approved by
PB-G015 CW Home Designer.
Depot Complex No. 1 7. Submit specified size tile sample
Julia Vargas Ave., for approval to Designer prior
Brgy. Ugong, Pasig to shipment.
City 8. Slip Resistance: Tile floor
(+632) 425-2913 surface must meet static
+63956 792 9828 coefficient of friction of 0.6 for
level floor and 0.80 for ramp.
Tl-02 Manufacturer: 1. Description: Ceramic Tile @
Ceramic Tile @ Floor FUNCTION HALL
Source: 2. Type: ALCALAGRES MADERAS
ROBLES CLARO
WILCON HOME DEPOT 3. Finish: As per submitted sample.
4. Size: 150mm X 900mm.
#8003 REAL ST. 5. Color: As per submitted sample.
ALABANG ZAPOTE RD., 6. Grout Color: To match CT-01 Tile
ALAMANZA I, LAS PINAS Color & to be approved by
CITY Designer.
7. Submit specified size tile sample
for approval to Designer prior
to shipment.
8. Slip Resistance: Tile floor
surface must meet static
coefficient of friction of 0.6 for
level floor and 0.80 for ramp.
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
LIGHTING SPECIFICATION
SCHEDULE
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14,2019
LOCATION: NASUGBU , BATANGAS AREA: GYM
Item No. Description Quantity Unit
Il-200 RECESSED DOWNLIGHT- 9W REFER TO pcs
WARM WHITE PLANS
SW-200 3 GANG 1 WAY SWITCH REFER TO pcs
PLANS
IL-201 LED STRIP LIGHTS REFER TO pcs
PLANS
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14,2019
LOCATION: NASUGBU , BATANGAS AREA: FUNCTION HALL
BRAND: FIREFLY electric & lighting corp. Provide Actual Sample
SUPPLIER: Firefly Electric & Lighting Corp. Strike-Off
Telephone : +63 2 789 1000
E-mail: info@[Link] Cutting
Technical Specification
MODEL/ DESIGN: LED RECESSED DOWNLIGHT – 9 WATTS Prototype
FINISH: WARM WHITE W/ BLACK HOUSING Seaming Diagram
OVERALL SIZE: 5.5” CAD Drawing
OR APPROVED EQUIVALENT
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14,2019
LOCATION: NASUGBU , BATANGAS AREA: FUNCTION HALL
BRAND: PHILIPS Provide Actual Sample
SUPPLIER: LYNX LIGHTS ENTERPRISES Strike-Off
Tel. No. (+632) 267 5160 / 586 8763
Mobile: (+63925) 837 9526 / (+63917) 837 9525 Cutting
Email: sales@[Link]
lynxlights@[Link] Technical Specification
MODEL/ DESIGN: 3 GANG 1 WAY SWITCH(WIDE SERIES) Prototype
FINISH: Seaming Diagram
OVERALL SIZE: CAD Drawing
OR APPROVED EQUIVALENT
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
PROJECT: TWINLAKES VINEYARD MANOR ISSUE DATE: MARCH 14,2019
LOCATION: NASUGBU , BATANGAS AREA: FUNCTION HALL
FIREFLY electric & lighting corp. Provide Actual Sample
BRAND:
SUPPLIER: Firefly Electric & Lighting Corp. Strike-Off
Telephone : +63 2 789 1000
E-mail: info@[Link] Cutting
Technical Specification
MODEL/ DESIGN: 14.4 mini flat led strip light Prototype
FINISH: Warm white Seaming Diagram
OVERALL SIZE: CAD Drawing
OR APPROVED EQUIVALENT
5/F Tower F, Renaissance Tower Meralco Ave., Pasig City | Tel No. : 576-3376 | [Link]
POWER AND AUXILIARY SPECIFICATION
i. POWER & AUXILIARY SCHEDULE
ii. POWER & AUXILIARY FIXTURE
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR DATE: MARCH 14,2019
AREA: FUNCTION HALL REVISION NO: ALL AREAS
ELECTRICAL
POWER SCHEDULE
& AUXILIARYSCHEDULE
BRAND: Provide Actual Sample
CODE DESCRIPTION QTY. UNIT
SUPPLIER: Strike-Off
2 gang universal outlet with ground Refer
Cuttingto
EL-200 pc
A3001+3031v500mk plan
Technical Specification
Refer to
EL-201
MODEL/ DESIGN: EMERGENCY OUTLET SINGLE Prototype pc
plan
Seaming Diagram
FINISH: Refer to
EL-202 FCU OUTLET pc
OVERALL SIZE: plan
CAD Drawing
14/F Alliance Global Tower, 11th Ave. Cor 36th St., Bonifacio Global City, Uptown Taguig | Tel no.: 328-4374 | [Link]
ELECTRICAL FIXTURE
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR DATE: MARCH 14,2019
AREA: FUNCTION HALL REVISION NO:
POWER & AUXILIARYSCHEDULE
BRAND: Schneider electric Philippines Provide Actual Sample
SUPPLIER: Schneider electric Philippines Strike-Off
Telephone +63 (0) 2 976 9999
Email : [Link]@schneider- Cutting
[Link]
Technical Specification
MODEL/ DESIGN: 2 gang SINGLE universal outlet with ground Prototype
A3001+3031v500mk
FINISH: OFF WHITE Seaming Diagram
OVERALL SIZE: CAD Drawing
EL-200
OR APPROVED EQUIVALENT
14/F Alliance Global Tower, 11th Ave. Cor 36th St., Bonifacio Global City, Uptown Taguig | Tel no.: 328-4374 | [Link]
ELECTRICAL FIXTURE
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR DATE: MARCH 14,2019
AREA: FUNCTION HALL REVISION NO:
POWER & AUXILIARYSCHEDULE
BRAND: PANASONIC Provide Actual Sample
SUPPLIER: PANASONIC PHILIPPINES Strike-Off
548, Unit C Facilities Building, Shaw
Boulevard, Mandaluyong, 1550 Metro Cutting
Manila
Technical Specification
MODEL/ DESIGN: 1 gang SINGLE universal outlet Prototype
FINISH: OFF WHITE Seaming Diagram
OVERALL SIZE: CAD Drawing
EL-201
OR APPROVED EQUIVALENT
14/F Alliance Global Tower, 11th Ave. Cor 36th St., Bonifacio Global City, Uptown Taguig | Tel no.: 328-4374 | [Link]
ELECTRICAL FIXTURE
INTERIOR DESIGN DEPARTMENT
PROJECT: TWINLAKES VINEYARD MANOR DATE: MARCH 14,2019
AREA: FUNCTION HALL REVISION NO:
POWER & AUXILIARYSCHEDULE
BRAND: FIREFLY ELECTRIC AND LIGHTING Provide Actual Sample
COMPANY
SUPPLIER: Firefly Electric & Lighting Corp. Strike-Off
Telephone : +63 2 789 1000
Cutting
E-mail: info@[Link]
Technical Specification
MODEL/ DESIGN: 1 Gang Aircon Outlet Set Prototype
FINISH: OFF WHITE Seaming Diagram
OVERALL SIZE: CAD Drawing
EL-202
OR APPROVED EQUIVALENT
14/F Alliance Global Tower, 11th Ave. Cor 36th St., Bonifacio Global City, Uptown Taguig | Tel no.: 328-4374 | [Link]