0% found this document useful (0 votes)
588 views4 pages

Mixing Ballasting Operation

Uploaded by

Fortnite
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
588 views4 pages

Mixing Ballasting Operation

Uploaded by

Fortnite
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
ECS MANUAL Operation, Maintenance & Safety Manual 42.6.2 Preparation 1. If an alarm(Low salinity) occurs in freshwater zone, please operate according to the below procedure. 2. Fill sea water(4~5% of total ballast volume) into Sea Water Holding Tank(APT or WBT) before sailing the fresh water zone. The amount of sea water for mixing ballasting operation is subject to be changed depending on the salinity of the area where the sea water is pumped in to sea water holding tank. Salinity Ratio between Fresh water and Marine water of Marine Water (Psu) Fresh water” (96) Marine Water (%) 30 95.00 5.00 31 95.16 4.84 32 95.31 469 33 95.45 455 34 95.59 441 347 95.70 430 35 95.71 429 36 95.83 4l7 37 95.95 4.05 1) Salinity of fresh water 0PSU 3. Open the valve installed before Sea Water Holding Tank (APT or WBT) to be use. 4. Check the status of related pumps and valves 5. Automatic Flow Control Valve functions throttling flow rate based on the measured Salinity of mixed water(Target 1.5 PSU). Check "Measured value of CSU" on HMI screen, A BES OTN Ke OMA AOR Gece LUN S) Caution 68 51-Q-19-09 TECHCROSS INC. Version.8200323, ECS MANUAL Operation, Maintenance & Safety Manual * CAUTION! Make sure that ll the valves on pipelines for operation mode are open, Step 1: Click “OP MODE" on HMI MAIN screen. Step 2: Click” "BALLAST" in "SELECT OPERATION MODE". HM! operating requirements will be cisplayed in Required Signal eeu 1. Close drain valve(s) connected to ECU. 2. Open inlet and outlet valves of the cooling water. 3. Open manual valve of TSU sampling line. 4, Start LT(Low Temperature) cooling pump for cooling water. 5. Operate the ballast pump. /\ Alarm is activated, if ECS is not running within 5 minutes of ballast pump operation. Caution 9-09 ECHCROSS INC ECS MANUAL Operation, Maintenance & Safety Manual Step 3: Ship's Valve and Pump Signal will be displayed in Ship's Signal. Match Ship's Signal (ship's conditions) with Required Signal. if these two requirements match, "RUN" button will be activated 42.63 Operation Step 1: Select appropriate operation mode after checking related pumps and valves. Check mode display to see if all the operation requirements are futfilled. Click "RUN" button on HMI Screen to start ECS. Leet oy etd RRs acs 70 51-Q-19-09 IECHCROSS INC, Version.8200323, ECS MANUAL Operation, Maintenance & Safety Manual Step 3: Ensure that ECU value and TRO value are displayed in 5 minutes after starting ECS Step 4: Click "STOP" and Ensure that message says, ‘Do you want to stop the ECS?" x Ad 2) i cies ed Reset Step 5: Click "YES" button, Stop ballast pump after stopping ECS operation 9-09 ECHCROSS INC