Appendix – 6
Plumbing System (PHE) Specification
Client - DCHI
Stage - RIBA - 4
Project Code - 60592749
Prepared By – AECOM India Pvt Ltd.
Date: 22nd April 2020
<
Appendix – 6: Tender Specification Plumbing System
9. Submersible Drainage Non-Clog Pumps
These shall be fully submersible with a fully submersible motor. The pumps shall be provided with an
automatic level controller and all interconnecting power and control cabling which shall cause the
pumps to operate when the water level in the sump rises to a pre-set level and stop when the pre-
set low level is reached. The Pumps shall be capable of handling 15 mm solid particles. Each pump
shall be provided with in built liquid level controller for operating the pump between predetermined
levels. The pumping set shall be for stationary application and shall be provided with pump connector
unit. The delivery pipe shall be joined to the pump through a rubber diaphragm, and bend and guide
pipe for easy installation. Pump shall be provided with all accessories and devices necessary and
required for the pump to make it a complete working system. Sump pump shall be complete with
level controllers, control and power cabling up to motor and controller/probes etc. (Including
earthling). Level control shall be such that one pump starts on required level, 2nd pump cuts in at
high level and alarms is given at extra high level. All level controllers shall be provided with remote
level indications. Sump pumps shall have their dedicated panels, with BMS compatibility and shall be
operational with locally installed level controllers/Level Switches.
10. Connections to RCC Water Tanks
The General Contractor shall provide all inlets, outlets, washouts, vents, ball cocks, overflows control
valves and all such other piping connections including level indicator to water storage tanks as called
for. All pipes crossing through RCC work shall have puddle flanges fabricated from MS/GI pipes of
required size and length and welded to 6/8 mm thick MS plate. All puddle flanges must be fixed in
true alignment and level to ensure further connection in proper order. Full way gate valves of a
approved make shall be provided as near the tank as practicable on every outlet pipe from the storage
tank except the overflow pipe. Overflow and vent pipes shall terminate with mosquito proof grating.
The overflow pipe shall be so placed to allow the discharge of water being readily seen. The overflow
pipe shall be of size as indicated. A stop valve shall also be provided in the inlet water connection to
the tank. The outlet pipes shall be fixed approximately 75mm above the bottom of the tank towards
which the floor of the tank is sloping to enable the tank to be emptied for cleaning. The floor and the
walls of the tank shall be tiled with glazed tiles up to the overflow level. Alternatively, food grade
epoxy to be applied.
Tiling of Walls
The floor and the walls of the tanks shall be tiled with glazed tiles up to the overflow level.
Alternatively food grade epoxy to be applied to the floor and the walls of the tanks.
11. UV Unit / System
UV system for disinfection shall utilize high purity quartz sleeves and high output UV lamps. UV
Reactor MOC will be SS316L. System shall be designed to provide a UV dose of 600 J/m2 at UVT of
65% and TSS less than 10 mg/L. System should deliver a 4 log reduction of coliforms and provide TC
count to less than 200 CFU/100ml. The electrical control system should utilize high frequency
electronic ballasts and provide efficiency of more than 90%. The reactor vessel shall utilize internal
baffles to ensure turbulent and plug flow. The UV intensity monitoring system shall be designed in
accordance with the German DUGW W294 standard. The sensor shall be of dry type and removable
without system shutdown. The tertiary treatment plant shall comprise of the pressure sand filters
and activated carbon filters. This shall be sized to accommodate 100% of the effluent discharge flow
rate and shall achieve the performance as outlined and described in Design Criteria. Details of the
equipment layout proposal shall be submitted for review by the Project Manager with tender
documents.
Prepared for: DCHI AECOM
B301 Navi Mumbai, Maharashtra Page 63
Appendix – 6: Tender Specification Plumbing System
Item Description Unit Qty.
No.
G.. MISCELLANEOUS ITEMS
1 Providing and fixing 25mm thick C.I. heavy duty
grating fixed with C.I. angle iron frame of following
sizes:
1.1 300 mm wide x 600 mm long Lot
2 Providing and fixing 600 mm long MS hot dip
galvanized PUDDLE FLANGES fabricated out of 6 mm
thick MS plates of suitable size and IS:1239 heavy
class pipes properly fixed in walls & top slab of tanks.
The entire fittings shall be hot dipped galvanized
after fabrication. Length shall be minimum 600 mm
or wall thickness plus 200 mm on either side
(whichever is more).
2.1 25 mm dia (screwed ends) No.
2.2 40 mm dia (screwed ends) No.
2.3 50 mm dia (flanged ends) No.
2.4 65 mm dia (flanged ends) No.
2.5 80 mm dia (flanged ends) No.
2.6 100 mm dia (flanged ends) No.
2.7 150 mm dia (flanged ends) No.
2.8 200 mm dia (flanged ends) No.
2.9 250 mm dia (flanged ends) No.
2.10 300 mm dia (flanged ends) No.
2.11 500 mm dia (flanged ends) No.
** Since the RCC retaining wall work of the plant room
is completely done at site, General Contractor shall
ensure that the quoted rates are inclusive of
providing and installing puddle flange in existing
retaining wall as required including water proofing
and making good.
3 Providing and fixing electronic type level indicator No.
for water tanks mounting in panel with the following
features, level display, alarm when water level is low
or high, full range from one level to four level display
and manual reset for Alarm etc. with electrical wiring
Prepared for: DCHI AECOM
B301 Navi Mumbai, Maharashtra Page 149