STRESSING REPORT Page 1 of 2
Project Name: Job No.
Contractor: Stressing Sub-Contractor:
Tendon Location: Tendon Number:
Tendon Size: PT Steel Supplier:
Assumed for Calculations Actual Values Delivered per Pack or Reel of Strand
Strand from Reel No.
Number of Strands, Ns: Number of Strand per Reel, Nr:
Assumed Strand Area, As: Actual Area of Strands per Reel, Ar:
Assumed Modulus, Es Actual Modulus per Reel, Er:
Product, Ns*As*Es= Product, Nr*Ar*Er=
Sum of Product, Sum (Nr*Ar*Er)=
Adjusted Elongation Expected = [Nr*Ar*Er / Sum (Nr*Ar*Er)]
First Stage of Stressing from End A First Stage of Stressing from End B
Jack Force (KN) Gauge (Kpa) Jack Force (KN) Gauge (Kpa)
Required Force before wedge set: Required Force before wedge set:
Theoretical Elongation, ΔA(mm) = Theo ΔA+ΔB = Theoretical Elongation, ΔB(mm) =
Actual Elongation, ΔA(mm) = Adj. ΔA+ΔB = Actual Elongation, ΔB(mm) =
Expected Wedge Set, End A, Wa: Expected Wedge Set, EndB, Wb:
Jack Gauge Jack Gauge
Equipment Identifiers End A: Equipment Identifiers End B:
Stressing Mode:
One End Only: Both A & B: Both Simultaneous (A and B with 2 sets of equipment):
Target Gauge Pressures and Elongations
End A
Pressure Elongation Wedge Set Pressure Elongation Wedge Set
per increment per increment
Elongation before set at A = ΔA = (Sum) = Elongation before set at B = ΔB = (Sum) =
Net Elongation after wedge set at A = Net Elongation after wedge set at B =
Overall Anticipated elongation=
STRESSING REPORT Page 1 of 2
Project Name: Job No.
Contractor: Stressing Sub-Contractor:
Tendon Location: Tendon Number:
Tendon Size: PT Steel Supplier:
Assumed for Calculations Actual Values Delivered per Pack or Reel of Strand
Strand from Reel No.
Number of Strands, Ns: Number of Strand per Reel, Nr:
Assumed Strand Area, As: Actual Area of Strands per Reel, Ar:
Assumed Modulus, Es Actual Modulus per Reel, Er:
Product, Ns*As*Es= Product, Nr*Ar*Er=
Sum of Product, Sum (Nr*Ar*Er)=
Adjusted Elongation Expected = [Nr*Ar*Er / Sum (Nr*Ar*Er)]
First Stage of Stressing from End A First Stage of Stressing from End B
Jack Force (KN) Gauge (Kpa) Jack Force (KN) Gauge (Kpa)
Required Force before wedge set: Required Force before wedge set:
Theoretical Elongation, ΔA(mm) = Theo ΔA+ΔB = Theoretical Elongation, ΔB(mm) =
Adjusted Elongation, ΔA(mm) = Adj. ΔA+ΔB = Adjusted Elongation, ΔB(mm) =
Expected Wedge Set, End A, Wa: Expected Wedge Set, EndB, Wb:
Jack Gauge Jack Gauge
Equipment Identifiers End A: Equipment Identifiers End B:
Stressing Mode:
One End Only: Both A & B: Both Simultaneous (A and B with 2 sets of equipment):
Target Gauge Pressures and Elongations
End A
Pressure Elongation Wedge Set Pressure Elongation Wedge Set
per increment per increment
1
2
3
4
5
Elongation before set at A = ΔA = (Sum) = Elongation before set at B = ΔB = (Sum) =
Net Elongation after wedge set at A = Net Elongation after wedge set at B =
Overall Anticipated elongation=
STRESSING REPORT Page 2 of 2
Elongation Measurement:
End A End B
First Stage Pressure Elongation Wedge Set Pressure Elongation Wedge Set Increment Elong Average
Stressing at A, Wa at B, WB per 20% of Load per 20%
Initial 20%
40%
60%
I
80% I
I
Final 100% at A V
I
Second Stage of Stressing I
Pick-up at B I
V
Final 100% at B I
I
I
Elongation at A from 20 to 100%= V
Add for Initial 20% Load= <--------------------- <--------------------- <--------------------- <--------------------- <--------------------- <----------
Elongation at A before set=
Total Elongation before set=
Total wedge set=
Deduct elongation insde jack=
Final Elongation=
Expected Elongation= Ratio of (Final/ Expected) = % under or over = < 7% O.K.
(AASHTO LRFD
Approved: Not Approved: Construction or
Project Specs.)
Observations: No popping noises of broken wires O.K. Over elongation is within tolerance, O.K.
Signed- Stressing Forman: Date:
Signed - Inspector: Date: