Ranney Collector Well Introduction
Matthew Reed
Layne Christensen Company
Ranney Collector Wells
Collector Well Introduction
2
Ranney Collector Wells
• Geologists & Hydrogeologists (5)
• Engineers (1)
• Project Managers (2)
• Operations Manager (1)
• Equipment & Personnel
Managers (2)
• Mechanics & Fabricators (2)
• Specialty Construction
Superintendents & Crews (30)
As a group, responsible for collector well and caisson based surface
water intake construction throughout US and overseas (recent work
in Canada, Mexico, Republic of China, South Korea).
Based in Columbus, Ohio.
3
Lateral Design
• Screen Strength (specially
designed for stress of
installation)
• Slot Size (retain 30 to 50
percent of formation)
• Gravel Pack Requirements
(fine grained, uniform)
• Approach Velocity (< sqrt K /
220)
• Entrance Velocity (<1 ft/min)
• In-Line Velocity (< 1 ft/sec)
Design Considerations - Gravel Packing
Pre-Packed Wire-
wrapped Stainless Steel
• 20 to 55 % open area
• Inert Pack (Carbolite or
Glass Beads)
Allows finer grained
aquifers to be screened
5
Below Grade Construction Overview
6
Below Grade Plan & Section
7
Caisson Construction
8
Caisson Construction - Overview
9
Caisson Structural Details
10
Caisson Construction – Cutting Shoe
11
Caisson Construction - First Lift & Deadman
12
Caisson Construction – Lateral Port Assemblies
13
Caisson Construction
Pull Down While
Excavating -
Increases speed &
improves plumbness
14
Pour Bottom Plug
15
Lateral Installation
16
17
Lateral Installation - Overview
18
Jacking Equipment
19
Digging Head & Projection Pipe
20
Digging Head
• Designed for specific
formation
• Air/Wash and sand
lines
• Sand line for spoils
removal
• Detachable head
21
Projection Pipe Advancement
22
Lateral Screen Design
• Collect Samples
• Sieve Analysis
• Change design
with changes in
geology
23
Sieve Analysis
24
Sieve Analysis
Sieve Analyses-Collector Well
South Adams County Water and Sanitation District
Well 119
Lateral C
Grain Size, inches
0,00 0,01 0,02 0,03 0,04 0,05 0,06 0,07 0,08 0,09 0,10 0,11 0,12 0,13 0,14 0,15 0,16 0,17 0,18 0,19 0,20
0,0
10,0
Lat C-50 ft
20,0
Lat C-55 ft
30,0
Percent Passing
Lat C-60 ft
40,0
Lat C-65 ft
50,0 Minimum
Lat C-70 ft
60,0
Lat C-75 ft
70,0 Maximum
Lat C-80 ft
80,0
90,0
100,0
25
Screen Selection
26
Lateral As-Built Construction
Screen Installation
Removing Projection Pipe
28
Remove Projection Pipe
29
Isolation Valves
30
Lateral Development
Lateral Development
• Sand line
• Air surge
• Mechanical
Advancement
32
Development
Performance Testing
34
Step Drawdown Test
35
Step Drawdown Test
36
37
Performance Testing – 21.6 feet of drawdown @ 7510 gpm (after 72 hours)
Performance Test Hydrographs
38
39
Yield Calculation
40
Questions?
Matt Reed – Layne,
Ranney Collector Wells
[Link]@[Link]
41