The document provides an overview of Ranney collector wells, including their design, construction, testing, and performance. It describes the various stages of below-grade construction and lateral installation, and includes diagrams to illustrate these processes. Sieve analysis is conducted to determine appropriate screen size based on local geology. Step drawdown tests are used to evaluate well performance and calculate sustainable yield.

Uploaded by

Ernesto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views41 pages

FWD Construction Overview PDF

The document provides an overview of Ranney collector wells, including their design, construction, testing, and performance. It describes the various stages of below-grade construction and lateral installation, and includes diagrams to illustrate these processes. Sieve analysis is conducted to determine appropriate screen size based on local geology. Step drawdown tests are used to evaluate well performance and calculate sustainable yield.

Uploaded by

Ernesto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Ranney Collector Well Introduction

Matthew Reed
Layne Christensen Company
Ranney Collector Wells
Collector Well Introduction

2
Ranney Collector Wells

• Geologists & Hydrogeologists (5)


• Engineers (1)
• Project Managers (2)
• Operations Manager (1)
• Equipment & Personnel
Managers (2)
• Mechanics & Fabricators (2)
• Specialty Construction
Superintendents & Crews (30)

As a group, responsible for collector well and caisson based surface


water intake construction throughout US and overseas (recent work
in Canada, Mexico, Republic of China, South Korea).

Based in Columbus, Ohio.


3
Lateral Design

• Screen Strength (specially


designed for stress of
installation)
• Slot Size (retain 30 to 50
percent of formation)
• Gravel Pack Requirements
(fine grained, uniform)
• Approach Velocity (< sqrt K /
220)
• Entrance Velocity (<1 ft/min)
• In-Line Velocity (< 1 ft/sec)
Design Considerations - Gravel Packing

Pre-Packed Wire-
wrapped Stainless Steel
• 20 to 55 % open area
• Inert Pack (Carbolite or
Glass Beads)

Allows finer grained


aquifers to be screened

5
Below Grade Construction Overview

6
Below Grade Plan & Section

7
Caisson Construction

8
Caisson Construction - Overview

9
Caisson Structural Details

10
Caisson Construction – Cutting Shoe

11
Caisson Construction - First Lift & Deadman

12
Caisson Construction – Lateral Port Assemblies

13
Caisson Construction

Pull Down While


Excavating -
Increases speed &
improves plumbness

14
Pour Bottom Plug

15
Lateral Installation

16
17
Lateral Installation - Overview

18
Jacking Equipment

19
Digging Head & Projection Pipe

20
Digging Head

• Designed for specific


formation
• Air/Wash and sand
lines
• Sand line for spoils
removal
• Detachable head

21
Projection Pipe Advancement

22
Lateral Screen Design

• Collect Samples
• Sieve Analysis
• Change design
with changes in
geology

23
Sieve Analysis

24
Sieve Analysis
Sieve Analyses-Collector Well
South Adams County Water and Sanitation District
Well 119
Lateral C

Grain Size, inches


0,00 0,01 0,02 0,03 0,04 0,05 0,06 0,07 0,08 0,09 0,10 0,11 0,12 0,13 0,14 0,15 0,16 0,17 0,18 0,19 0,20
0,0

10,0

Lat C-50 ft
20,0

Lat C-55 ft
30,0
Percent Passing

Lat C-60 ft
40,0

Lat C-65 ft
50,0 Minimum

Lat C-70 ft
60,0

Lat C-75 ft
70,0 Maximum

Lat C-80 ft
80,0

90,0

100,0
25
Screen Selection

26
Lateral As-Built Construction
Screen Installation
Removing Projection Pipe

28
Remove Projection Pipe

29
Isolation Valves

30
Lateral Development
Lateral Development

• Sand line
• Air surge
• Mechanical
Advancement

32
Development
Performance Testing

34
Step Drawdown Test

35
Step Drawdown Test

36
37

Performance Testing – 21.6 feet of drawdown @ 7510 gpm (after 72 hours)


Performance Test Hydrographs

38
39
Yield Calculation