ACTIVITY 4
OUTPUT
WORK BREAKDOWN STRUCTURES (WBS)
2 STOREY RESIDENTIAL HOUSE
SITE FOUNDATION FRAMINGS/ WALLS ROOFING UTILITIES FINISH
FORMWORKS WORK
Layout Grade Excavate Install Lay
Sheeting G.I. sheets
Erect Pour Remove Hang Tape & Electric Gas Water
Forms concrete Forms Sheetrock Bed
Floor Sub- Stud Frame Do Do Do
Joist floor Walls Roof rough-in rough-in rough-in
work work work
Install Install Install Install Get Get Get
1st 1st 1st 1st building building building
Floor Floor Floor Floor inspect inspect inspect
Install Install Install Install Do Do Do
2nd 2nd 2nd 2nd Finish Finish Finish
Floor Floor Floor Floor work work work
Install Install Install Paint Lay wall Lay floor
cabinets Appliances furnace walls tiles tiles