HVAC Manhours

The document provides a summary of ductwork installation tasks including the quantity of items to be installed, current status, required manpower and estimated manhours for each task. The tasks are broken down by floor and area. Status updates include quantities installed, remaining balances and estimated timelines.

Uploaded by

Sharad Sawant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
993 views34 pages

HVAC Manhours

The document provides a summary of ductwork installation tasks including the quantity of items to be installed, current status, required manpower and estimated manhours for each task. The tasks are broken down by floor and area. Status updates include quantities installed, remaining balances and estimated timelines.

Uploaded by

Sharad Sawant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

0

5000
10000
15000
20000
25000
30000
35000
40000
45000
50000

Area Reference

Balance Works 4/17/2021

Qty (A)

Units

7-Oct

13-Oct

Total Installed qty

Balance Qty = A

No: of People (B)

Time Needed for One Number of set in mins C

Total Manpower Required in Mins (B*C)

Total Manhours Required in hours = {A*(B*C)}/60

Remarks

Clearance Status

A-AIROLINK, B-ARCO, C-CLEARANCE start date

finish date

comments

Balance Qty

Total Manhours Required in min

Balance
26
20
15
12

21 1st floor

23 3th Floor

45 3rd Floor
44 2nd Floor
22 2nd Floor

43 First Floor

46 4th FLOOR
42 Ground Floor
BALANCE MANHOUR REQUIREMENT FOR DUCT A-AIROLINK, B-ARCO, C-CLEARANCE
Total

13-Oct
7-Oct
Sl No. Floor Ref Area Reference Balance Works 4/17/2021 Qty (A) Units Total Balance Qty = No: of People (B) Time Needed for One Number Total Manpower Required in Total Manhours Required in Remarks Clearance Status start date finish date comments Balance Qty Manhours Balance
Installed qty A of set in mins C Mins (B*C) hours = {A*(B*C)}/60 Required in
min

12 All Area AIR curtains 5 Nos. 0 5 4 30 120 10 no clearence a 1 Day ( After clearence) 5 120 10

15 Ground Floor All Area Air Outlets Installation 172 Nos. 2 170 2 20 40 114.67 NO FALSE CEILING b 7 days works ( after claerence) 170 40 113.333333

20 All Area Plenum Box installation 101 Nos. 98 3 3 60 180 303 Almoayyed STORE in Class Room a 18-Sep 18-Sep 3 180 9

21 1st floor All Area Air Outlets Installation 254 Nos. 222 32 2 15 30 127.00 b 1 Day ( After clearence) 32 30 16

22 2nd Floor All Area Air Outlets Installation 375 Nos. 359 16 2 15 30 188 b 1 Day ( After clearence) 16 30 8

23 3th Floor All Area Air Outlets Installation 362 Nos. 20 6 307 55 2 15 30 181 b 6-Oct 7-Oct 3 Days ( After clearence) 55 30 27.5

26 4th FLOOR All Area Air Outlets Installation 370 Nos. 219 151 2 15 30 185 ARCO need to cut the Board b 4 Days ( After clearence) 151 30 75.5

42 Ground Floor All Area PAD / TAD / GRILLE Marking 343 Nos. 2 341 2 7.5 15 85.75 NO FALSE CEILING b 5 Days ( After clearence) 341 15 85.25

43 First Floor All Area PAD / TAD / GRILLE Marking 566 Nos. 492 74 2 7.5 15 141.5 b 1 Day ( After clearence) 74 15 18.5

44 2nd Floor All Area PAD / TAD / GRILLE Marking 630 Nos. 630 0 2 7.5 15 157.5 3 hours ( After clearence) 0 15 0

45 3rd Floor All Area PAD / TAD / GRILLE Marking 641 Nos. 621 20 2 7.5 15 160.25 b 3 hours ( After clearence) 20 15 5

46 4th FLOOR All Area PAD / TAD / GRILLE Marking 568 Nos. 286 282 2 7.5 15 142 b 5 Days ( After clearence) 282 15 70.5

Total MH Required 2655 452.583333

68

Clearance Area Days required to complete the Days required to complete the balance
Available Man Power No clearance Area Manpower
Manpower Balance activities Activites ( No Clearance)

14 16 0.9 474.5 29.7


BALANCE MANHOUR REQUIREMENT FOR CHILLED WATER PIPE
Total

18-Apr

19-Apr

20-Apr

21-Apr

22-Apr

24-Apr

26-Apr

28-Apr

29-Apr

29-Jun
1-May

6-Aug
14-Jul
Total Installed Balance Qty = No: Of People Time Needed for One Total Manpower Required Total Manhours Required in Clearance Manhours
SL No. FLOOR REFERENCE. ACTIVITY Qty = A Unit Remarks Balance Qty Balance
qty A =B Number of set in mins = C in Mins (B*C) hours = {A*(B*C)}/60 status Required in
min

1 Remove un wanted support 0 0 0 Sets 2 10 20.00 0 0 20.00 0


All Basement
2 Cladding and Fostering in All Basement 0 0 0 RMT 2 15 30.00 0 0 30.00 0

FCU Valve Packages Installation with Insulation.(Irrigation


3 Basement-1 1 1 1 0 Sets 2 120 240.00 4 0 240.00 0
Pump Rm)

4 Ground Floor Piping Insulation (Near FAD Riser) 6 6 6 0 Rmt 2 8 16.00 2 0 16.00 0
107
Ground Floor
5 GF-AC-02 Valve Package Insulation (Furniture Store) 1 1 1 0 Nos. 2 24 48.00 1 Due to Airolink Store 0 48.00 0
107

6 Smoke curtains 2 1 1 2 0 Sets 2 60 120.00 4 0 120.00 0

7 4th Floor AHU vavle package insulation 5 1 2 2 5 0 Sets 2 30 60.00 5 0 60.00 0

8 FCU vavle package insulation 7 4 2 1 7 0 Sets 2 30 60.00 7 0 60.00 0

9 Piping Insulation (Near FAD Riser) 6 3 3 6 0 Rmt 2 10 20.00 2 0 20.00 0

10 Roof Valve Package Insulation (Chiller,FAHU ) 3 1 2 3 0 Rmt 2 45 90.00 5 0 90.00 0


Awaiting For MV [Link]
Installation of MV insulation
will be done
11 Roof Valve Package Insulation (FCU) 2 1 1 2 0 Rmt 2 45 90.00 3 0 90.00 0

12 Motorised Valve for Chiller 2 1 1 2 0 Nos. 3 45 135.00 5 0 135.00 0


Roof Floor Awaiting For Delivery.
13 Motorised Valve for Chiller Bypass 1 1 1 0 Nos. 3 45 135.00 2 0 135.00 0

14 Chemical Dosing Installation 1 1 1 0 Nos. 2 200 400.00 7 0 400.00 0

LPO [Link]
15 Cladding and Foster 336 0 336 RMT 2 0.00 0 336 0.00 0
Delivered.

16 Flushing For CHW Line 1 1 1 0 No. 4 0 0.00 0 0 0.00 0

45 0
No of people
Date Hours Manhour
Ducting CHW Pipe
4/18/2021 6 2 6.5 52
4/19/2021 6 2 6.5 52
4/20/2021 6 2 6.5 52
4/21/2021 6 2 6.5 52
4/22/2021 6 2 6.5 52
4/24/2021 6 2 6.5 52
4/25/2021 6 0 6 36
4/26/2021 6 2 6 48
4/27/2021 6 0 6 36
4/28/2021 6 2 6 48
4/29/2021 6 2 5 40
5/1/2021 5 2 5 35
5/2/2021 6 0 6 36
5/3/2021 7 0 6 42
5/4/2021 7 0 6 42
5/5/2021 7 0 6 42
5/6/2021 7 1 6 48

5/8/2021 7 1 6 48

5/9/2021 5 2 6 42
5/10/2021 7 0 6 42
5/11/2021 7 0 6 42
5/15/2021 10 0 6 60
5/16/2021 13 0 8 104

5/17/2021 13 0 8 104

5/18/2021 11 0 8 88
5/19/2021 9 0 8 72

5/20/2021 13 0 8 104

5/22/2021 13 0 8 104
5/23/2021 12 0 8 96

5/24/2021 12 0 8 96

5/25/2021 12 0 8 96

5/26/2021 11 0 8 88
5/27/2021 12 0 8 96
5/29/2021 11 0 8 88
5/30/2021 11 0 8 88
5/31/2021 11 0 8 88
6/1/2021 11 0 8 88
6/2/2021 10 0 8 80

6/3/2021 12 0 8 96

6/5/2021 12 0 8 96
6/6/2021 10 0 8 80
6/7/2021 10 0 8 80
6/8/2021 12 0 8 96
6/9/2021 12 0 8 96
6/10/2021 12 0 8 96
6/12/2021 10 0 8 80
6/13/2021 6 0 8 48
6/14/2021 8 0 8 64
6/15/2021 8 0 8 64
6/16/2021 8 0 8 64
6/17/2021 8 0 8 64
6/19/2021 8 0 8 64
6/20/2021 7 0 8 56
6/21/2021 8 0 8 64
6/22/2021 7 0 8 56
6/23/2021 8 0 8 64
6/24/2021 8 0 8 64
6/26/2021 7 0 8 56
6/27/2021 8 0 8 64
6/28/2021 8 0 8 64
6/29/2021 8 2 8 80
6/30/2021 7 0 8 56
7/1/2021 7 0 8 56
7/3/2021 8 0 8 64
7/4/2021 7 0 8 56
7/5/2021 8 0 8 64
7/6/2021 8 0 8 64
7/7/2021 8 0 8 64
7/8/2021 8 0 8 64
7/10/2021 8 0 8 64
7/11/2021 8 0 8 64
7/12/2021 8 0 8 64
7/13/2021 8 0 8 64
7/14/2021 8 2 8 80
7/15/2021 8 0 8 64
7/17/2021 8 0 8 64
7/18/2021 8 0 8 64
7/24/2021 8 0 8 64
7/25/2021 8 0 8 64
7/26/2021 8 0 8 64
7/27/2021 8 0 8 64
7/28/2021 8 0 8 64
7/29/2021 7 0 8 56
7/31/2021 7 0 8 56
8/1/2021 7 0 8 56
8/2/2021 7 0 8 56
8/3/2021 7 0 8 56
8/4/2021 4 0 8 32
8/5/2021 4 0 8 32
8/6/2021 0 2 8 16
8/7/2021 4 0 8 32
8/8/2021 4 0 8 32
8/9/2021 4 0 8 32
8/10/2021 4 0 8 32
8/11/2021 6 0 8 48

8/14/2021 6 0 8 48

8/15/2021 6 0 8 48

8/16/2021 6 0 8 48

8/17/2021 6 0 8 48

8/18/2021 4 0 8 32

8/19/2021 4 0 8 32

8/21/2021 4 0 8 32
8/22/2021 4 0 8 32

8/23/2021 4 0 8 32

8/24/2021 4 8 32

8/25/2021 4 8 32

8/26/2021 4 8 32

8/28/2021 4 8 32

8/29/2021 4 8 32

8/30/2021 4 8 32

8/31/2021 4 8 32

9/1/2021 4 8 32

9/2/2021 4 8 32

9/4/2021 4 8 32

9/5/2021 4 8 32

9/6/2021 4 8 32

9/7/2021 4 8 32

9/8/2021 2 8 16

9/9/2021 2 8 16

9/11/2021 1 8 8

9/12/2021 1 8 8

9/13/2021 1 8 8

9/14/2021 1 8 8

9/15/2021 1 8 8

9/16/2021 1 8 8

9/18/2021 2 8 16
9/19/2021 2 8 16

9/20/2021 2 8 16

9/21/2021 2 8 16

9/22/2021 2 8 16

9/23/2021 2 8 16

9/25/2021 2 8 16

9/26/2021 2 8 16

9/27/2021 2 8 16

9/28/2021 2 8 16

9/29/2021 2 8 16

9/30/2021 2 8 16

10/2/2021 2 8 16

10/3/2021 2 8 16

10/4/2021 2 8 16

10/5/2021 2 8 16

10/6/2021 2 8 16

10/7/2021 2 8 16

10/9/2021 2 8 16

10/10/2021 2 8 16

10/11/2021 2 8 16

10/12/2021 2 8 16

10/13/2021 2 8 16

Total 7223
Remarks

1st Flr.
2nd Flr.
3rd Flr.

Unloading the GI Duct for GF


Unloading the GI Duct for GF

Consultant Comments Rectified at 1st,2nd and 3rd


Floor.

Unloading the Insulation Material


Smoke Curtain Comments Rectified

Grille Shifting At 3rd Floor to another Room.

Consultant Comments Rectified at 1st,2nd and 3rd


Floor.(Access Door)

Consultant Comments Rectified at 1st,2nd and 3rd


and 4th Floor.

[Link] Rework Due to Ceiling Support.

Grille Shifting from 2nd Floor to 3rd Floor.


Grille Shifting from 2nd Floor to 3rd Floor.

1st Floor Final Fixer Marking and GF 14 [Link]


Insulation Linear,Foster Completed.

2nd and 4th Floor Duct Raised due to ARCO support


clashing.
4th Floor [Link] Plenum Location changed as
per approved RFI.
2nd Floor Duct Rework due to clashing with Light

Consultant Comments rectified.

Grille Checking

Grille Shiftting
2 person with Moltan, 2
person Filter Cleaning

2nd and 3rd floor AHU filter and Strainer Cleaning.

Consultant Comments Rectification.

duct raise up ( ahu1) and ahu5 plenum change with


flexible

plenum changing+ final fixture remove at 3rd floor

garbage room at 2nd and 4th flexible + joint


rectify consultant comments + garbage room+duct
remove @ 2nd floor (wet area)
duct install wet area @ 2nd foor with flexible + filter
installation @ first
CONSULTANT COMMENT 2F AND 1F AND 4 FILTER
CHANGE AND VCD OPEN @1F
CONSULTANT COMMENT corridor and vcd opening
and 1 plenum changing @ 1f
3rd floor consultant comments + 1f plenum
changing and filter
rectify consultant comments corridor and install 2
flexible line + 2 people work for fire stop

duct remove in wet area + 2 plenum change

2 people working for pu foam + comments ( prayer


room)

PU foam GF

PU foam GF ( AHU2 lvl3 Noise)

scafolding shifting

duct rasing up for light support

3rd floor FCU shifting

rectification comments + pufoam cutting


8
filter cleaning + fd and mech 4th floor
8
filter cleaning
8
filter cleaning

air balancing

filter cleaning + Air blancing

rectification comments in 4th wet area


rectification comments gf + wet area

rerouting line in 4th ministry office clashing with


light profile

Marking acces door + final fix @2nd & 3rd floor

Marking acces door + final fix @2nd & 3rd floor +


gym area rectification

flexible exhaust for pantry at 4th floor and fire


sealent

duct remove in ground floor and mech installation

sort out grill for all floor

gym area ectended duct @ 1f

consultant comments

duct remove + materail shifting + provide acces door


at 4th pantry area

Wet area consultant comments+ Material shifting

classes area at GF cut all extra threaded rod +


support+third floor Marking and labeling

filter cleaner 2nd and 3rd

dinimg area return air FCU machine

dinimg area return air FCU machine + material


shifting

Mini market plenum installtion + ahu remove duct

duct changing gym area


338 PAD+TED
251 PAD+TED
240 PAD+TED
MANPOWER MANAGEMENT - MOHRE ( DHPP0016)
Total Manhour Available Daily Manpower Days required to
Total Manhour
Required to Manhour worth work (AEM + Supply + Sub Contr.) Working complete the
Activity Required to complete complete the Works Total Manhour done as on Productivity as on (without hours Total MH Balance Remarks
the Works as on 4/21 as on Consumed till Supervisor/Foreman) Activities
Wed, Aug 11, 2021 Wed, Aug 11, 2021 Wed, Aug 11, 2021 Wed, Aug 11, 2021
AC-Ducting-AEC 2655.10 452.58
7,223.00 2,247.83 31% 8.00 8.00 64.00 7.07
AC-CHW Piping 45.32 -
AC-Ducting-Subcon
Total 2700.42 452.58 7,223.00 2,247.83 31% 8.00 8.00 7.07
Sl No. Floor Ref Area Reference

1 Basement 3 All Area

2 basment 2 All Area

3 GED

4 Basement 1 Tele./Driveway/LV Rm

5 Drive way

6 All Basement

7 All area

8 All area

9 Fire Exit Area

10 All Area

11 All Area

12 All Area

13 Security Toilet
Ground Floor
14 All Area

15 All Area

16 All Area

17 Near Stair Case 2

18

19 Customer Care
20 All Area

21 1st floor All Area

22 2nd Floor All Area

23 3th Floor All Area

24 All Area

25 4th FLOOR All Area

26 All Area

27 All area

28 roof All area

29

30 All Area

31 1st floor All Area

32 GYM Passage

33 All Area

34 2nd Floor All Area

35 Corridoor Area

36 All Area
3rd Floor
37 Corridoor Area

38
All Area
39 4th Floor

40 Corridoor Area

41

42 Ground Floor All Area


43 First Floor All Area

44 2nd Floor All Area

45 3rd Floor All Area

46 4th FLOOR All Area

Shifting and
Offloading of
Materials
BALANCE MANHOUR RE

24-Jun

26-Jun

27-Jun
Balance Works 4/17/2021 Qty (A) Units

Air Outlets Installation with Marking 6 Nos.

Air Outlets Installation with Marking 6 Nos.

Generator Fan/Substation Fan Mouth Connection 2 Nos.

Air Outlets Installation with Marking 15 Nos. 3

Installation of Firated Duct 4 Nos.

Installation AD 6 No. 6

Duct installation (Duct kept ready with Insulation ) 38 Nos.

Installation of hand Fabrication Duct as per site condition


36 Nos.
(With out Insulation)

Installation of Sand Trap 0 Nos.

Insulation with foster (Installed Duct) 2 Nos. 2

Duct Joint Insulation with Foster 800 Nos.

AIR curtains 5 Nos.

Fan Installation Balance 1 Nos.

Mouth connection for all equipments Including Insulation 21 Nos.

Air Outlets Installation 172 Nos.

Installation VCD 1 Nos.

Installation FD 1 No.

Installation AD 15 No. 15

Installation MD 1 No. 1
Additional MSD due to FM 200 Location changed 4 Nos. 2

Plenum Box installation 5 Nos. 1 1 1

Air Outlets Installation 144 Nos. 15

Air Outlets Installation 170 Nos. 15 15 15

Air Outlets Installation 215 Nos. 20 20

Plenum Box with Insulation 1 Nos.

Duct insulation with foster 35 Nos.

Air Outlets Installation 327 Nos. 4

Fire damper for FAD 1 Nos.

Cladding for FCU,FAHU Duct. 0 Sqmt

Testing and commissioning 0

Installation of Missing VCD 4 Nos.

Installation of Missing Access Door for FD 9 No.

Installation of Missing Accoustic Linear for Plenum 4 Nos.

Installation of Missing VCD 2 Nos.

Installation of Missing Access Door for FD 4 No.

Missing Linear for Plenum 4 Nos.

Installation of Missing VCD 1 No.

Missing Linear for Plenum 10 Nos.

Installation of Missing VCD 10 Nos.

Installation of Missing Access Door for FD 16 Nos.

Missing Linear for Plenum 8 Nos.

Testing and commissioning 0

PAD / TAD / GRILLE Marking 343 Nos.


PAD / TAD / GRILLE Marking 451 Nos. 42 42

PAD / TAD / GRILLE Marking 327 Nos. 30 30

PAD / TAD / GRILLE Marking 302 Nos. 25 25

PAD / TAD / GRILLE Marking 558 Nos. 50 50


MANHOUR REQUIREMENT FOR DUCT
28-Jun

29-Jun

30-Jun
Total

1-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul
Installed qty

5 5

1 1

15

1
2 4

1 1 5

15 15 15 15 15 15 15 15 9 144

15 15 15 15 15 20 20 10 170

20 20 20 20 20 20 19 18 18 215

1 5

0
42 42 42 42 42 42 39 38 38 451

30 30 30 30 30 30 29 29 29 327

25 25 25 25 25 31 32 32 32 302

50 50 50 50 50 50 54 54 50 558
Balance Qty = Time Needed for One Number Total Manpower Required
No: of People (B)
A of set in mins C in Mins (B*C)

6 2 20 40

6 2 20 40

2 2 30 60

12 2 20 40

4 2 20 40

0 2 25 50

38 2 15 30

36 2 30 60

0 4 50 200

0 3 20 60

800 2 6 12

0 4 30 120

1 2 20 40

21 4 60 240

172 2 20 40

0 2 12 24

1 2 25 50

0 2 25 50

0 2 12 24
0 2 12 24

0 3 60 180

0 2 15 30

0 2 15 30

0 2 15 30

1 2 60 120

35 3 30 90

322 2 15 30

1 2 90 180

0 2 0 0

0 2 0 0

4 2 12 24

9 2 25 50

4 2 60 120

2 2 12 24

4 2 25 50

4 2 60 120

1 2 12 24

10 2 60 120

10 2 12 24

16 2 12 24

8 2 60 120

0 2 0 0

343 2 7.5 15
0 2 7.5 15

0 2 7.5 15

0 2 7.5 15

0 2 7.5 15

Total MH Required
A-AIROLINK, B-ARCO, C-CLEARANCE

Total Manhours Required in


Remarks Clearance Status Balance Qty
hours = {A*(B*C)}/60

4 b 6

4 b 6

2 2

10 b 12

3 4

5.00 0

Due to ARCO Store/Airolink Kept


19 a 38
Material

36 36

0 0

LPO Released (112190599-0)


2.00 c 0
Insulation Received.
LPO Released (112190599-0)
160 Insulation Received. a 800

10 LPO Released (112190498-0) . c 0

0.67 1

LPO Released (112190599-0)


84 Insulation [Link] Lighting a 21
Store

114.67 NO FALSE CEILING b 172

LPO Released (112190600-0) Material


0.40 c 0
Received.

0.83 Due to ARCO Store b 1

12.50 c 0

0.40 c 0
1.60 c 0

LPO Released (112190599-0)


15 c 0
Insulation Received.

72.00 c 0

85 c 0

108 c 0

2 1

LPO Released (112190599-0)


52.5 35
Insulation Received.

163.5 b 322

3 1

LPO Released (112190636-0) Awaiting


0 0
for Material Deliver.

0 0

1.60 Material Received from ALWasl. 4

7.50 9

8 4

0.80 Material Received from ALWasl 2 Nos. 2

3.33 4

8 4

0.40 Material Received from ALWasl 1 Nos. 1

20 10

Material Received from ALWasl 11


4.00 Nos. 10

6.40 16

16 8

0 0

85.75 NO FALSE CEILING b


112.75 c 0

81.75 c 0

75.5 c 0

139.5 a 0

1542
Total
Manhours
Balance
Required in
min

40 4

40 4 42

60 2 36

40 8 24

40 2.66666667

50 0

30 19 102

60 36

200 0

60 0 207.26

12 160 40 piece

120 0

40 0.66666667

240 84

40 114.666667

24 0

50 0.83333333

50 0

24 0
24 0

180 0 8

30 0 (Total =246)

30 0 (Total=343)

30 0 (Total=347)

120 2

90 52.5 75

30 161

180 3

0 0

0 0

24 1.6

50 7.5

120 8

24 0.8

50 3.33333333

120 8

24 0.4

120 20

24 4

24 6.4

120 16

0 0
15 0

15 0

15 0

15 0

730.366667
HVAC BALANCE WORK FOR CLEARANCE AREA

SL No. AREA CLEARANCE ACTIVITY TARGET DATE Remarks


Consultant comments
1 Ground Floor 10-Aug-21
Rectification

2 Third Floor Fixing Grilles 10-Aug-21

Fire Sealant Applying for Attrium


3 Roof Floor 10-Aug-21
Duct

4 Third Floor Coridoor Access Door Marking 11-Aug-21

Consultant comments
5 First Floor Rectification 11-Aug-21

Consultant comments
6 Ground Floor 14-Aug-21
Rectification

7 Second Floor Extra Threadedrod to be cut 14-Aug-21