Curve Widening Estimate SH 216
Curve Widening Estimate SH 216
Name of work: Curve Widening at 4/8, 4/10 & 5/2 of Solatharam - Srimushnam road (SH 216)
200.00 m²
Excavation including removal and satisfactory disposal of all materias
necessary for the construction of roadway and side drains in accordance
2 with the specifications and the lines, grades and cross sections shown in the
drawings or as indicated by the Engineer for Box Cutting for Wideneing
Portion and as per MORTH No. 111, 112, 201, 202, 301, 302.
KM 4/8 1 X 1 200.000 3.000 0.905 543.000
KM 4/10 1 X 1 200.000 3.000 0.905 543.000
KM 5/2 1 X 1 200.000 3.000 0.905 543.000
1629.00 m³
Providing and Laying Granular Sub-Base Grade- III consisting of well
graded Material confirming to the grading given in Table No.400-1, mixing
in a mechanical mix plant at OMC, carriage of mixed Material to work site,
4
spreading in uniform layers with motor grader on prepared surface and
compacting with vibratory roller to achieve the desired density, etc.,
complete as directed by the Engineer.
Sl. Measurement in Metre
Description of work No. Contents
No. L B D
270.00 m³
Providing and Laying Granular Sub-Base Grade- V consisting of well
graded Material confirming to the grading given in Table No.400-1, mixing
in a mechanical mix plant at OMC, carriage of mixed Material to work site,
5
spreading in uniform layers with motor grader on prepared surface and
compacting with vibratory roller to achieve the desired density, etc.,
complete as directed by the Engineer.
KM 4/8 1 X 1 200.000 3.000 0.255 153.000
459.00 m³
Provding and Laying Wet Mix Macadam consisting of clean crushed
aggregates confirming to the grading given in Table No.400-13, including
premixing the Material with water at OMC in mechanical mix plant carriage
6 of mixed Material by tipper to site, laying in uniform layers with paver on
well prepared surface and compacting with vibratory roller to achieve the
desired density, etc., complete as directed by the Engineer. as per MORTH
No. 111, 112, 406, 900.
KM 4/8 1 x 1 200.00 3.000 0.250 150.00
450.00 m³
Providing and applying Prime Coat over granular Base with bitumen
emulsion (SS-I type) on prepared surface including preparing the road
7 surface and spraying the primer at the rate of 0.70 kg/sqm using bitumen
sprayer as directed by the Engineer - over WMM as per MORTH No. 111,
112, 502, 900
KM 4/8 1x1 200.00 3.000 600.00
1800.00 m²
Providing and applying Tack Coat over existing bituminous surfaces
with Bitumen Emulsion (RS-I type) using mechanical sprayer at the rate of
8
0.20 kg per sqm on the prepared bituminous surface as directed by the
Engineer as per MORTH No. 111, 112, 503, 900
KM 4/8 1x1 200.00 7.000 1400.00
4200.00 m²
Providing and laying Dense Bituminous Macadam which work shall
consist of construction, using crushed aggregates, (Table 500-10) premixed
with VG 30 Grade Bitumen at the rate of minimum 4.50% by weight of the
total mix confirming to the aggregates and binder as per the job mix
9 formula in the Hot mix plant, transporiting the mix to the worksite, laying
with paver finisher and compaction with smooth wheeld and vibratory roller
in accordance with the requirements of the specification and in confirmity
with the drawing as directed by the Engineer for DBM (Grade-II) as per
MORTH No. 111, 112, 505, 900
KM 4/8 1x1 200.00 3.000 0.050 30.00
240.00 m³
Providing and laying Carted Earth having minimum with an additional
lead of km including cost of earth, seniorage charges conveyance, laying,
12
watering and consolidation etc., complete as directed by the Engineer for
forming the shoulders as per MORTH No.111, 112, 305, 900
Sl. Measurement in Metre
Description of work No. Contents
No. L B D
KM 4/8 1x2 200.00 1.00 0.100 40.00
120.00 m²
18 Upkeeping of Road
Name of work : Curve Widening at 4/8, 4/10 & 5/2 of Solatharam - Srimushnam road (SH 216)
(or) 54.00 KM
14.00
223.60
(or) 224.00 KM
BULK BITUMEN (80/100-VG 10) FROM THIRUVOTTIYUR TO WORK SITE .
(or) 246.00 KM
EMULSION FROM IRUNKATTUKOTTAI TO WORK SITE .
1 Factory to Sipcot road Km 2./0 - 0./0 = 2.00
2 Irunkattukottai Road Km 34./8 - 41./74 = 6.94
3 Sriperambudur - Singaperumalkoil Road Km 24./6 - 0./0 = 24.60
4 N.H. 45 Chennai-Trichy-Dindugal Road Km 47./8 - 149./8 = 102.00
5 Vikkiravandi - Kumbakonam - Thanjavur Road Km 0./0 - 75./2 = 75.20
150mm
485 mm 12 mm
6
2
985mm 5
250mm
250mm
110mm 2
dia 5
250 0
3
610mm 7
5
Cross-Section of RCC Crash Barrier
MODEL DATA
Providing cast in situ RCC M25 grade (Design Mix) crash Barrier type centre Median of size 0.610M at Bottom, 0.250M at Middle and 0.150M
at top to a total height of 0.985M using HBG ISS graded metal including cost and conveyance of all materials to site including 24.60kg cost of
Reinforcements as per to steel schedule in the appended drawing, fabrication and placing in position of steel rods, cost of Binding wire, laying the
concrete, labour charges for mixing, watering curing including centering shuttering, rendering smoothness over the RCC surface with 10Kg of
cement per 10 Squre Metre and painting two coat over the RCC surface with best approved quality of enamel paint over the primer coat, picking
the existing BT surface removal of debris etc. Complete as directed by the department officer and as per MORTH specification.
COST OF MATERIALS
Convey
Kind of Lead Cost of Total
Sl.No ance
materials in km Materials charge
20 mm ISS
1 54 1432.00 478.16 1910.16
metal
12 mm ISS
2 54 1329.00 478.16 1807.16
metal
M.Sand for
3 87 1280.00 723.25 2003.25
mortar
RATE OF LABOUR
Mazdoor I class (P-14) 562.00 each 562.00
Mazdoor II class (P-15) 461.00 each 461.00
Mason I class (P-12) 861.00 each 861.00
Mason II class (P-14) 804.00 each 804.00
Fitter I class (P-12) 747.00 each 747.00
Painter I class (P-12) 688.00 each 688.00
Carpenter I class (P-12) 842.00 each 842.00
Vibration charges for
RCC (P-30) 81.30 cum 81.30
(RMP) Iron
work Synthetic
225.40 Lt 225.40
Enamel Paint
page 51
White Led (Local rate) 38.50 kg 38.50
Boiled Linseed Oil
19.80 Lt 19.80
(Local rate)
Whiting (Local rate) 35.00 kg 35.00
1. Centering Area (for 1M length)
1 x 2 - 1.00 x 0.250 = 0.500
1 x 2 - 1.00 x 0.3125 = 0.625
1 x 2 - 1.00 x 0.490 = 0.980
2.095
Add sides on end L.S. 0.105
Total Area 2.20M2
1 x 2 - 0.25 = 0.500
1 x 2 - 0.3125 = 0.625
1 x 2 - 0.49 = 0.980
Top 1 x 1 - 0.15 = 0.150
2.255
sides on end - LS 0.095
2.35 M2
2 x 1 - 2.00
4 x 0.86 - 3.44
5.44 RM
(i) Material
(ii) Strutting
Prime coat
10.Rendering Smoothness over the CC surfaces with 10kg of cement for 10 Sqm
12. RCC centre median of size 0.610m bottom 0.25 m at middle 0.15m top at a height of 0.985 metre from the road
level to top of median
Fuel charges per day (Diese 2.50x Lit / Hr 8.00 Hrs.x 90.17 / LitRs. 1803.40
Water Sprinklers
Fuel charges per day (Diese 3.25x Lit / Hr 8.00 Hrs.x 90.17 / LitRs. 2344.42
Total Hire charges for Macheries per 1 = 6.56 + 3.73 = Rs. 10.29 /Cum
2.00 Nos. of Mazdoor Ist Class Rs. 562.00 / Each = Rs. 1124.00
Total Labour charges for laying gravel per 100 Cum Rs. 1124.00
Total Labour charges for laying gravel per cum 1124.00 Rs. 11.24 /Cum
100
Total Hire and Labour charges 10.29 + 11.24 Rs. 21.53 /Cum
Name of
Curve Widening at 4/8, 4/10 & 5/2 of Solatharam - Srimushnam road (SH 216)
work
Km Palayankottai at Carted
2 96.60 22.26 - 118.86
4/6-5/2 km 6/4 Earth
CIRCLE
VILLUPURAM
DIVISION
CUDDALORE
SUB DIVISION
KATTUMANNARKOIL
JOB CODE
CRIDP 2021-2022
ROAD NO.
SH-216
NAME OF WORK
ESTIMATE AMOUNT
Rs.100.00 Lakhs