Excavation to Reduced Level: Cut & Fill

The document discusses excavation to reduced levels including cut and fill operations. It covers the scope of excavation work including site preparation, cutting, filling, disposal of excess earth and water, and importation of filled materials. Measurement and payment clauses from standard method of measurement are also mentioned.

Uploaded by

Simyeen Leong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
1K views15 pages

Excavation to Reduced Level: Cut & Fill

The document discusses excavation to reduced levels including cut and fill operations. It covers the scope of excavation work including site preparation, cutting, filling, disposal of excess earth and water, and importation of filled materials. Measurement and payment clauses from standard method of measurement are also mentioned.

Uploaded by

Simyeen Leong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Introduction: Introduces the subject of measurement of external works, with a focus on excavation to reduced levels using cut and fill methods.
  • Excavation Procedures: Details processes of site preparation, excavation types, and materials handling in excavation work, including equipment and safety considerations over several detailed diagrams and descriptions.

BTQS3044

MEASUREMENT OF
EXTERNAL WORKS
LECTURE 3
EXCAVATION TO REDUCED LEVEL
– CUT & FILL
EXCAVATION TO REDUCED LEVEL – CUT & FILL
Taking - Off

58
EXCAVATION TO REDUCED
LEVEL – CUT & FILL

Scope Of Work related :-


• Site Preparation
• Site Clearing
• Removing Trees
• Removing Tree Stumps
• Excavation
• Cut
• Fill
• Removed from site excess earth
(Disposal excavated material)
• Imported filled material
• Pump Water (Disposal of Water)

59
EXCAVATION TO REDUCED LEVEL
– CUT & FILL (SMM2 Section)
SECTION D : EXCAVATION AND
EARTHWORK
• Site Clearing, bushes, shrubs(m2): Clauses D.3; D.6; D.7
• Cutting Down hedges (m) : Clauses D.2
• Cutting Down Trees (Nos) : Clauses D.4
• Cutting Down tree stumps (Nos) : Clauses D.5
• Excavation – Cut & Fill (m3) : Clauses D.9
• Excavation In Rock (m3) : Clauses D.12.2
• Disposal of water (Item) : Clauses D.15 & D.16
• Backfilling (m3) : Clauses D.23 & D.25
• Remove (m3) : Clause D.19
(Clause D.17-D.22)
..\SMM2 Tabulation\4. SECTION D EARTHWORKS [Link]

YOUR COMPANY NAME 60


EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Clearing Site of undergrowth, bushes,
shrubs, rubbish, debris and the like;
incluuding grubbing up roots and
removing from site

[Link] m2 Length
xx

Width
xx

61
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Cutting Down trees, grubbing up roots
and removing from site including
backfilling voids with selected excavated
materials arising from excavation each
layer not exceeding 300mm thick

n.e 300mm girth


* in stages of 300mm
[Link] Nos girth Nos
xx

62
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Cutting down hedges, grubbing up roots
and removing from site including
backfilling voids with selected excavated
materials arising from excavation each
layer not exceeding 300mm thick

2.00 m high

[Link] m Length
xx

63
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Bulk excavation to the required formation
levels and fill in the excavated materials to
areas of filling and compact to the
required levels all within the boundary of
the site and including formation of slopes

[Link] m3 (computation from earthwork drawings


- refer attached working) * When qty of cut is
more than fill then use
the qty of fill in
measurement

64
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Approved imported earth filling to be obtained
from Contractor's own source, deposit, spread,
levelled, well rolled and consolidated in
150mm layers; in making up levels or forming
embankments to area where directed within
the site including compacting filling; all in
accordance with the S.O's instruction
* When qty of filling is
more than cut
[Link] m3 (computation from earthwork drawings
- refer attached working)

65
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
OR
Bulk excavation to the required formation levels and
remove excavated material from the site to Contractor's
own spoil heaps including forming slopes

[Link] m3 (computation from earthwork drawings


- refer attached working)
* When only cut qty in
cut & fill calculation

66
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Bulk excavation in rock to the required formation levels
and remove excavated material from the site to
Contractor's own spoil heaps including forming slopes

OR
* only as allowance

Extra over for excavating in rock

67
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Excavation for unsuitable material and infill with
imported earth filling obtained from the Contractor's
own source, deposit, spread, levelled, well rolled and
consolidated in 150mm layers; in making up levels or
forming embankments to area where directed within
the site including compacting filling; all in accordance
with the S.O's instruction

* When qty of filling is


more than cut need to
get imported material
from out side of site

68
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Keeping the surface of the site and the
whole of the excavations free from all
surface water by pumping or otherwise

Item

Keeping the whole of the excavations free


from all ground and subterranean water by
pumping or otherwise

Item
69
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Allow provision of as built plans of earthworks
all in accordance with the specification and to
the entire satisfaction and approval of the S.O
and local Authorities

Item The Whole earthwork platform levels

70
THANK YOU
PREPARED BY :
Sr. Mieranie Watie

BTQS3044
MEASUREMENT OF 
EXTERNAL WORKS
LECTURE 3
EXCAVATION TO REDUCED LEVEL 
– CUT & FILL
EXCAVATION TO REDUCED LEVEL – CUT & FILL
Taking - Off
58
EXCAVATION TO REDUCED 
LEVEL – CUT & FILL
• Site Preparation 
•
Site Clearing
•
Removing Trees
•
Removing Tree Stumps
• Excav
SECTION D : EXCAVATION AND 
EARTHWORK
• Site Clearing, bushes, shrubs(m2): Clauses D.3; D.6; D.7
• Cutting Down hedges 
(m)
:
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
       
   
      
    xx.xx      m2
                  
Length
 xx
Width
xx
Clearin
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
       
   
      
      
      n.e 300mm girth
    
    xx.xx     
    Nos
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
       
   
      
      
      2.00 m high
    
    xx.xx     
    m
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
       
   
      
    xx.xx m3                  (computation from earthwork drawin
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
       
   
      
 xx.xx m3
    (computation from earthwork drawings
- refer attac
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
OR
       
   
      
 xx.xx m3
    (computation from earthwork drawings
- refer at