EXCAVATION TO REDUCED LEVEL
– CUT & FILL
EXCAVATION TO REDUCED LEVEL – CUT & FILL
Taking - Off
58
EXCAVATION TO REDUCED
LEVEL – CUT & FILL
Scope Of Work related :-
• Site Preparation
• Site Clearing
• Removing Trees
• Removing Tree Stumps
• Excavation
• Cut
• Fill
• Removed from site excess earth
(Disposal excavated material)
• Imported filled material
• Pump Water (Disposal of Water)
59
EXCAVATION TO REDUCED LEVEL
– CUT & FILL (SMM2 Section)
SECTION D : EXCAVATION AND
EARTHWORK
• Site Clearing, bushes, shrubs(m2): Clauses D.3; D.6; D.7
• Cutting Down hedges (m) : Clauses D.2
• Cutting Down Trees (Nos) : Clauses D.4
• Cutting Down tree stumps (Nos) : Clauses D.5
• Excavation – Cut & Fill (m3) : Clauses D.9
• Excavation In Rock (m3) : Clauses D.12.2
• Disposal of water (Item) : Clauses D.15 & D.16
• Backfilling (m3) : Clauses D.23 & D.25
• Remove (m3) : Clause D.19
(Clause D.17-D.22)
..\SMM2 Tabulation\4. SECTION D EARTHWORKS [Link]
YOUR COMPANY NAME 60
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Clearing Site of undergrowth, bushes,
shrubs, rubbish, debris and the like;
incluuding grubbing up roots and
removing from site
[Link] m2 Length
xx
Width
xx
61
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Cutting Down trees, grubbing up roots
and removing from site including
backfilling voids with selected excavated
materials arising from excavation each
layer not exceeding 300mm thick
n.e 300mm girth
* in stages of 300mm
[Link] Nos girth Nos
xx
62
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Cutting down hedges, grubbing up roots
and removing from site including
backfilling voids with selected excavated
materials arising from excavation each
layer not exceeding 300mm thick
2.00 m high
[Link] m Length
xx
63
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Bulk excavation to the required formation
levels and fill in the excavated materials to
areas of filling and compact to the
required levels all within the boundary of
the site and including formation of slopes
[Link] m3 (computation from earthwork drawings
- refer attached working) * When qty of cut is
more than fill then use
the qty of fill in
measurement
64
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Approved imported earth filling to be obtained
from Contractor's own source, deposit, spread,
levelled, well rolled and consolidated in
150mm layers; in making up levels or forming
embankments to area where directed within
the site including compacting filling; all in
accordance with the S.O's instruction
* When qty of filling is
more than cut
[Link] m3 (computation from earthwork drawings
- refer attached working)
65
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
OR
Bulk excavation to the required formation levels and
remove excavated material from the site to Contractor's
own spoil heaps including forming slopes
[Link] m3 (computation from earthwork drawings
- refer attached working)
* When only cut qty in
cut & fill calculation
66
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Bulk excavation in rock to the required formation levels
and remove excavated material from the site to
Contractor's own spoil heaps including forming slopes
OR
* only as allowance
Extra over for excavating in rock
67
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Excavation for unsuitable material and infill with
imported earth filling obtained from the Contractor's
own source, deposit, spread, levelled, well rolled and
consolidated in 150mm layers; in making up levels or
forming embankments to area where directed within
the site including compacting filling; all in accordance
with the S.O's instruction
* When qty of filling is
more than cut need to
get imported material
from out side of site
68
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Keeping the surface of the site and the
whole of the excavations free from all
surface water by pumping or otherwise
Item
Keeping the whole of the excavations free
from all ground and subterranean water by
pumping or otherwise
Item
69
EXCAVATION TO REDUCE LEVEL
- CUT AND FILL
Allow provision of as built plans of earthworks
all in accordance with the specification and to
the entire satisfaction and approval of the S.O
and local Authorities
Item The Whole earthwork platform levels
70
THANK YOU
PREPARED BY :
Sr. Mieranie Watie