0% found this document useful (0 votes)
212 views3 pages

Gantt Chart

The document contains a project schedule with 6 milestones from November 2021 through March 2022. It includes the project start and end dates, milestone names and durations, and planned start and end dates for each milestone. The document also notes that additional milestones can be added by inserting new rows above the last instruction.

Uploaded by

Jone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
212 views3 pages

Gantt Chart

The document contains a project schedule with 6 milestones from November 2021 through March 2022. It includes the project start and end dates, milestone names and durations, and planned start and end dates for each milestone. The document also notes that additional milestones can be added by inserting new rows above the last instruction.

Uploaded by

Jone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

uc

tio
n
is
in
cel
l
A2
2. Position Milestone/Activity Start Date Days needed End Date
1 Project Schedule 11/1/2021 120 3/1/2022
2 Planning 11/1/2021 14 11/15/2021
3 Design 11/16/2021 14 11/30/2021
4 Implementation 12/1/2021 45 1/15/2022
5 Testing 1/16/2022 30 2/15/2022
6 Maintainance 2/16/2022 13 3/1/2022

To add more milestones/activities, insert new rows above this line.


This is To
theadd
lastmore Milestones/Activities,
instruction insert new rows above this line
in this worksheet.

11/1/2021 11/21/2021 12/11/2021 12/31/2021 1/20/2022 2/9/2022 3/1/2022

Planning

Design

Implementation

Testing

Maintainance

Page 1 of 3
uc
tio
n
in
thi
s
w
or
ks
he Scrolling Increment: 0
et.
30 December 1899 19 January 1900 8 February 1900 28 February 1900 20 March 1900 9 April 1900 29 April 1900 19 May 1900

120

14

14

45

Err:508

Page 2 of 3
About this workbook

Enter your data in the Project Tracker worksheet, then scroll through a visual representation of
your timeline in the Gantt chart worksheet.

The position column in the Project Tracker worksheet allows you to chart milestones and
activities on separate lines. You could, for instance, have two milestones/activities that start on
the same day and run in parallel. They would overlap in the chart if they had the same position
value. Provide two unique values to chart on separate lines. Try it!

As the chart concludes, you may notice markers with no text and no duration set at a specific
timeline. As the last milestone scrolls off the chart, these markers indicate the end of the
milestones in the Project Tracker to chart. Simple scroll back or to the beginning to see the
chartable milestones. You can scroll back and forth by entering value in 'Gantt chart!C1'

Guide for screen readers

There are 4 worksheets in this workbook.

Project Tracker
Gantt chart
About
Dynamic Chart Data (Hidden)

The instructions for each worksheet are in the A column starting in cell A1 of each worksheet.
They are written with hidden text. Each step guides you to the information in that row. Each
subsequent step continues in cell A2, A3 and so on, unless otherwise explicitly directed. For
example, instruction text might say “continue to cell A6” for the next step.

Hidden text will not print.

To remove these instructions from any worksheet, simply delete column A.

This is the last instruction in this worksheet.

Page 3 of 3

You might also like