Project Report For Flour Mill

The document is a project report for a flour mill owned by Shri Tega Kumar. It proposes setting up a flour mill with total project cost of 10 lakhs to be financed through own funds and a term loan. It includes details of the means of finance, projected financial statements like balance sheets and profit and loss statements for 5 years, key financial ratios, repayment schedule for the term loan and assumes 100% capacity utilization.

Uploaded by

SHRUTI AGRAWAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views11 pages

Project Report For Flour Mill

The document is a project report for a flour mill owned by Shri Tega Kumar. It proposes setting up a flour mill with total project cost of 10 lakhs to be financed through own funds and a term loan. It includes details of the means of finance, projected financial statements like balance sheets and profit and loss statements for 5 years, key financial ratios, repayment schedule for the term loan and assumes 100% capacity utilization.

Uploaded by

SHRUTI AGRAWAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Project Overview: Provides introductory details about the project, including entrepreneur's name, unit address, and project cost.
  • Cost and Means of Finance: Breaks down the proposed cost of the project including plant, machinery, and finance details.
  • Balance Sheet (Projected): Presents a projected balance sheet for financial planning and reflection of assets and liabilities.
  • Profit & Loss Statement (Projected): Provides a projected profit and loss statement for revenue and expense estimation.
  • Term Loan Repayment Schedule: Details the schedule and interest calculation for repayment of a term loan over time.
  • Schedule of Loan Repayment: Explains the repayment structure and working capital loan requirements.
  • Depreciation on Fixed Assets: An account of the depreciation on fixed assets like machinery and fixtures.
  • Break Even Point and Ratio Analysis: Analyzes fixed costs, variable costs, contribution margins, and break-even point.
  • Debt Service Coverage Ratio: Calculates the debt service coverage ratio to measure cash flow availability for debt repayment.
  • Capacity Utilisation and Wages: Discusses capacity utilisation of sales and provides details on wages per worker.
  • Assessment of Working Capital Fund: Computation of the maximum permissible bank finance for maintaining working capital funds.

PROJECT REPORT FOR FLOUR MILL

1 NAME OF THE ENTERPISES : SHRI TEGA KUMAR

2 CONSTITUTION : PROPRIETORSHIP

3 PROPRIETOR NAME : SHRI TEGA KUMAR

4 UNIT ADDRESS : Vill.Post Sakaldhia Railway Station


Kambhari,Dist. Chandauli

5 NAME OF THE PROJECT/ : SHRI TEGA KUMAR


BUSINESS ACTIVITY PROPOSED FLOUR MILL

6 COST OF PROJECT : 10 Lacs

7 MEANS OF FINANCE : Own Fund


Term Loan
Cash Credit

8 CURRENT RATIO : 1.32

9 PAY BACK PERIOD :


Cash Credit On Demand
Term Loan 05 YEAR/60 MONTH

10 BREAK EVEN POINT : 49.90%

11 NO. OF EMPOLOYEES :8

12 NET PROFIT RATIO 12.74%

13 DEBT EQUITY RATIO 0.96

14 AVERAGE DEBT SERVICE COVERAGE 4.45


RATIO

15 ESTIMATED ANNUAL RECEIPT TURNOVER (AT 100%) : 5192000


SHRI TEGA KUMAR
Address at :Vill.Post Sakaldhia Railway Station
Kambhari,Dist. Chandauli
PROJECT COST AND MEANS OF FINANCE

S. No. PARTICULARS Rs.

I PROPOSED COST OF PROJECT


Plant & Machinery 440,000.00
Furniture & Fixture 60,000.00
Working Capital 500,000.00

1,000,000.00

II MEANS OF FINANCE

A) Promoter's Contribution 50,000.00


B) Bank Finance
i) Term Loan 475,000.00
ii) Working Capital 475,000.00

III TOTAL 1,000,000.00


SHRI TEGA KUMAR
Address at :Vill.Post Sakaldhia Railway Station,Kambhari,Dist. Chandauli
Balance Sheet (Projected)
Estimated Projected Projected Projected Projected
Particulars
1 2 3 4 5
Liabilities
Capital 50,000.00 436,827.93 647,410.39 845,412.35 1,000,492.40
Add: Profit 396,827.93 435,582.46 503,001.97 580,080.05 638,051.27
446,827.93 872,410.39 1,150,412.35 1,425,492.40 1,638,543.67
Less: Drawings 10,000.00 225,000.00 305,000.00 425,000.00 480,000.00
436,827.93 647,410.39 845,412.35 1,000,492.40 1,158,543.67
Long Tern Liabilty
Term Loan 326,718.71 228,979.45 120,468.98 - -
Current Liabilty & Provision
Margin Subsidy Reserve A/c 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00
Working Capital Loan 475,000.00 475,000.00 475,000.00 475,000.00 475,000.00
Term Loan Instal. Pyable 88,037.26 97,739.27 108,510.47 120,468.97 -
within 12 month
Sundry Creditor for material 12,500.00 156,840.00 431,750.00 448,000.00 438,540.00
& Expenses

Total Liabilites 1,689,083.90 1,955,969.10 2,331,141.80 2,393,961.37 2,422,083.67


Assets
Gross Fixed Asset 500,000.00 464,000.00 397,250.00 340,227.50 291,501.88
Less: Depreciation 36,000.00 66,750.00 57,022.50 48,725.63 41,647.63
Net Fixed Asset 464,000.00 397,250.00 340,227.50 291,501.88 249,854.24
Current Assets
Closing Stock 152,000.00 305,000.00 355,000.00 395,000.00 365,000.00
Receivables 445,500.00 440,179.10 561,634.30 552,141.50 619,846.92
Loans & Advances 105,600.00 273,540.00 478,680.00 529,618.00 542,382.50
Margin Subsidy Reserve A/c 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00
Cash in bank/hand 171,983.90 190,000.00 245,600.00 275,700.00 295,000.00
Total Assets 1,689,083.90 1,955,969.10 2,331,141.80 2,393,961.38 2,422,083.66
- - - (0.00) 0.00
Note: The above financial statement is only estimate of future business transaction, prepared
on the basis of information provided by the proprietor. We do not vouch the accuracy of the same.

Prepared by-
For Jamuna Shukla & Associates
Chartered Accountants

Shruti Agrawal
Partner
Date : 15.09.2020
Place: Varanasi
SHRI TEGA KUMAR
Address at :Vill.Post Sakaldhia Railway Station,Kambhari,Dist. Chandauli

Profit & Loss Statement (Projected)

Year
Particulars 1 2 3 4 5

Sale of Saree 3,115,000.00 3,375,000.00 3,634,000.00 3,894,000.00 4,153,600.00


Closing Stock of FG 152,000.00 305,000.00 355,000.00 395,000.00 365,000.00

Total 3,267,000.00 3,680,000.00 3,989,000.00 4,289,000.00 4,518,600.00

Opening Stock of FG 152,000.00 305,000.00 355,000.00 395,000.00


Cost of Raw material Consumed 1,832,500.00 1,952,500.00 1,960,000.00 2,041,325.00 2,090,470.00
Consumables 205,000.00 215,000.00 236,500.00 260,150.00 266,165.00
Wages 320,000.00 352,000.00 389,000.00 428,000.00 472,000.00
Power,Fuel & Electricity 60,000.00 66,000.00 72,600.00 80,600.00 88,660.00
Freight & Cartage 18,000.00 19,800.00 21,780.00 24,950.00 27,450.00
Total 2,435,500.00 2,757,300.00 2,984,880.00 3,190,025.00 3,339,745.00

Gross Profit 831,500.00 922,700.00 1,004,120.00 1,098,975.00 1,178,855.00

Rent 144,000.00 158,400.00 174,560.00 192,500.00 212,000.00


Depreciation 36,000.00 66,750.00 57,022.50 48,725.63 41,647.63
Selling & Distribution Exps 54,000.00 59,400.00 65,340.00 71,870.00 79,600.00
Administrative Expenses 48,000.00 52,800.00 58,080.00 63,800.00 70,180.00
Advertisment Expenses 30,000.00 33,000.00 36,300.00 39,930.00 43,940.00
Interest on CC 49,875.00 49,875.00 49,875.00 49,875.00 49,875.00
Interest on Term Loan 47,797.07 39,392.54 29,690.53 18,919.33 6,961.10
Miscalleneous Expenses 25,000.00 27,500.00 30,250.00 33,275.00 36,600.00

Total 434,672.07 487,117.54 501,118.03 518,894.95 540,803.73

Net Profit 396,827.93 435,582.46 503,001.97 580,080.05 638,051.27

Note: The above financial statement is only estimate of future business transaction, prepared on the
basis of information provided by the proprietor. We do not vouch the accuracy of the same.

Prepared by-
For Jamuna Shukla & Associates
Chartered Accountants

Shruti Agrawal
Partner

Date : 15.09.2020
Place: Varanasi
TERM LOAN REPAYMENT SCHEDULE
Loan Amount 475,000.00
Repayment Period 60.00 Months
Rate of Interest 10.50% Yearly
Moratorium Period 3 months
Amount of Installment 10,619.15

REPAYMENT SCHEDULE & INTEREST CALCULATION OF LOAN


Month Opening Bal. Addition Installment Principal Interest Closing Bal.
1 - 475,000.00 4,156.25 - 4,156.25 475,000.00
2 475,000.00 - 4,156.25 4,156.25 475,000.00
3 475,000.00 4,156.25 4,156.25 475,000.00
4 475,000.00 10,619.15 6,462.90 4,156.25 468,537.10
5 468,537.10 10,619.15 6,519.45 4,099.70 462,017.65
6 462,017.65 10,619.15 6,576.50 4,042.65 455,441.15
7 455,441.15 10,619.15 6,634.04 3,985.11 448,807.11
8 448,807.11 10,619.15 6,692.09 3,927.06 442,115.03
9 442,115.03 10,619.15 6,750.64 3,868.51 435,364.38
10 435,364.38 10,619.15 6,809.71 3,809.44 428,554.67
11 428,554.67 10,619.15 6,869.30 3,749.85 421,685.37
12 421,685.37 10,619.15 6,929.40 3,689.75 414,755.97
13 414,755.97 10,619.15 6,990.04 3,629.11 407,765.94
14 407,765.94 10,619.15 7,051.20 3,567.95 400,714.74
15 400,714.74 10,619.15 7,112.90 3,506.25 393,601.84
16 393,601.84 10,619.15 7,175.13 3,444.02 386,426.71
17 386,426.71 10,619.15 7,237.92 3,381.23 379,188.79
18 379,188.79 10,619.15 7,301.25 3,317.90 371,887.54
19 371,887.54 10,619.15 7,365.13 3,254.02 364,522.41
20 364,522.41 10,619.15 7,429.58 3,189.57 357,092.83
21 357,092.83 10,619.15 7,494.59 3,124.56 349,598.24
22 349,598.24 10,619.15 7,560.17 3,058.98 342,038.08
23 342,038.08 10,619.15 7,626.32 2,992.83 334,411.76
24 334,411.76 10,619.15 7,693.05 2,926.10 326,718.71
25 326,718.71 10,619.15 7,760.36 2,858.79 318,958.35
26 318,958.35 10,619.15 7,828.26 2,790.89 311,130.09
27 311,130.09 10,619.15 7,896.76 2,722.39 303,233.33
28 303,233.33 10,619.15 7,965.86 2,653.29 295,267.47
29 295,267.47 10,619.15 8,035.56 2,583.59 287,231.91
30 287,231.91 10,619.15 8,105.87 2,513.28 279,126.04
31 279,126.04 10,619.15 8,176.80 2,442.35 270,949.24
32 270,949.24 10,619.15 8,248.34 2,370.81 262,700.90
33 262,700.90 10,619.15 8,320.52 2,298.63 254,380.38
34 254,380.38 10,619.15 8,393.32 2,225.83 245,987.06
35 245,987.06 10,619.15 8,466.76 2,152.39 237,520.29
36 237,520.29 10,619.15 8,540.85 2,078.30 228,979.45
37 228,979.45 10,619.15 8,615.58 2,003.57 220,363.87
38 220,363.87 10,619.15 8,690.97 1,928.18 211,672.90
39 211,672.90 10,619.15 8,767.01 1,852.14 202,905.89
40 202,905.89 10,619.15 8,843.72 1,775.43 194,062.17
41 194,062.17 10,619.15 8,921.11 1,698.04 185,141.06
42 185,141.06 10,619.15 8,999.17 1,619.98 176,141.89
43 176,141.89 10,619.15 9,077.91 1,541.24 167,063.99
44 167,063.99 10,619.15 9,157.34 1,461.81 157,906.65
45 157,906.65 10,619.15 9,237.47 1,381.68 148,669.18
46 148,669.18 10,619.15 9,318.29 1,300.86 139,350.88
47 139,350.88 10,619.15 9,399.83 1,219.32 129,951.05
48 129,951.05 10,619.15 9,482.08 1,137.07 120,468.98
49 120,468.98 10,619.15 9,565.05 1,054.10 110,903.93
50 110,903.93 10,619.15 9,648.74 970.41 101,255.19
51 101,255.19 10,619.15 9,733.17 885.98 91,522.02
52 91,522.02 10,619.15 9,818.33 800.82 81,703.69
53 81,703.69 10,619.15 9,904.24 714.91 71,799.45
54 71,799.45 10,619.15 9,990.90 628.25 61,808.54
55 61,808.54 10,619.15 10,078.33 540.82 51,730.22
56 51,730.22 10,619.15 10,166.51 452.64 41,563.71
57 41,563.71 10,619.15 10,255.47 363.68 31,308.24
58 31,308.24 10,619.15 10,345.20 273.95 20,963.04
59 20,963.04 10,619.15 10,435.72 183.43 10,527.31
60 10,527.31 10,619.15 10,527.31 92.11 0.00
SCHEDULE OF LOAN REPAYMENT

Repayment of Loan is worked out as under:

Particular 1 2 3 4 5

Opening Balance 475,000.00 414,755.97 326,718.71 228,979.45 120,468.98


Repayment 60,244.03 88,037.26 97,739.27 108,510.47 120,468.97
Closing Balance 414,755.97 326,718.71 228,979.45 120,468.98 0.00

WORKING CAPITAL LOAN

YEAR OPENING BALANCE CLOSING BALANCE INTEREST @ 10.50%

1 475,000.00 475,000.00 49,875.00


2 475,000.00 475,000.00 49,875.00
3 475,000.00 475,000.00 49,875.00
4 475,000.00 475,000.00 49,875.00
5 475,000.00 475,000.00 49,875.00
STATEMENT SHOWING DEPRECIATION ON FIXED ASSET

PARTICULARS RATE 1 2 3 4 5
OF
DEP.

Plant & Machinery 15%


Opening Balance - 407,000.00 345,950.00 294,057.50 249,948.88
Addition 440,000.00 - - - -
Depreciation 33,000.00 61,050.00 51,892.50 44,108.63 37,492.33

Closing Balance 407,000.00 345,950.00 294,057.50 249,948.88 212,456.54

Furniture & Fixture 10%


Opening Balance - 57,000.00 51,300.00 46,170.00 41,553.00
Addition 60,000.00 - - - -
Depreciation 3,000.00 5,700.00 5,130.00 4,617.00 4,155.30

57,000.00 51,300.00 46,170.00 41,553.00 37,397.70


Closing Balance 464,000.00 397,250.00 340,227.50 291,501.88 249,854.24
BREAK EVENT POINT AND RATIO ANALYSIS

PARTICULARS 1 2 3 4 5
Fixed Cost 241,672.07 247,667.54 254,125.53 261,294.33 268,836.10
Variable Cost 2,628,500.00 2,996,750.00 3,231,872.50 3,447,625.63 3,611,712.63
Total Cost 2,870,172.07 3,244,417.54 3,485,998.03 3,708,919.95 3,880,548.73
Gross receipt 3,115,000.00 3,375,000.00 3,634,000.00 3,894,000.00 4,153,600.00
Contribution (GR-VC) 486,500.00 378,250.00 402,127.50 446,374.38 541,887.37
BEP in % 49.68% 65.48% 63.20% 58.54% 49.61%
Inventory 152,000.00 305,000.00 355,000.00 395,000.00 365,000.00
Inventory Holding Period(in days) 19.33 34.31 37.17 38.87 34.33
TOL-TNW Ratio 2.87 2.02 1.76 1.39 1.09
Debt Equity Ratio 0.95 0.50 0.27 0.12 -
Gross Profit Ratio(In %) 26.69% 27.34% 27.63% 28.22% 28.38%
Net Profit Ratio(In %) 12.74% 12.91% 13.84% 14.90% 15.36%
Current Ratio 1.32 1.44 1.46 1.51 1.72
CALCULATION OF DEBT SERVICE COVERAGE RATIO

Particulars 1 2 3.00 4 5

Cash Accrual 432,827.93 502,332.46 560,024.47 628,805.67 679,698.90


Interest on Tern Loan 47,797.07 39,392.54 29,690.53 18,919.33 6,961.10

Total (A) 480,625.00 541,725.00 589,715.00 647,725.00 686,660.00

Repayment
Interest on Term Loan 47,797.07 39,392.54 29,690.53 18,919.33 6,961.10
Princpal Amount 60,244.03 88,037.26 97,739.27 108,510.47 120,468.97

Total (B) 108,041.10 127,429.80 127,429.80 127,429.80 127,430.07

DSCR (A/B) 4.45 4.25 4.63 5.08 5.39


Avg DSCR 4.76
Capacity Utilisation of Sales

Particulars/Year 1st 2nd 3rd 4th 5th


Capacity Utilisation 60% 65% 70% 75% 80%

Sales/Gross Receipt 3,115,000.00 3,375,000.00 3,634,000.00 3,894,000.00 4,153,600.00

WAGES
Particulars No. of Worker Wages Per Month Amount(Rs)
Wages 8 4000 320,000.00
ASSESSMENT OF WORKING CAPITAL FUND
COMPUTATION OF MAXIMUM PERMISSIBLE BANK FINANCE FOR WORKING CAPITAL

PBF As Per NCR Method 1

(i) Accepted Sales 3,115,000.00


(ii) Less: 25% of (i) 778,750.00
(iii) 5% of (i) 155,750.00
(iv) NWC 299,546.64
(v) PBF (ii-iii) 623,000.00
or ( ii-iv) 479,203.36
Whichever is less 479,203.36

PROJECT REPORT FOR FLOUR MILL
1 NAME OF THE ENTERPISES
: SHRI TEGA KUMAR
2 CONSTITUTION
: PROPRIETORSHIP
3 PROPRIETOR NAME
:
SHRI TEGA KUMAR
Address at :Vill.Post Sakaldhia Railway Station
Kambhari,Dist. Chandauli
             PROJECT COST AND MEANS
SHRI TEGA KUMAR
Address at :Vill.Post Sakaldhia Railway Station,Kambhari,Dist. Chandauli
Balance Sheet (Projected)
Particular
SHRI TEGA KUMAR
Address at :Vill.Post Sakaldhia Railway Station,Kambhari,Dist. Chandauli
Profit & Loss Statement (Projected)
TERM LOAN REPAYMENT SCHEDULE
Loan Amount
              475,000.00 
Repayment Period
                      60.00  Months 
Rate
SCHEDULE OF LOAN REPAYMENT
Repayment of Loan is worked out as under:
Particular
1 
2 
3 
4 
5 
Opening Balance
        475,00
STATEMENT SHOWING DEPRECIATION ON FIXED ASSET
PARTICULARS
RATE
1
2
3
4
5
OF
DEP.
Plant & Machinery
15%
Opening Balance
BREAK EVENT POINT AND RATIO ANALYSIS
PARTICULARS
1
2
3
4
5
Fixed Cost
         241,672.07         247,667.54         254,125.
CALCULATION OF DEBT SERVICE COVERAGE RATIO
Particulars
1
2
                        3.00 
4
5
Cash Accrual 
       432,827.93
Capacity Utilisation of Sales
Particulars/Year
1st
2nd
 3rd 
4th
5th
Capacity Utilisation
60%
65%
70%
75%
80%
Sales/Gross Rec