Structure RFI Status Summary For The Month of December-2021

This document provides a status summary of inspection requests (RFIs) for structural works during the month of December 2021. It lists 24 RFIs related to activities like checking of shuttering, reinforcement, and concrete pouring for structures like retaining walls, box culverts, and pier caps. The majority of the RFIs were approved on the same day as the inspection, with only one RFI related to checking of concrete pouring for a raft being noted as not approved.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
357 views11 pages

Structure RFI Status Summary For The Month of December-2021

This document provides a status summary of inspection requests (RFIs) for structural works during the month of December 2021. It lists 24 RFIs related to activities like checking of shuttering, reinforcement, and concrete pouring for structures like retaining walls, box culverts, and pier caps. The majority of the RFIs were approved on the same day as the inspection, with only one RFI related to checking of concrete pouring for a raft being noted as not approved.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Structure RFI Status Summary for the Month of December-2021

Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of Shuttering, Reinforcement and Pouring of RCC M-35 grade
GCL/STR/21-22/ 2384 21-Dec-21 9:00 AM MNB 14+710 - RHS Nos. 1 Not Approved 22-Dec-21
for MNB raft RA1
Checking of Reinforcement and Profile of MJB (Cast in Situ) PSC Outer
GCL/STR/21-22/ 2385 21-Dec-21 11:00 AM MJB 15+100 - LHS Nos. 1 Approved 22-Dec-21
Girder G-1/2 (LP1-LP2)
GCL/STR/21-22/ 2386 21-Dec-21 9:00 AM MJB Checking of Reinforcement and Profile of MJB PSC girder G-16 17+475 - - Nos. 1 Approved 22-Dec-21
Checking of Reinforcement, Shuttering & Pouring of RCC M-50 grade for
GCL/STR/21-22/ 2387 21-Dec-21 5:00 PM MJB 17+475 - - Nos. 1 Approved 22-Dec-21
MJB Pre-Cast PSC girder G-16
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2388 21-Dec-21 10:00 AM Box Culvert 19+110 - BHS Nos. 1 Approved 22-Dec-21
box culvert Wall final lift with top Haunch & Slab A1,A2
Checking of Reinforcement, Shuttring and Pouring of RCC M-35 grade for
GCL/STR/21-22/ 2389 21-Dec-21 12:00 PM Box Culvert 19+585 - LHS Nos. 1 Approved 22-Dec-21
box culvert wall 1st lift with Bottom haunch (A1&A2)
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2390 21-Dec-21 10:00 AM MNB 20+416 - BHS Nos. 1 Approved 22-Dec-21
grade for MNB Wall 5th lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2391 21-Dec-21 2:00 PM R.Wall 19+200 - RHS Nos. 1 Approved 22-Dec-21
grade for Box Culvert Return wall final Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2392 21-Dec-21 11:00 AM MNB 25+053 - RHS Nos. 1 Approved 22-Dec-21
grade for MNB Wall 2nd lift (RA2)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2393 21-Dec-21 4:00 PM R.Wall 130+600 130+620 RHS Rmt 20 Approved 22-Dec-21
Retaining Wall 1st Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2394 21-Dec-21 10:00 AM R.Wall 142+885 142+895 LHS Rmt 10 Approved 22-Dec-21
Retaining Wall 1st Lift
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2395 21-Dec-21 11:00 AM Block Wall 136+925 136+955 LHS Rmt 30 Approved 22-Dec-21
Block Wall final lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2396 21-Dec-21 12:00 PM R.Wall 16+590 16+602 LHS Rmt 12 Approved 22-Dec-21
Retaining Wall 5th lift.
Checking of Layout excavation, level and Laying of PCC M-15 for box
GCL/STR/21-22/ 2397 21-Dec-21 9:00 AM R.Wall 16+602 16+612 LHS Rmt 10 Approved 22-Dec-21
culvert Retaining wall.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2398 21-Dec-21 9:00 AM R.Wall 127+300 127+350 RHS Rmt 50 Approved 22-Dec-21
Retaining Wall 6th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2399 21-Dec-21 1:00 PM R.Wall 19+588 19+598 LHS Rmt 10 Approved 22-Dec-21
Retaining Wall 2nd lift.
Checking of Reinforcement, Shuttring, and Pouring of RCC M-35 grade
GCL/STR/21-22/ 2400 21-Dec-21 10:00 AM Box Culvert 132+007 - LHS Nos. 1 Approved 22-Dec-21
for box culvert Raft.
Checking of Shuttering,reinforcement and Pouring of concrete M-35 grade
GCL/STR/21-22/ 2401 21-Dec-21 1:00 PM R.Wall 152+553 152+563 RHS Rmt 10 Approved 22-Dec-21
Retaning Wall 3rd lift
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2402 21-Dec-21 12:00 PM Block Wall 155+428 155+464 LHS Rmt 36 Approved 22-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2403 21-Dec-21 9:00 AM Block Wall 136+955 136+965 LHS Rmt 10 Approved 22-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2404 21-Dec-21 5:00 PM Block Wall 136+965 136+980 LHS Rmt 15 Approved 22-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2405 21-Dec-21 9:00 AM Block Wall 20+120 20+140 RHS Rmt 20 Approved 22-Dec-21
Block Wall 3rd lift.
Checking of Reinforcement, shuttering and concrete pouring M-40 grade
GCL/STR/21-22/ 2406 21-Dec-21 5:00 PM Friction Slab 133+706 133+750 RHS Rmt 44 Approved 22-Dec-21
for Friction Slab Haunch RA2
Checking of Reinforcement, Shuttering & Pouring of Concrete RCC M-40
GCL/STR/21-22/ 2407 21-Dec-21 9:00 AM MNB 138+252 - RHS Nos. 1 Not Approved 22-Dec-21
grade for Inner and Outer Crash Barrier (A1-A2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2408 21-Dec-21 9:00 AM Block Wall 131+490 131+505 LHS Rmt 15 Approved 22-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2409 21-Dec-21 11:00 AM Block Wall 155+510 155+536 LHS Rmt 26 Approved 22-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2410 21-Dec-21 3:00 PM Block Wall 134+610 134+660 LHS Rmt 50 Approved 22-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2411 21-Dec-21 11:00 AM Block Wall 25+170 25+190 RHS Rmt 20 Approved 22-Dec-21
Block Wall 6th lift.

Page 1 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of Reinforcement, shuttering and concrete pouring M-30 grade
GCL/STR/21-22/ 2412 21-Dec-21 6:00 PM PUP 25+280 - RHS Nos. 1 Approved 22-Dec-21
for PUP Approch Slab A1
Checking of layout excavation, level and laying of PCC-M15 for Plum
GCL/STR/21-22/ 2413 21-Dec-21 10:00 AM Block Wall 134+874 134+936 LHS Rmt 62 Approved 22-Dec-21
Concrete Block Wall
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2414 21-Dec-21 10:00 AM Block Wall 131+515 131+520 LHS Rmt 5 Approved 22-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2415 21-Dec-21 10:00 AM Block Wall 134+678 134+698 RHS Rmt 20 Approved 22-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2416 21-Dec-21 10:00 AM Block Wall 138+410 138+430 LHS Rmt 20 Approved 22-Dec-21
Block Wall 1st lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2417 21-Dec-21 9:00 AM Block Wall 134+600 134+625 RHS Rmt 25 Approved 22-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2418 21-Dec-21 11:00 AM Block Wall 134+733 134+776 RHS Rmt 43 Approved 22-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2419 21-Dec-21 9:00 AM Block Wall 155+402 155+412 LHS Rmt 10 Approved 22-Dec-21
Block Wall 4th lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2420 21-Dec-21 12:00 PM R.Wall 131+694 - LHS Nos 1 Not Approved 22-Dec-21
grade for Box Culvert Return wall 3rd Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2421 21-Dec-21 10:00 AM G-S 142+568 - RHS Nos. 1 Not Approved 22-Dec-21
grade for GS Pier Cap (RP1)
Checking of Shuttering, Reinforcement and Pouring of RCC M-35 grade
GCL/STR/21-22/ 2422 22-Dec-21 9:00 AM MNB 14+710 - RHS Nos. 1 Approved 23-Dec-21
for MNB raft RA1
Checking of Reinforcement, Shuttering & Pouring of Concrete (M-50)
GCL/STR/21-22/ 2423 22-Dec-21 11:00 AM MJB 15+100 - LHS Nos. 1 Not Approved 23-Dec-21
Grade For MJB (Cast in Situ) PSC Outer Girder G-1/2 (LP1-LP2)
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-35
GCL/STR/21-22/ 2424 22-Dec-21 9:00 AM R.Wall 20+169 - LHS Nos. 1 Approved 23-Dec-21
grade for Box Culvert Return wall 2nd Lift
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2425 22-Dec-21 10:00 AM Block Wall 134+625 134+658 RHS Rmt 33 Approved 23-Dec-21
Block Wall 3rd lift.
Checking of Reinforcement, Shuttring and Pouring of RCC M-35 grade for
GCL/STR/21-22/ 2426 22-Dec-21 11:00 AM Box Culvert 19+585 - LHS Nos. 1 Not Approved 23-Dec-21
box culvert wall 2nd lift (A1&A2)
Checking of Reinforcement, Shuttering & Pouring of Concrete (M-40)
GCL/STR/21-22/ 2427 22-Dec-21 3:00 PM MNB 18+972 - RHS Nos. 1 Approved 23-Dec-21
Grade For MNB RCC End Cross Girder (RA1)
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2428 22-Dec-21 4:00 PM R.Wall 19+200 - LHS Nos. 1 Approved 23-Dec-21
grade for Box Culvert Return wall 4th Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2429 22-Dec-21 9:00 AM MNB 25+053 - RHS Nos. 1 Approved 23-Dec-21
grade for MNB Wall 3rd lift & Return wall 3rd Lift (RA2)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2430 22-Dec-21 4:00 PM R.Wall 130+600 130+620 RHS Rmt 20 Approved 23-Dec-21
Retaining Wall 2nd Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2431 22-Dec-21 12:00 PM R.Wall 142+885 142+895 LHS Rmt 10 Approved 23-Dec-21
Retaining Wall 2nd Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2432 22-Dec-21 11:00 AM MJB 24+635 - LHS Nos. 1 Not Approved 23-Dec-21
grade for MJB Pier cap (LP1)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2433 22-Dec-21 10:00 AM R.Wall 16+590 16+602 LHS Rmt 12 Approved 23-Dec-21
Retaining Wall 6th lift.
Checking of Shuttering,reinforcement and Pouring of concrete M-35 grade
GCL/STR/21-22/ 2434 22-Dec-21 10:00 AM R.Wall 16+602 16+612 LHS Rmt 10 Approved 23-Dec-21
Retaning Wall Raft
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2435 22-Dec-21 9:00 AM R.Wall 127+300 127+350 RHS Rmt 50 Approved 23-Dec-21
Retaining Wall 7th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2436 22-Dec-21 1:00 PM R.Wall 19+588 19+598 LHS Rmt 10 Approved 23-Dec-21
Retaining Wall 3rd lift.
Checking of Reinforcement, Shuttring and Pouring of RCC M-35 grade for
GCL/STR/21-22/ 2437 22-Dec-21 12:00 PM Box Culvert 132+007 - LHS Nos. 1 Approved 23-Dec-21
box culvert wall 1st lift with Bottom haunch (A1&A2)
Checking of Shuttering,reinforcement and Pouring of concrete M-35 grade
GCL/STR/21-22/ 2438 22-Dec-21 9:00 AM R.Wall 152+553 152+563 RHS Rmt 10 Approved 23-Dec-21
Retaning Wall 4th lift
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2439 22-Dec-21 9:00 AM Block Wall 155+428 155+464 LHS Rmt 36 Approved 23-Dec-21
Block Wall 3rd lift.

Page 2 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2440 22-Dec-21 1:00 PM Block Wall 136+955 136+965 LHS Rmt 10 Approved 23-Dec-21
Block Wall 3rd lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2441 22-Dec-21 9:00 AM MJB 20+800 - LHS Nos. 1 Not Approved 23-Dec-21
grade for MJB Pier cap (LP2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2442 22-Dec-21 10:00 AM Block Wall 20+120 20+140 RHS Rmt 20 Approved 23-Dec-21
Block Wall 4th lift.
Checking of Reinforcement, Shuttering & Pouring of Concrete RCC M-40
GCL/STR/21-22/ 2443 22-Dec-21 9:00 AM MNB 138+252 - RHS Nos. 1 Approved 23-Dec-21
grade for Inner and Outer Crash Barrier (A1-A2)
GCL/STR/21-22/ 2444 22-Dec-21 9:00 AM Pipe Culvert Laying of GSB Material for pipe Bedding 22+798 - LHS Nos. 1 Approved 23-Dec-21
GCL/STR/21-22/ 2445 22-Dec-21 6:00 PM Pipe Culvert Checking of Pipe laying and jointing NP.4 Hume Pipe of 1200 mm dia 22+798 - LHS Nos. 1 Approved 23-Dec-21
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2446 22-Dec-21 11:00 AM Block Wall 134+610 134+660 LHS Rmt 50 Approved 23-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2447 22-Dec-21 9:00 AM Block Wall 25+170 25+190 RHS Rmt 20 Approved 23-Dec-21
Block Wall final lift.
Checking of layout excavation, level and laying of PCC M-15 for PUP
GCL/STR/21-22/ 2448 22-Dec-21 11:00 AM PUP 25+280 - RHS Nos. 1 Not Approved 23-Dec-21
Approach slab (A2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2449 22-Dec-21 10:00 AM Block Wall 134+874 134+936 LHS Rmt 62 Approved 23-Dec-21
Block Wall 1st lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2450 22-Dec-21 12:00 PM Block Wall 131+515 131+520 LHS Rmt 5 Approved 23-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2451 22-Dec-21 10:00 AM Block Wall 134+678 134+698 RHS Rmt 20 Not Approved 23-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2452 22-Dec-21 11:00 AM Block Wall 138+410 138+430 LHS Rmt 20 Approved 23-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2453 22-Dec-21 10:00 AM Block Wall 134+600 134+625 RHS Rmt 25 Approved 23-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2454 22-Dec-21 11:00 AM Block Wall 134+733 134+776 RHS Rmt 43 Approved 23-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2455 22-Dec-21 2:00 PM Block Wall 155+402 155+412 LHS Rmt 10 Approved 23-Dec-21
Block Wall final lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2456 22-Dec-21 12:00 PM R.Wall 131+694 - LHS Nos 1 Approved 23-Dec-21
grade for Box Culvert Return wall 3rd Lift
Checking of reinforcement, shuttering and pouring of RCC M-30 grade for
GCL/STR/21-22/ 2457 22-Dec-21 10:00 AM G-S 142+568 - RHS Nos. 1 Not Approved 23-Dec-21
G-S Pier Shaft 2nd Lift LP1
Checking of Reinforcement and Profile of MJB (Cast in Situ) Outer PSC
GCL/STR/21-22/ 2458 23-Dec-21 9:00 AM MJB 17+475 - LHS Nos. 1 Not Approved 24-Dec-21
girder G1/2 (LP4-LP5)
Checking of Reinforcement and Profile of MJB (Cast in Situ) Inner PSC
GCL/STR/21-22/ 2459 23-Dec-21 11:00 AM MJB 17+475 - LHS Nos. 1 Not Approved 24-Dec-21
girder G1/2 (LP4-LP5)
Checking of Reinforcement, Shuttering & Pouring of Concrete (M-50)
GCL/STR/21-22/ 2460 23-Dec-21 9:00 AM MJB 15+100 - LHS Nos. 1 Approved 24-Dec-21
Grade For MJB (Cast in Situ) PSC Outer Girder G-1/2 (LP1-LP2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2461 23-Dec-21 11:00 AM Block Wall 134+625 134+658 RHS Rmt 33 Approved 24-Dec-21
Block Wall 4th lift.
Checking of Reinforcement, Shuttring and Pouring of RCC M-35 grade for
GCL/STR/21-22/ 2462 23-Dec-21 11:00 AM Box Culvert 19+585 - LHS Nos. 1 Approved 24-Dec-21
box culvert wall 2nd lift (A1&A2)
Checking of Reinforcement, Shuttering & Pouring of Concrete (M-40)
GCL/STR/21-22/ 2463 23-Dec-21 9:00 AM MNB 18+972 - RHS Nos. 1 Approved 24-Dec-21
Grade For MNB RCC End Cross Girder (RA2)
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2464 23-Dec-21 10:00 AM R.Wall 19+200 - LHS Nos. 1 Not Approved 24-Dec-21
grade for Box Culvert Return wall 5th Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2465 23-Dec-21 11:00 AM MNB 25+053 - RHS Nos. 1 Approved 24-Dec-21
grade for MNB Wall 4th lift & Return wall 4th Lift (RA2)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2466 23-Dec-21 4:00 PM R.Wall 130+600 130+620 RHS Rmt 20 Approved 24-Dec-21
Retaining Wall 3rd Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2467 23-Dec-21 11:00 AM MJB 24+635 - LHS Nos. 1 Approved 24-Dec-21
grade for MJB Pier cap (LP1)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2468 23-Dec-21 12:00 PM R.Wall 16+590 16+602 LHS Rmt 12 Approved 24-Dec-21
Retaining Wall 7th lift.

Page 3 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2469 23-Dec-21 9:00 AM R.Wall 16+602 16+612 LHS Rmt 10 Approved 24-Dec-21
Retaining Wall 1st lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2470 23-Dec-21 10:00 AM R.Wall 127+300 127+350 RHS Rmt 50 Not Approved 24-Dec-21
Retaining Wall Final lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2471 23-Dec-21 2:00 PM R.Wall 19+588 19+598 LHS Rmt 10 Approved 24-Dec-21
Retaining Wall Final lift.
Checking of Reinforcement, Shuttring and Pouring of RCC M-35 grade for
GCL/STR/21-22/ 2472 23-Dec-21 10:00 AM Box Culvert 132+007 - LHS Nos. 1 Not Approved 24-Dec-21
box culvert wall 2nd lift (A1&A2)
Checking of Shuttering,reinforcement and Pouring of concrete M-35 grade
GCL/STR/21-22/ 2473 23-Dec-21 10:00 AM R.Wall 152+553 152+563 RHS Rmt 10 Approved 24-Dec-21
Retaning Wall 5th lift
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2474 23-Dec-21 1:00 PM Block Wall 155+428 155+464 LHS Rmt 36 Approved 24-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2475 23-Dec-21 10:00 AM Block Wall 136+955 136+965 LHS Rmt 10 Approved 24-Dec-21
Block Wall 4th lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2476 23-Dec-21 9:00 AM MJB 20+800 - LHS Nos. 1 Approved 24-Dec-21
grade for MJB Pier cap (LP2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2477 23-Dec-21 12:00 PM Block Wall 20+120 20+140 RHS Rmt 20 Approved 24-Dec-21
Block Wall final lift.
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2478 23-Dec-21 10:00 AM Pipe Culvert 22+798 - LHS Nos. 1 Not Approved 24-Dec-21
grade for Pipe culvert Head wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2479 23-Dec-21 10:00 AM Block Wall 126+650 126+700 LHS Rmt 50 Approved 24-Dec-21
Block Wall
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2480 23-Dec-21 9:00 AM Block Wall 134+610 134+660 LHS Rmt 50 Not Approved 24-Dec-21
Block Wall 5th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2481 23-Dec-21 9:00 AM Block Wall 134+658 134+678 RHS Rmt 20 Approved 24-Dec-21
Block Wall 3rd lift.
Checking of layout excavation, level and laying of PCC M-15 for PUP
GCL/STR/21-22/ 2482 23-Dec-21 11:00 AM PUP 25+280 - RHS Nos. 1 Not Approved 24-Dec-21
Approach slab (A2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2483 23-Dec-21 11:00 AM Block Wall 134+874 134+936 LHS Rmt 62 Approved 24-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2484 23-Dec-21 11:00 AM Block Wall 131+515 131+520 LHS Rmt 5 Approved 24-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2485 23-Dec-21 10:00 AM Block Wall 134+678 134+698 RHS Rmt 20 Not Approved 24-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2486 23-Dec-21 9:00 AM Block Wall 138+410 138+430 LHS Rmt 20 Approved 24-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2487 23-Dec-21 9:00 AM Block Wall 134+600 134+625 RHS Rmt 25 Approved 24-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2488 23-Dec-21 2:00 PM Block Wall 134+698 134+733 RHS Rmt 35 Approved 24-Dec-21
Block Wall 2nd lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2489 23-Dec-21 10:00 AM R.Wall 131+694 - LHS Nos 1 Not Approved 24-Dec-21
grade for Box Culvert Return wall 4th Lift
Checking of reinforcement, shuttering and pouring of RCC M-30 grade for
GCL/STR/21-22/ 2490 23-Dec-21 10:00 AM G-S 142+568 - LHS Nos. 1 Approved 24-Dec-21
G-S Pier Shaft Final Lift LP1
Checking of Reinforcement and Profile of MJB (Cast in Situ) Outer PSC
GCL/STR/21-22/ 2491 24-Dec-21 9:00 AM MJB 17+475 - LHS Nos. 1 Approved 25-Dec-21
girder G1/2 (LP4-LP5)
Checking of Reinforcement and Profile of MJB (Cast in Situ) Inner PSC
GCL/STR/21-22/ 2492 24-Dec-21 10:00 AM MJB 17+475 - LHS Nos. 1 Approved 25-Dec-21
girder G1/2 (LP4-LP5)
Checking of Reinforcement and Profile of MJB (Cast in Situ) Inner PSC
GCL/STR/21-22/ 2493 24-Dec-21 11:00 AM MJB 17+475 - LHS Nos. 1 Approved 25-Dec-21
girder G2/2 (LP4-LP5)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2494 24-Dec-21 12:00 PM Block Wall 134+625 134+658 RHS Rmt 33 Approved 25-Dec-21
Block Wall final lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2495 24-Dec-21 10:00 AM R.Wall 19+200 - LHS Nos. 1 Approved 25-Dec-21
grade for Box Culvert Return wall 5th Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2496 24-Dec-21 9:00 AM MNB 25+053 - RHS Nos. 1 Approved 25-Dec-21
grade for MNB Wall 5th lift & Return wall 5th Lift (RA2)

Page 4 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2497 24-Dec-21 10:00 AM R.Wall 130+600 130+620 RHS Rmt 20 Approved 25-Dec-21
Retaining Wall 4th Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2498 24-Dec-21 9:00 AM MJB 24+635 - RHS Nos. 1 Not Approved 25-Dec-21
grade for MJB Pier cap (RP1)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2499 24-Dec-21 11:00 AM R.Wall 16+590 16+602 LHS Rmt 12 Not Approved 25-Dec-21
Retaining Wall 8th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2500 24-Dec-21 3:00 PM R.Wall 16+602 16+612 LHS Rmt 10 Approved 25-Dec-21
Retaining Wall 2nd lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2501 24-Dec-21 10:00 AM R.Wall 127+300 127+350 RHS Rmt 50 Approved 25-Dec-21
Retaining Wall Final lift.
Checking of Reinforcement, Shuttring and Pouring of RCC M-35 grade for
GCL/STR/21-22/ 2502 24-Dec-21 10:00 AM Box Culvert 132+007 - LHS Nos. 1 Approved 25-Dec-21
box culvert wall 2nd lift (A1&A2)
Checking of Shuttering,reinforcement and Pouring of concrete M-35 grade
GCL/STR/21-22/ 2503 24-Dec-21 12:00 PM R.Wall 152+553 152+563 RHS Rmt 10 Approved 25-Dec-21
Retaning Wall 6th lift
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2504 24-Dec-21 10:00 AM Block Wall 155+428 155+464 LHS Rmt 36 Approved 25-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2505 24-Dec-21 1:00 PM Block Wall 136+955 136+965 LHS Rmt 10 Approved 25-Dec-21
Block Wall final lift.
Checking of layout excavation, level and laying of PCC-M15 for Plum
GCL/STR/21-22/ 2506 24-Dec-21 12:00 PM Block Wall 26+075 26+095 RHS Rmt 20 Approved 25-Dec-21
Concrete Block Wall
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2507 24-Dec-21 10:00 AM Pipe Culvert 22+798 - LHS Nos. 1 Not Approved 25-Dec-21
grade for Pipe culvert Head wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2508 24-Dec-21 12:00 PM Block Wall 126+650 126+700 LHS Rmt 50 Approved 25-Dec-21
Block Wall 1st lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2509 24-Dec-21 10:00 AM Block Wall 134+610 134+660 LHS Rmt 50 Approved 25-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2510 24-Dec-21 3:00 PM Block Wall 134+658 134+678 RHS Rmt 20 Approved 25-Dec-21
Block Wall 4th lift.
Checking of layout excavation, level and laying of PCC M-15 for PUP
GCL/STR/21-22/ 2511 24-Dec-21 11:00 AM PUP 25+280 - RHS Nos. 1 Approved 25-Dec-21
Approach slab (A2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2512 24-Dec-21 1:00 PM Block Wall 134+874 134+936 LHS Rmt 62 Approved 25-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2513 24-Dec-21 9:00 AM Block Wall 131+505 131+520 LHS Rmt 15 Approved 25-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2514 24-Dec-21 10:00 AM Block Wall 134+678 134+698 RHS Rmt 20 Approved 25-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2515 24-Dec-21 3:00 PM Block Wall 138+410 138+430 LHS Rmt 20 Approved 25-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2516 24-Dec-21 9:00 AM Block Wall 134+733 134+776 RHS Rmt 43 Approved 25-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2517 24-Dec-21 11:00 AM Block Wall 134+698 134+733 RHS Rmt 35 Approved 25-Dec-21
Block Wall 3rd lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2518 24-Dec-21 10:00 AM R.Wall 131+694 - LHS Nos 1 Approved 25-Dec-21
grade for Box Culvert Return wall 4th Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2519 24-Dec-21 10:00 AM G-S 142+568 - LHS Nos. 1 Not Approved 25-Dec-21
grade for GS Pier Cap (LP1)
Checking of Reinforcement, Shuttering & Pouring of Concrete (M-50)
GCL/STR/21-22/ 2520 25-Dec-21 9:00 AM MJB 17+475 - LHS Nos. 1 Approved 26-Dec-21
Grade For MJB (Cast in Situ) Outer PSC Girder G1/2 (LP4-LP5)
Checking of Reinforcement, Shuttering & Pouring of Concrete (M-50)
GCL/STR/21-22/ 2521 25-Dec-21 10:00 AM MJB 17+475 - LHS Nos. 1 Approved 26-Dec-21
Grade For MJB (Cast in Situ) Inner PSC Girder G2/2 (LP4-LP5)
Checking of Reinforcement, Shuttering & Pouring of Concrete (M-50)
GCL/STR/21-22/ 2522 25-Dec-21 11:00 AM MJB 17+475 - LHS Nos. 1 Approved 26-Dec-21
Grade For MJB (Cast in Situ) Outer PSC Girder G2/2 (LP4-LP5)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2523 25-Dec-21 12:00 PM R.Wall 142+885 142+895 LHS Rmt 10 Not Approved 26-Dec-21
Retaining Wall 3rd Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2524 25-Dec-21 3:00 PM R.Wall 19+200 - LHS Nos. 1 Not Approved 26-Dec-21
grade for Box Culvert Return wall final Lift

Page 5 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2525 25-Dec-21 12:00 PM MNB 25+053 - RHS Nos. 1 Approved 26-Dec-21
grade for MNB Wall final lift( RA2)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2526 25-Dec-21 9:00 AM R.Wall 130+600 130+620 RHS Rmt 20 Approved 26-Dec-21
Retaining Wall 5th Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2527 25-Dec-21 9:00 AM MJB 01+085 - BHS Nos. 1 Not Approved 26-Dec-21
grade for MJB Abutment shaft final Lift P6 (ACC Link Road)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2528 25-Dec-21 12:00 PM R.Wall 16+590 16+602 LHS Rmt 12 Approved 26-Dec-21
Retaining Wall final lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2529 25-Dec-21 10:00 AM R.Wall 16+602 16+612 LHS Rmt 10 Approved 26-Dec-21
Retaining Wall 3rd lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2530 25-Dec-21 10:00 AM R.Wall 136+360 136+370 RHS Rmt 10 Not Approved 26-Dec-21
Retaining Wall 5th Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2531 25-Dec-21 10:00 AM R.Wall 136+370 136+380 RHS Rmt 10 Approved 26-Dec-21
Retaining Wall 4th Lift
Checking of Shuttering,reinforcement and Pouring of concrete M-35 grade
GCL/STR/21-22/ 2532 25-Dec-21 10:00 AM R.Wall 152+553 152+563 RHS Rmt 10 Approved 26-Dec-21
Retaning Wall final lift
Checking of layout excavation, level and laying of PCC-M15 for Plum
GCL/STR/21-22/ 2533 25-Dec-21 10:00 AM Block Wall 131+020 131+030 LHS Rmt 10 Approved 26-Dec-21
Concrete Block Wall
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-40
GCL/STR/21-22/ 2534 25-Dec-21 1:00 PM VUP 139+680 - BHS Nos. 1 Not Approved 26-Dec-21
grade vup for Outer Crash Barrier
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2535 25-Dec-21 10:00 AM Block Wall 26+075 26+095 RHS Rmt 20 Approved 26-Dec-21
Block Wall 1st lift.
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-40
GCL/STR/21-22/ 2536 25-Dec-21 10:00 AM Pipe Culvert 133+660 133+720 LHS Rmt 60 Not Approved 26-Dec-21
grade Friction Slab Crash Barrier
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2537 25-Dec-21 11:00 AM Block Wall 126+650 126+700 LHS Rmt 50 Approved 26-Dec-21
Block Wall 2nd lift.
Checking of layout excavation, level and laying of PCC-M15 for Plum
GCL/STR/21-22/ 2538 25-Dec-21 10:00 AM Block Wall 20+450 20+500 RHS Rmt 50 Approved 26-Dec-21
Concrete Block Wall
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2539 25-Dec-21 11:00 AM Block Wall 134+658 134+678 RHS Rmt 20 Approved 26-Dec-21
Block Wall final lift.
Checking of layout excavation, level and laying of PCC-M15 for Plum
GCL/STR/21-22/ 2540 25-Dec-21 11:00 AM Block Wall 26+095 26+105 RHS Rmt 10 Approved 26-Dec-21
Concrete Block Wall
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2541 25-Dec-21 3:00 PM Block Wall 134+874 134+936 LHS Rmt 62 Approved 26-Dec-21
Block Wall 4th lift.
Checking of Layout excavation, level and Laying of PCC M-15 for pipe
GCL/STR/21-22/ 2542 25-Dec-21 9:00 AM Pipe Culvert 137+220 - RHS Nos. 1 Approved 26-Dec-21
culvert Head Wall
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2543 25-Dec-21 1:00 PM Block Wall 134+678 134+698 RHS Rmt 20 Approved 26-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2544 25-Dec-21 10:00 AM Block Wall 138+410 138+430 LHS Rmt 20 Approved 26-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2545 25-Dec-21 12:00 PM Block Wall 134+733 134+776 RHS Rmt 43 Approved 26-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2546 25-Dec-21 4:00 PM Block Wall 134+698 134+733 RHS Rmt 35 Approved 26-Dec-21
Block Wall 4th lift.
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2547 25-Dec-21 10:00 AM Pipe Culvert 22+798 - LHS Nos. 1 Approved 26-Dec-21
grade for Pipe culvert Head wall 2nd lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2548 25-Dec-21 9:00 AM G-S 142+568 - LHS Nos. 1 Not Approved 26-Dec-21
grade for GS Pier Cap (LP1)
Checking of Shuttering, Reinforcement and Pouring of RCC M-(30) grade
GCL/STR/21-22/ 2549 25-Dec-21 12:00 PM Box Culvert 151+380 - RHS Nos. 1 Approved 26-Dec-21
for box culvert Slab
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2550 25-Dec-21 3:00 PM MJB 24+635 - RHS Nos. 1 Not Approved 26-Dec-21
grade for MJB Pier cap (RP1)
GCL/STR/21-22/ 2551 26-Dec-21 9:00 AM MJB Checking of Reinforcement and Profile of MJB PSC girder G-17 17+475 - - Nos. 1 Approved 27-Dec-21
Checking of Reinforcement, Shuttering & Pouring of RCC M-50 grade for
GCL/STR/21-22/ 2552 26-Dec-21 5:00 PM MJB 17+475 - - Nos. 1 Approved 27-Dec-21
MJB Pre-Cast PSC girder G-17

Page 6 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of Shuttering, Reinforcement and Pouring of RCC M-35 grade
GCL/STR/21-22/ 2553 26-Dec-21 11:00 AM MNB 14+710 - LHS Nos. 1 Not Approved 27-Dec-21
for MNB raft LA1
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2554 26-Dec-21 12:00 PM R.Wall 142+885 142+895 LHS Rmt 10 Approved 27-Dec-21
Retaining Wall 3rd Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2555 26-Dec-21 3:00 PM R.Wall 19+200 - LHS Nos. 1 Not Approved 27-Dec-21
grade for Box Culvert Return wall final Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2556 26-Dec-21 12:00 PM MNB 20+416 - BHS Nos. 1 Not Approved 27-Dec-21
grade for MNB Wall final lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2557 26-Dec-21 11:00 AM R.Wall 130+600 130+620 RHS Rmt 20 Approved 27-Dec-21
Retaining Wall final Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2558 26-Dec-21 9:00 AM MJB 01+085 - BHS Nos. 1 Not Approved 27-Dec-21
grade for MJB Abutment shaft final Lift P6 (ACC Link Road)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2559 26-Dec-21 12:00 PM R.Wall 16+602 16+612 LHS Rmt 10 Approved 27-Dec-21
Retaining Wall 4th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2560 26-Dec-21 10:00 AM R.Wall 136+360 136+370 RHS Rmt 10 Approved 27-Dec-21
Retaining Wall 5th Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2561 26-Dec-21 12:00 PM R.Wall 136+370 136+380 RHS Rmt 10 Approved 27-Dec-21
Retaining Wall 5th Lift
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2562 26-Dec-21 9:00 AM Block Wall 131+020 131+030 LHS Rmt 10 Approved 27-Dec-21
Block Wall 1st lift.
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-40
GCL/STR/21-22/ 2563 26-Dec-21 1:00 PM VUP 139+680 - BHS Nos. 1 Approved 27-Dec-21
grade vup for Outer Crash Barrier
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2564 26-Dec-21 11:00 AM Block Wall 26+075 26+095 RHS Rmt 20 Approved 27-Dec-21
Block Wall 2nd lift.
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-40
GCL/STR/21-22/ 2565 26-Dec-21 10:00 AM Friction Slab 133+660 133+720 LHS Rmt 60 Approved 27-Dec-21
grade Friction Slab Crash Barrier
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2566 26-Dec-21 9:00 AM Block Wall 126+650 126+700 LHS Rmt 50 Approved 27-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2567 26-Dec-21 2:00 PM Block Wall 20+450 20+500 RHS Rmt 50 Approved 27-Dec-21
Block Wall 1st lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2568 26-Dec-21 10:00 AM Block Wall 26+095 26+105 RHS Rmt 10 Approved 27-Dec-21
Block Wall 1st lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2569 26-Dec-21 9:00 AM Block Wall 134+874 134+936 LHS Rmt 62 Approved 27-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2570 26-Dec-21 10:00 AM Block Wall 134+678 134+698 RHS Rmt 20 Approved 27-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2571 26-Dec-21 9:00 AM Block Wall 134+698 134+733 RHS Rmt 35 Approved 27-Dec-21
Block Wall final lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2572 26-Dec-21 9:00 AM G-S 142+568 - LHS Nos. 1 Not Approved 27-Dec-21
grade for GS Pier Cap (LP1)
GCL/STR/21-22/ 2573 27-Dec-21 9:00 AM MJB Checking of Reinforcement and Profile of MJB PSC girder G-18 17+475 - - Nos. 1 Approved 28-Dec-21
Checking of Reinforcement, Shuttering & Pouring of RCC M-50 grade for
GCL/STR/21-22/ 2574 27-Dec-21 5:00 PM MJB 17+475 - - Nos. 1 Approved 28-Dec-21
MJB Pre-Cast PSC girder G-18
Checking of Shuttering, Reinforcement and Pouring of RCC M-35 grade
GCL/STR/21-22/ 2575 27-Dec-21 11:00 AM MNB 14+710 - LHS Nos. 1 Not Approved 28-Dec-21
for MNB raft LA1
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2576 27-Dec-21 12:00 PM R.Wall 142+885 142+895 LHS Rmt 10 Approved 28-Dec-21
Retaining Wall final Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-25
GCL/STR/21-22/ 2577 27-Dec-21 3:00 PM R.Wall 19+200 - LHS Nos. 1 Approved 28-Dec-21
grade for Box Culvert Return wall final Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2578 27-Dec-21 12:00 PM MNB 20+416 - BHS Nos. 1 Not Approved 28-Dec-21
grade for MNB Wall final lift with top haunch & slab A1,A2
Checking of Layout excavation, Level and Laying of PCC M-15 for box
GCL/STR/21-22/ 2579 27-Dec-21 11:00 AM Box Culvert 158+464 - LHS Nos. 1 Approved 28-Dec-21
culvert.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2580 27-Dec-21 9:00 AM MJB 01+085 - BHS Nos. 1 Approved 28-Dec-21
grade for MJB Abutment shaft final Lift A2 (ACC Link Road)

Page 7 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of reinforcement, shuttering and pouring of RCC M-25 grade for
GCL/STR/21-22/ 2581 27-Dec-21 12:00 PM C.F.Wall 22+770 22+780 LHS Rmt 10 Not Approved 28-Dec-21
Stem and Counterfort wall 9th lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2582 27-Dec-21 12:00 PM R.Wall 16+602 16+612 LHS Rmt 10 Approved 28-Dec-21
Retaining Wall 5th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2583 27-Dec-21 10:00 AM R.Wall 136+360 136+370 RHS Rmt 10 Approved 28-Dec-21
Retaining Wall 6th Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2584 27-Dec-21 12:00 PM R.Wall 136+370 136+380 RHS Rmt 10 Approved 28-Dec-21
Retaining Wall 6th Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2585 27-Dec-21 10:00 AM Box Culvert 19+585 - LHS Nos. 1 Not Approved 28-Dec-21
box culvert Wall final lift with top Haunch & Slab A1,A2
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2586 27-Dec-21 9:00 AM Block Wall 131+020 131+030 LHS Rmt 10 Not Approved 28-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2587 27-Dec-21 11:00 AM Block Wall 26+075 26+095 RHS Rmt 20 Approved 28-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2588 27-Dec-21 9:00 AM Block Wall 126+650 126+700 LHS Rmt 50 Approved 28-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2589 27-Dec-21 2:00 PM Block Wall 20+450 20+500 RHS Rmt 50 Approved 28-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2590 27-Dec-21 10:00 AM Block Wall 26+095 26+105 RHS Rmt 10 Approved 28-Dec-21
Block Wall 2nd lift.
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2591 27-Dec-21 12:00 PM Pipe Culvert 137+220 - RHS Nos. 1 Approved 28-Dec-21
grade for Pipe culvert Head wall 1st lift.
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2592 27-Dec-21 10:00 AM Pipe Culvert 22+798 - LHS Nos. 1 Approved 28-Dec-21
grade for Pipe culvert Head wall 3rd lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2593 27-Dec-21 9:00 AM G-S 142+568 - LHS Nos. 1 Approved 28-Dec-21
grade for GS Pier Cap (LP1)
GCL/STR/21-22/ 2594 28-Dec-21 9:00 AM MJB Checking of Reinforcement and Profile of MJB PSC girder G-19 17+475 - - Nos. 1 Approved 29-Dec-21
Checking of Reinforcement, Shuttering & Pouring of RCC M-50 grade for
GCL/STR/21-22/ 2595 28-Dec-21 5:00 PM MJB 17+475 - - Nos. 1 Approved 29-Dec-21
MJB Pre-Cast PSC girder G-19
Checking of Shuttering, Reinforcement and Pouring of RCC M-35 grade
GCL/STR/21-22/ 2596 28-Dec-21 11:00 AM MNB 14+710 - LHS Nos. 1 Approved 29-Dec-21
for MNB raft LA1
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2597 28-Dec-21 12:00 PM Block Wall 131+020 131+030 LHS Rmt 10 Approved 29-Dec-21
Block Wall 2nd lift.
GCL/STR/21-22/ 2598 28-Dec-21 3:00 PM MJB Checking Launching of RCC Girder for MJB RP2 to RA2. 16+475 - RHS Nos. 1 Approved 29-Dec-21
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2599 28-Dec-21 12:00 PM MNB 20+416 - BHS Nos. 1 Approved 29-Dec-21
grade for MNB Wall final lift with top haunch & slab A1,A2
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2600 28-Dec-21 11:00 AM Box Culvert 132+007 - LHS Nos. 1 Not Approved 29-Dec-21
box culvert Wall final lift with top Haunch & Slab A1,A2
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2601 28-Dec-21 9:00 AM MJB 01+085 - BHS Nos. 1 Approved 29-Dec-21
grade for MJB Pier shaft 7th Lift P6 (ACC Link Road)
Checking of reinforcement, shuttering and pouring of RCC M-25 grade for
GCL/STR/21-22/ 2602 28-Dec-21 12:00 PM C.F.Wall 22+770 22+780 LHS Rmt 10 Approved 29-Dec-21
Stem and Counterfort wall 9th lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2603 28-Dec-21 9:00 AM MJB 24+635 - RHS Nos. 1 Not Approved 29-Dec-21
grade for MJB Pier cap (RP1)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2604 28-Dec-21 12:00 PM R.Wall 16+602 16+612 LHS Rmt 10 Approved 29-Dec-21
Retaining Wall 6th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2605 28-Dec-21 10:00 AM R.Wall 136+360 136+370 RHS Rmt 10 Approved 29-Dec-21
Retaining Wall 7th Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2606 28-Dec-21 9:00 AM R.Wall 136+370 136+380 RHS Rmt 10 Approved 29-Dec-21
Retaining Wall 7th Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2607 28-Dec-21 10:00 AM Box Culvert 19+585 - LHS Nos. 1 Approved 29-Dec-21
box culvert Wall final lift with top Haunch & Slab A1,A2
Checking of layout excavation, level and laying of PCC-M15 for Plum
GCL/STR/21-22/ 2608 28-Dec-21 9:00 AM Block Wall 130+710 130+730 LHS Rmt 20 Approved 29-Dec-21
Concrete Block Wall
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2609 28-Dec-21 9:00 AM Block Wall 26+075 26+095 RHS Rmt 20 Approved 29-Dec-21
Block Wall 4th lift.

Page 8 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2610 28-Dec-21 12:00 PM Block Wall 126+650 126+700 LHS Rmt 50 Approved 29-Dec-21
Block Wall final lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2611 28-Dec-21 10:00 AM Block Wall 20+450 20+500 RHS Rmt 50 Not Approved 29-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2612 28-Dec-21 11:00 AM Block Wall 26+095 26+105 RHS Rmt 10 Approved 29-Dec-21
Block Wall 3rd lift.
GCL/STR/21-22/ 2613 28-Dec-21 9:00 AM Pipe Culvert Laying of GSB Material for pipe Bedding 137+220 - RHS Nos. 1 Approved 29-Dec-21
GCL/STR/21-22/ 2614 28-Dec-21 12:00 PM Pipe Culvert Checking of Pipe laying and jointing NP.4 Hume Pipe of 1200 mm dia 137+220 - RHS Nos. 1 Approved 29-Dec-21
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2615 28-Dec-21 2:00 PM G-S 142+568 - RHS Nos. 1 Not Approved 29-Dec-21
grade for GS Pier Cap (RP1)
GCL/STR/21-22/ 2616 29-Dec-21 9:00 AM MJB Checking of Reinforcement and Profile of MJB PSC girder G-20 17+475 - - Nos. 1 Approved 30-Dec-21
Checking of Reinforcement, Shuttering & Pouring of RCC M-50 grade for
GCL/STR/21-22/ 2617 29-Dec-21 5:00 PM MJB 17+475 - - Nos. 1 Approved 30-Dec-21
MJB Pre-Cast PSC girder G-20
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2618 29-Dec-21 9:00 AM Block Wall 131+020 131+030 LHS Rmt 10 Approved 30-Dec-21
Block Wall 3rd lift.
Checking of Layout excavation, level and Laying of PCC M-15 for box
GCL/STR/21-22/ 2619 29-Dec-21 10:00 AM R.Wall 20+169 - RHS Nos. 1 Approved 30-Dec-21
culvert Return wall (A1&A2)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2620 29-Dec-21 11:00 AM Box Culvert 132+007 - LHS Nos. 1 Approved 30-Dec-21
box culvert Wall final lift with top Haunch & Slab A1,A2
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2621 29-Dec-21 11:00 AM MJB 01+085 - BHS Nos. 1 Approved 30-Dec-21
grade for MJB Pier shaft 8th Lift P6 (ACC Link Road)
Checking of reinforcement, shuttering and pouring of RCC M-25 grade for
GCL/STR/21-22/ 2622 29-Dec-21 9:00 AM C.F.Wall 22+770 22+780 LHS Rmt 10 Not Approved 30-Dec-21
Stem and Counterfort wall 10th lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2623 29-Dec-21 10:00 AM MJB 24+635 - RHS Nos. 1 Approved 30-Dec-21
grade for MJB Pier cap (RP1)
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2624 29-Dec-21 9:00 AM R.Wall 16+602 16+612 LHS Rmt 10 Approved 30-Dec-21
Retaining Wall 7th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2625 29-Dec-21 11:00 AM R.Wall 136+360 136+370 RHS Rmt 10 Approved 30-Dec-21
Retaining Wall final Lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2626 29-Dec-21 12:00 PM R.Wall 136+370 136+380 RHS Rmt 10 Approved 30-Dec-21
Retaining Wall final Lift
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2627 29-Dec-21 10:00 AM MJB 23+100 - BHS Nos. 1 Not Approved 30-Dec-21
grade for MJB Pier cap (P6)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2628 29-Dec-21 11:00 AM Block Wall 130+710 130+730 LHS Rmt 20 Approved 30-Dec-21
Block Wall 1st lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2629 29-Dec-21 12:00 PM Block Wall 26+075 26+095 RHS Rmt 20 Approved 30-Dec-21
Block Wall 5th lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2630 29-Dec-21 12:00 PM MJB 20+800 - RHS Nos. 1 Not Approved 30-Dec-21
grade for MJB Abutment Shaft 9th Lift (RA1)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2631 29-Dec-21 3:00 PM Block Wall 20+450 20+500 RHS Rmt 50 Approved 30-Dec-21
Block Wall 3rd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2632 29-Dec-21 9:00 AM Block Wall 26+095 26+105 RHS Rmt 10 Approved 30-Dec-21
Block Wall 4th lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-35
GCL/STR/21-22/ 2633 29-Dec-21 9:00 AM R.Wall 20+169 - LHS Nos. 1 Not Approved 30-Dec-21
grade for Box Culvert Return wall 3rd Lift
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2634 29-Dec-21 12:00 PM Pipe Culvert 137+220 - RHS Nos. 1 Not Approved 30-Dec-21
grade for Pipe culvert Head wall 2nd lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2635 29-Dec-21 10:00 AM G-S 142+568 - RHS Nos. 1 Not Approved 30-Dec-21
grade for GS Pier Cap (RP1)
Checking of layout excavation, level and laying of PCC M-15 for MJB
GCL/STR/21-22/ 2636 29-Dec-21 9:00 AM MJB 141+100 - RHS Nos. 1 Approved 30-Dec-21
Approach slab (A1 ,A2)
GCL/STR/21-22/ 2637 29-Dec-21 11:00 AM MJB Checking of Elongation for Stressing of Girder 1 & 2(A1-P1) 20+800 - LHS Nos. 1 Approved 30-Dec-21
GCL/STR/21-22/ 2638 30-Dec-21 9:00 AM MJB Checking of Reinforcement and Profile of MJB PSC girder G-21 17+475 - - Nos. 1 Approved 31-Dec-21
Checking of Reinforcement, Shuttering & Pouring of RCC M-50 grade for
GCL/STR/21-22/ 2639 30-Dec-21 5:00 PM MJB 17+475 - - Nos. 1 Approved 31-Dec-21
MJB Pre-Cast PSC girder G-21

Page 9 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2640 30-Dec-21 10:00 AM Block Wall 131+020 131+030 LHS Rmt 10 Not Approved 31-Dec-21
Block Wall 4th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2641 30-Dec-21 9:00 AM R.Wall 20+169 - RHS Nos. 1 Not Approved 31-Dec-21
Return Wall Raft for Box Culvert A1,A2
Checking of layout excavation, level and laying of PCC-M15 for Plum
GCL/STR/21-22/ 2642 30-Dec-21 11:00 AM Block Wall 130+810 130+825 LHS Rmt 15 Approved 31-Dec-21
Concrete Block Wall
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2643 30-Dec-21 9:00 AM MJB 01+085 - BHS Nos. 1 Approved 31-Dec-21
grade for MJB Pier shaft 9th Lift P6 (ACC Link Road)
Checking of reinforcement, shuttering and pouring of RCC M-25 grade for
GCL/STR/21-22/ 2644 30-Dec-21 9:00 AM C.F.Wall 22+770 22+780 LHS Rmt 10 Not Approved 31-Dec-21
Stem and Counterfort wall 10th lift
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2645 30-Dec-21 12:00 PM R.Wall 16+602 16+612 LHS Rmt 10 Approved 31-Dec-21
Retaining Wall final Lift
Checking of Reinforcement, Shuttering & Pouring of Concrete RCC M-40
GCL/STR/21-22/ 2646 30-Dec-21 11:00 AM MNB 18+972 - RHS Nos. 1 Not Approved 31-Dec-21
grade for MNB Deck Slab (RA1-RA2)
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2647 30-Dec-21 10:00 AM MJB 23+100 - BHS Nos. 1 Approved 31-Dec-21
grade for MJB Pier cap (P6)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2648 30-Dec-21 9:00 AM Block Wall 130+710 130+730 LHS Rmt 20 Approved 31-Dec-21
Block Wall 2nd lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2649 30-Dec-21 10:00 AM Block Wall 26+075 26+095 RHS Rmt 20 Approved 31-Dec-21
Block Wall final lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2650 30-Dec-21 12:00 PM MJB 20+800 - RHS Nos. 1 Not Approved 31-Dec-21
grade for MJB Abutment Shaft 9th Lift (RA1)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2651 30-Dec-21 10:00 AM Block Wall 20+450 20+500 RHS Rmt 50 Approved 31-Dec-21
Block Wall 4th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2652 30-Dec-21 11:00 AM Block Wall 26+095 26+105 RHS Rmt 10 Approved 31-Dec-21
Block Wall 5th lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-35
GCL/STR/21-22/ 2653 30-Dec-21 9:00 AM R.Wall 20+169 - LHS Nos. 1 Approved 31-Dec-21
grade for Box Culvert Return wall 3rd Lift
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2654 30-Dec-21 12:00 PM Pipe Culvert 137+220 - RHS Nos. 1 Approved 31-Dec-21
grade for Pipe culvert Head wall 2nd lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-30
GCL/STR/21-22/ 2655 30-Dec-21 10:00 AM G-S 142+568 - RHS Nos. 1 Approved 31-Dec-21
grade for GS Pier Cap (RP1)
Checking of Reinforcement, shuttering and concrete pouring M-30 grade
GCL/STR/21-22/ 2656 30-Dec-21 9:00 AM MJB 141+100 - RHS Nos. 1 Approved 31-Dec-21
for MJB Approch Slab A1,A2
Checking of Layout excavation, level and Laying of PCC M-15 for
GCL/STR/21-22/ 2657 30-Dec-21 11:00 AM R.Wall 20+610 20+620 LHS Rmt 10 Approved 31-Dec-21
Retaining wall.
GCL/STR/21-22/ 2658 31-Dec-21 9:00 AM MJB Checking of Reinforcement and Profile of MJB PSC girder G-22 17+475 - - Nos. 1 Approved 01-Jan-22
Checking of Reinforcement, Shuttering & Pouring of RCC M-50 grade for
GCL/STR/21-22/ 2659 31-Dec-21 5:00 PM MJB 17+475 - - Nos. 1 Approved 01-Jan-22
MJB Pre-Cast PSC girder G-22
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2660 31-Dec-21 10:00 AM Block Wall 131+020 131+030 LHS Rmt 10 Approved 01-Jan-22
Block Wall 4th lift.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2661 31-Dec-21 9:00 AM R.Wall 20+169 - RHS Nos. 1 Not Approved 01-Jan-22
Return Wall Raft for Box Culvert A1,A2
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2662 31-Dec-21 9:00 AM Block Wall 130+810 130+825 LHS Rmt 15 Approved 01-Jan-22
Block Wall 1st lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-40
GCL/STR/21-22/ 2663 31-Dec-21 11:00 AM MJB 01+085 - BHS Nos. 1 Not Approved 01-Jan-22
grade for MJB Pier shaft 10th Lift P6 (ACC Link Road)
Checking of reinforcement, shuttering and pouring of RCC M-25 grade for
GCL/STR/21-22/ 2664 31-Dec-21 9:00 AM C.F.Wall 22+770 22+780 LHS Rmt 10 Not Approved 01-Jan-22
Stem and Counterfort wall 10th lift
GCL/STR/21-22/ 2665 31-Dec-21 12:00 PM MJB Checking of Elongation for Stressing of Girder-3 (A1-P1) 20+800 - LHS Nos. 1 Approved 01-Jan-22
Checking of Reinforcement, Shuttering & Pouring of Concrete RCC M-40
GCL/STR/21-22/ 2666 31-Dec-21 11:00 AM MNB 18+972 - RHS Nos. 1 Approved 01-Jan-22
grade for MNB Deck Slab (RA1-RA2)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2667 31-Dec-21 10:00 AM Block Wall 130+710 130+730 LHS Rmt 20 Approved 01-Jan-22
Block Wall 3rd lift.
GCL/STR/21-22/ 2668 31-Dec-21 10:00 AM MJB Checking of Elongation for Stressing of Girder-1,2,3 (A1-P1) 20+800 - RHS Nos. 1 Approved 01-Jan-22

Page 10 of 11
Structure RFI Status Summary for the Month of December-2021
Requested Dated: 26-Dec-21

Inspection Inspection Chainage


RFI No. Item Description of Work Side Unit Length (M) Status Status Date Remarks
Date Time
From To
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-35
GCL/STR/21-22/ 2669 31-Dec-21 12:00 PM MJB 20+800 - RHS Nos. 1 Approved 01-Jan-22
grade for MJB Abutment Shaft 9th Lift (RA1)
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2670 31-Dec-21 11:00 AM Block Wall 20+450 20+500 RHS Rmt 50 Not Approved 01-Jan-22
Block Wall 5th lift.
Checking of shuttring and pouring of PCC M-15 grade for Plum Concrete
GCL/STR/21-22/ 2671 31-Dec-21 1:00 PM Block Wall 26+095 26+105 RHS Rmt 10 Approved 01-Jan-22
Block Wall final lift.
Checking of Reinforcement, Shuttering & Pouring of concrete RCC M-35
GCL/STR/21-22/ 2672 31-Dec-21 11:00 AM R.Wall 20+169 - LHS Nos. 1 Not Approved 01-Jan-22
grade for Box Culvert Return wall 4th Lift
GCL/STR/21-22/ 2673 31-Dec-21 12:00 PM MJB Checking Launching of RCC Girder for MJB RP1 to RP2. 16+475 - RHS Nos. 1 Approved 01-Jan-22
Checking of Reinforcement, Shuttering & pouring of Concrete RCC M-20
GCL/STR/21-22/ 2674 31-Dec-21 10:00 AM Pipe Culvert 137+220 - RHS Nos. 1 Approved 01-Jan-22
grade for Pipe culvert Encasing.
Checking of shuttring, reinforcement and pouring of RCC M-35 grade for
GCL/STR/21-22/ 2675 31-Dec-21 9:00 AM R.Wall 20+610 20+620 LHS Rmt 10 Approved 01-Jan-22
Return Wall Raft for Box Culvert A1,A2

Page 11 of 11