0% found this document useful (0 votes)
283 views1 page

Summary of Quantities: Project Billboard / Signboard

This document provides a summary of quantities for a road construction project. It includes 4 typical road sections showing the dimensions of the shoulders, carriageway, and super elevation. The sections also indicate cut and fill requirements as well as notes on road crowning and laying pipe culverts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
283 views1 page

Summary of Quantities: Project Billboard / Signboard

This document provides a summary of quantities for a road construction project. It includes 4 typical road sections showing the dimensions of the shoulders, carriageway, and super elevation. The sections also indicate cut and fill requirements as well as notes on road crowning and laying pipe culverts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SUMMARY OF QUANTITIES

1000 2500 2500 1000


SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER
1000 2500 2500 1000
SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

1
-3.00% -1.50% 1.22% -2.78%

H
1
0.5
.5

SUPER ELEVATION WITH CANAL LINING SECTION

1000 2500 2500 1000


1000 2500 2500 1000 SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

H
1 1
1
PROJECT BILLBOARD / SIGNBOARD
SUPER ELEVATION SECTION

1000 2500 2500 1000


SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

1000 2500 2500 1000


SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

1
1 1
CUT & FILL SECTION 1.5
TYPICAL ROAD SECTION WITH CROSS DRAIN
GENERAL NOTES :

1. CROWNING WILL START DURING THE SUB-GRADE PREPARATION


TO POURING OF CONCRTE.
2. PIPE CULVERTS SHALL BE LAID STARTING FROM THE
CONCRETE COLLAR
DOWNSTREAM AND PROGRESSING UPSTREAM WHILE
200
MAINTAINING THE SLOPE OF NOT MORE THAN 2%.
RCPC CULVERT
0
R10

100
VARIES "PIPE DIAMETER"
1000 3050 3050 1000
SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

100MM THK. SAND


BEDDING (103-3)

100
1 2 3 4 5 6 7 8 9 10

CONCRETE COLLAR
RCPC CULVERT

100

100MM THK. SAND


BEDDING (103-3)

N.G.L

100
SCALE: 1:100
VARIES "PIPE DIAMETER"

PROJECT NAME SURVEYED:


PROJECT NAME ANDAND LOCATION:
LOCATION: SHEETSHEET CONTENT:
CONTENT: SURVEYED: CHECKED:
CHECKED: REVIEWED:REVIEWED: RECOMMENDING
RECOMMENDING APPROVAL: APPROVAL: APPROVED: APPROVED: SET NO. SET NO.
SHEET NO.
REPUBLIC OF THE PHILIPPINES
PROVINCE OF DAVAO DE ORO
ERIC E. DAMPIGANON
UPGRADING IMPROVEMENT OF FMR AT ENGINEER - II
DRAFTED:
BRGY. BAGONG SILANG 04
OFFICE OF THE PROVINCIAL ENGINEER ROLAND P. BERNALES
1st flr. PEO / PAGRO / PENRO Building, Capitol Complex
AS STATED
DESIGNED:
DRAFTSMAN - II ALBERTO P. BUCOY JR. JOY C. MANABAT RODERICK M. DIGAMON JAYVEE TYRON L. UY, MPA 01
SURVEYS,HIGHWAYSANDSTRUCTURALSECTION PLANNING AND PROGRAMMING DIVISION HEAD PROVINCIAL ENGINEER PROVINCIAL GOVERNOR
DAVAO DE ORO Brgy. Cabidianan, Nabunturan, Davao de Oro Province
MARAGUSAN, DAVAO DE ORO PROVINCE RONNIE S. APPARI DATE: DATE: DATE: DATE:
ENGINEER - II

You might also like