SSR 2020-21
SSR 2020-21
ENE51-PM0SYI(400)/12/2021-EE2
APTRANSCO is periodically communicating Standard Schedule of Rates for labour & material
for construction and O&M works pertaining to 400kV, 220kV & 132kV transmission lines &
substations for adoption in preparation of estimates. Accordingly, the SSR communicated earlier in
the reference cited is revised and communicated herewith.
ORDER
Standard Schedule of Rates for labour & material for construction and O&M works pertaining to
400kV, 220kV & 132kV transmission lines & substations approved by TRANSMISSION
CORPORATION OF ANDHRA PRADESH LIMITED is communicated herewith for adoption in
preparation of estimates.
The SSR 2020-21 will come into force from the date of issue of this T.O.O and shall be valid till
further orders
Sd/-
K Praveen Kumar
Director (Grid, Transmission & Management)
To
All
The Chief Engineers.
The FA&CCA/VS/APTRANSCO.
The Superintending Engineers.
The SAOs.
The Executive Engineers.
&
INDEX
VOLUME-I
LABOUR RATES
5 ANNEXURE-IV:
14
Erection of 220kV & 132kV Substations
6 ANNEXURE-V:
Erection of Illumination, Lighting, Fire Fighting, Air-conditioning, 18
D.G Set & 33kV Station Supply Systems in 400kV Substations.
7 ANNEXURE-VI:
Handling charges of Equipment & Line Materials 24
8 ANNEXURE-VII:
Transportation & Handling Charges pertaining Erection of 400kV 29
Transmission Lines
9 ANNEXURE-VIII:
Transport of 220kV & 132kV Substation Equipment and 30
Transmission Line Materials.
10 ANNEXURE-IX:
Handling & Erection of Power Transformers 31
11 ANNEXURE-X:
O&M Works of EHT Lines 37
12 ANNEXURE-XI:
39
Erection of Telecom Equipment
13 ANNEXURE-XII:
Laying of EHT UG Cables 43
14 ANNEXURE-XIII Rates of the items of works(Line & Substations)
involved under special conditions 60
File No.ENE51-PM0SYI(400)/12/2021-EE2
INDEX
VOLUME-II
EQUIPMENT/MATERIAL RATES
5 SAS Equipment/Material 89
PREAMBLE
File No.ENE51-PM0SYI(400)/12/2021-EE2
PREAMBLE
1. The rates for the item of works (Line & Substations) involved under special conditions in
the SSR-19-20 are also continued in SSR-2020-21 vide Annexure-XIII.
2. For EHT (400kV, 220kV & 132kV) Transmission line works: Uniform Area Allowance
including Scattered area Mobilization efforts is provided as follows: -
a. 20% extra provision on the basic rates of APTRANSCO towards Uniform Area
Allowance including Scattered area Mobilization efforts in general areas
b. 35% extra provision on the basic rates of APTRANSCO towards Uniform Area
Allowance including scattered area Mobilization efforts in difficult area
/Scheduled terrain. The concerned SE/TLC has to certify that entire line passes
through difficult area / Scheduled terrain duly furnishing the justification.
Note:- If 35% extra toward Uniform Area Allowance including Scattered area
Mobilization efforts in difficult area/ Scheduled Terrain is applicable for a
work, then the 20% extra towards Uniform Area Allowance including
Scattered area Mobilization efforts in general areas is not applicable.
c. 10% extra to the rate of earth flat (material) is allowed towards wastage, cleats and
overlap etc., while preparing the estimate as the billing for this item is on Running
Meters basis after laying of earth mat.
d. For stringing of conductor for small modification works, if the length of the line
is less than 0.5 KM, 0.5KM is considered and if the length of the line is greater
than 0.5 KM and less than 1 KM, 1KM is considered, in the preparation of
estimate.
e. For survey of small length of lines, if the length of line is less than 1KM, then
1KM is considered for survey of small length of lines in the preparation of
estimate.
f. The rates for tree cutting and jungle clearance may be followed as per Common
SoR of Government of Andhra Pradesh.
3. Area Allowances:
a. 35% extra over the basic rates on labour component of works is allowed in
Greater Visakhapatnam Municipal Corporation and Vijayawada Municipal
Corporation.
b. 20% extra over the basic rates on labour component of works is allowed in other
Municipal Corporations.
c. 15% extra over the basic rates on labour component of works is allowed in
district headquarters and other municipalities.
1
File No.ENE51-PM0SYI(400)/12/2021-EE2
Note: Works within a belt of 12Km from the Municipal limits shall be taken into account for
the purpose of allowing the extra percentages.
d. Agency Areas:
1. 25% extra is allowed for the works located inside the Agency area.
2. 15% extra is allowed for the works located in the border of Agency area i.e.,
works located within a belt of 16Km from the boundary of Agency area.
Note: If more than one area allowances (such as those) for Municipal Corporation
Municipalities, Agency areas are applicable for a particular situation, only the
maximum out of the allowable percentages is to be allowed.
e. The Area allowance/Uniform Area Allowance including scattered area
Mobilization efforts charges are not applicable on Fabrication charges and
Galvanization Charges.
f. The area allowance shall be applicable for O&M and RMI works in substations
also on par with construction works.
g. The Uniform Area Allowance including scattered area Mobilization efforts shall
not be applicable for O&M & RMI works of lines.
The area allowances are applicable for Civil & Electrical works (labour), where
the value of work is more than Rs.20.00 lakhs (electrical & civil).
4. 7.25% on basic labour rates towards for COP (Contractors Overheads and Profit)
including labour importation is applicable only for turnkey projects (new Substations,
Lines 33KV features and Bay Extension works ) of more than 1 crore and not applicable
to O&M works and other than turnkey works. The following components of COP
relevant/pertaining to APTRANSCO are considered.
a. Site accommodation.
b. Setting up of plants and machinery.
c. Formation of access road.
d. Water supply for construction.
e. Electricity for construction.
f. Technical agents for site supervisions.
g. Documentation and as built drawings.
h. Mobilization/de-mobilization of resources.
i. Labour camps with minimum amenities and transportation to work sites.
j. Light vehicle for site supervision including field and laboratory testing.
k. Laboratory equipment and quality control including field and laboratory testing.
l. Watch & Ward.
2
File No.ENE51-PM0SYI(400)/12/2021-EE2
For Civil work items of APTRANSCO, the prevailing common SoR of Board of
Chief Engineers for engineering departments of GOAP shall be followed in toto except
area allowances & Contractors Profit and overheads (COP).
The Area allowances of APTRANSCO SSR-2020-21 at Para 4 is also applicable for
Civil Works and a provision is made for 7.25% towards Contractors Profit and overheads.
The provisions made in [Link] (Civil) Ms No.148, dated.21.10.2009 are also
applicable for civil works except the Uniform area allowance & Scattered area allowance.
The Uniform Area Allowance including scattered area Mobilization efforts charges at
Para 2 is also applicable for Civil Works (Transmission Line).
9. The rates for the following equipment/ material pertaining to IT will be adopted from the
GEM (Government e-market place) portal.
a) For Servers, Work Stations, Load Balances, SAN storages, SAN Switches, tape
Library, Routers/Access Points, Firewalls, Switches, Racks and Hubs.
b) Desktops, Laptops, All in ones, Tablets, Printers, Monitors, UPS, Scanners, toner
cartridges, CAT V & VI Cables, for use in office only.
c) MS Office, MS Windows, Backup Software and Antivirus software.
d) Computer related items for use in SAS are to be adopted from SSR.
e) In future, if any items are not available in the GEM portal, the rates will be arrived as
per guidelines.
10. In respect of Cement and Steel rods the procedure indicated in Common SSR for all
Engineering Departments shall be adopted for updating of estimates at the time of
finalization of tenders.
3
File No.ENE51-PM0SYI(400)/12/2021-EE2
11. All statutory levies such as GST, Cess for labour welfare if any, are based on the
prevailing notified rate, shall have to be added in the estimate.
12. The S.S.R will come into force with immediate effect until further orders.
4
File No.ENE51-PM0SYI(400)/12/2021-EE2
VOLUME-I
LABOUR RATES
5
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE – I
SS RATES FOR ERECTION OF 400KV TRANSMISSION
LINES
SS Rate for
Item 2020-21
Sl. No. Description of Item Unit
No. (in Rs)
Preliminary Survey with GPS survey, theodilite &
C4L1 1(a) total station, marking route on topo sheets represents actual kM 4,374.19
field conditions.
Detailed Survey with GPS, total stations, Digital
theodolite etc., along the approved alignments
C4L 2 1(b) kM 22,723.15
preparation of profiles, tower spotting, tower schedules
and soil resistivity.
C4L 3 2(a) Excavation of trail pit (1mt x 1 mt x 3.5mt). No. 2,258.31
Excavation of Trial Pit by Auguring & Boring
2(b) No. 2,516.07
of holes of 300mm Dia x 3.5 RM.
Check Survey, peg marking the tower positions on
ground,conforming to the approved Profile and tower
C4L 4 3 kM 5,174.98
schedules using
GPS, Total stations, Digital theodolites etc.
Setting with stub for all types of towers withstub
setting template which includes erection ofstubs, fixing
C4L 5 4 of jacks for supporting template, alignment and leveling Set 18,438.79
excluding cost of excavation and concrete
(excluding transportationcharges).
Super structure erection of all type of towers including
extensions except RC towers including fitting of step
bolts, danger plates, number plates, phase plates, circuit
C4L 6 5(a) plates, bird guards, anti-climbing devices etc., and tack MT 9,895.74
welding of all bolts & nuts (upto bottom cross
arm level) (excluding transportationcharges).
Erection of all types of Anchor Towers and their
extensions (complete), including fitting of step bolts, danger
C4L 7 5(b) plates, number and phase plates, circuit plates, bird MT 14,843.61
guards, and anti climbing devices etc and tack welding
of all bolts & nuts (upto bottom cross arm level).
Super structures erection of 400kV Multi circuit towers
including Auxiliary cross arms (complete), including
fitting of step bolts, danger plates numbers and phase
C4L 8 5(c) MT 17,614.53
plates, circuit plates, birds guards, and anti climbing
devices etc and tack welding of all bolts & nuts (upto
bottom cross arm level) etc.
Super structure erection of River crossing towers and
their extensions(complete), including all the associated
works such as, earthing of all the four legs as per the
approved drawing(including the cost of material),fitting of
C4L 9 5(d) step bolts, danger plates, number and phase plates, circuit MT 24,722.51
plates, bird guards, and anti climbing devices etc and
tack welding of all bolts & nuts (upto bottom cross arm
level).
6
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item 2020-21
Sl. No. Description of Item Unit
No. (in Rs)
Mounting of Insulators and stringing of double circuit with
twin bundled ACSR Moose Power Conductor including
C4L 10 6 laying, jointing, tensioning, sagging clamping and fixing
spacers (excluding transportation charges).
C4L 17 9(d) Stringing of two (2) nos. OPG Wire, including laying jointing,
tensioning etc., with necessary accessories.(excluding KM 91,110.79
transportation charges).
Stringing of one (1) no. OPG Wire, including laying jointing,
C4L 18 9(e) tensioning etc., with necessary accessories.(excluding KM 60,739.99
transportation charges).
10 Earthing of transmission towers:
Providing of Pipe type earthing including of cost of BH
C4L 19 10(a) coke & salt but excluding cost of earthing set Each 5,070.63
7
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE - II
ERECTION OF 220kV & 132 kV TRANSMISSION LINES
SS Rate for
Sl. Item 2020-21
Description of Item Unit
No. No.
(in Rs)
CL1 1 Check Survey, peg marking the tower positions on ground, kM
conforming to the approved Profile and tower schedules using
GPS, Total stations, Digital theodolites etc. 5,174.98
"the rate is also applicable for re-check survey if any done due to
ROW problems"
CL2 2 Conducting reconnoitery and preliminary survey along bee line RKM
with three alternative routes and furnishing report for selecting the
best proposal for approval, including cost & conveyance of all
materials, hire charges of equipment, tools and plant, preparation 4,700.58
of drawings and reports, labour charges, complete for finished
item of work as per the directions of Engineer-in-charge at
site.(With Theodolite / With GPS equipment ( As per Clause 4.9
of survey) /With total station equipment).
3 Conducting detailed survey by taking the levels along the route to
a corridor of 15 mtrs. width on either side of alignment, at every
20 mtrs. interval and wherever there is a steep increase/decrease in
ground profile duly indicating the chainage between angle points,
river crossings, railway crossing and major highway crossings and
plotting the profiles and preparation of vicinity maps to the
standard scales. The survey includes clearing of bushes, branches
of tree, crops and shrubs wherever encountered for detailed survey
for viewing, for fixing anchor towers and also taking levels etc.
required for conducting detailed surveys.
This work can be done with Theodolite or with GPS equipment
(As per clause no.4.9 of survey) or with total station equipment.
This work involves the following items.
CL3 i) Tower schedules as per tower spotting requirements plotted on RKM
reproducible tracing of profile original with one extra copy shall
be given . Towers Schedules should be submitted with GPS Co- 16,138.04
ordinates. Identification of wind zones, collection of Hydraulic
data of rivers / drains from competent authority.
CL4 ii) Taking earth resistivity at an interval of 1 Km by electrical Loc
1,174.47
resisitivity method (4 point method) or by ERM method.
CL5 iii) Preparing of PTCC questionnaire, topo sheets extracts with Job
marking of the proposed line. Soil resistivity report, tower sketch, 11,487.75
station single line diagram etc. (30 copies/sets)
CL6 3 iv) Enumeration and numbering of trees, & marking on tree with Each
white letters on yellow paint measuring girth and height of the
trees and plotting in the profile. The trees enumerated shall be
shown in profile on either side of centre line clearly, up to
23.09
required corridor for 132kV Line -27 Metres & 220kV Line -35
Meters) indicating name of tree, girth & height. Separate tree
schedule should be submitted along with the profile for arriving
tree compensation amount.
CL7 3 (v) Preparation of ground profiles for Railway crossing, River Each
crossing and EHV power line crossing separately wherever crossing 3,497.56
required.
The above rates shall include cost and conveyance of all materials
hire charges of equipment tools & plant, preparation of profile
drawing, painting of trees, labour charges, preparation of report
etc., complete for finished item of work as per instructions of
Engineer-in-charge.
8
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item 2020-21
Description of Item Unit
No. No.
(in Rs)
CL8 4 Excavation of trial pits of standard dimensions of 1 mtr X 1 mtr. Each
width upto 3 mtrs. depth at 1 KM interval or wherever there is
abnormal change in topography and taking observation of soil
strata for classification of foundation and position of existing 1,935.69
ground water table/depth of water in the existing open wells if any
and back filling the trial pits after vetting by Departmental
officials.
5 Setting of stubs with stub-setting template : Erection of stubs, stub
template, fixing of jacks for supporting template, allignment and
levelling for exact location of stubs of stubsetting template,
dismantling of template after completion of initial curing of C.C.,
movement of template from one location to other location
(A minimum lead of 1 KM is adopted).
CL9 (a) 132 KV P, R & S-Type Towers Loc. 9,236.68
CL10 (b) 220 KV A, B, C & D-Type Towers Loc. 13,460.16
CL11 (c) 132 KV Multi circuit Towers Loc. 11,546.19
CL12 (d) 220 KV Multi circuit Towers Loc. 16,823.14
CL13 (e) 132kV Narrow based Multi Circuit Towers. Single pit 10,616.42
CL14 (f) 220kV Narrow based Multi Circuit Towers. Single pit 15,489.64
CL15 (g) Pole/structure for termination of 220/132kV cables Loc. 10,390.77
CL16 (h) 220 /132 kV Narrow based tower Loc. 15,141.63
CL17 6(a) Erection of tower structures, including all types of extensions MT
except JC type towers (stub template erection and dismantling are
6,114.28
not to be included) (including 3 mtr., 6 mtr. , 9 mtr., & 12 mtr.
extensions)
CL18 6(b) Erection of all types of narrow based towers / multi circuit tower MT
structures / narrow based multi circuit towers structures, including
all types of extensions except JC type towers (stub template 8,566.54
erection and dismantling are not to be included) (including 3
mtr., 6 mtr. , 9 mtr., & 12 mtr. extensions)
CL19 6(c) Erection of all types of 'JC' Type tower structures, including all MT
types of extensions (stub template erection and dismantling are not 11,011.99
to be included) (including '0' based, Extended and Truncated)
9
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item 2020-21
Description of Item Unit
No. No.
(in Rs)
CL34 (xiv) 3 Nos. Dog conductors RKM 31,283.76
CL35 (xv) 6 Nos. Dog conductors RKM 49,535.57
STRINGING OF HTLS POWER CONDUCTOR using tension -
puller machine: Hoisting of tension insulators and Suspension
insulators, paving out the conductor, rough sagging,Jointing,
tensioning, clipping and fixing of preformed Armour rods and
vibration dampers. measuring ground clearances wherever
[Link] excludes the works involved in the crossing of
LT, 11kV & 33kV power lines viz dismantling and restringing of
conductor.
CL36 (i) 3 Nos Moose Conductors RKM 2,44,680.50
CL37 (ii) 6 Nos Moose Conductors RKM 3,67,020.75
CL38 (iii) 3 Nos Zebra Conductors RKM 2,31,087.14
CL39 (iv) 6 Nos Zebra Conductors RKM 3,46,630.71
CL40 (v) 3 Nos Panther Conductors RKM 2,17,493.78
CL41 (vi) 6 Nos Panther Conductors RKM 3,26,240.67
CL42 8 Stringing of Earthwire: FIxing hardware, paving out earth wire, RKM
jointing, tensioning, stringing and clamping of 7/3.15 mm high 8,346.33
tensile galvanised steel wire.
CL43 9 Earthing of towers including cost of Excavation, Back-filling, Nos.
including cost of 25 mm dia 2.5 mm thick, class 'C' G.I. pipe of
5,306.84
3.00 Mtrs length with 50X6 mm G.I. Flat 4.05 Mtrs long, BH
Coke , Salt etc., and measuring tower footing resistance.
CL44 10 Slant Earthing of towers including cost of Excavation, Back- Nos.
filling, including cost of 25 mm dia 2.5 mm thick, class 'C' G.I.
5,306.84
pipe of 3.00 Mtrs length, with 50x6mm G.I. Flat of 4.05 Meters,
BH Coke, Salt etc., and measuring tower footing resistance.
CL45 11 Earthing of towers including cost of Excavation, Back-filling, Nos.
including cost of 25 mm dia 2.5 mm thick, class 'C' G.I. pipe of
3.00 Mtrs length,BH Coke , Salt etc., and measuring tower footing 4,319.98
resistance. (Without GI Flat ) for counter poise earthing.
CL46 12 Counterpoise earthing including clamping devices and terminal Rmts
lugs, but excluding cost of steel wire. 47.58
CL47 13 Half round welding of [Link] and nuts of towers in the section Each
between ground level & upto bottom X-arm level including all
bolts connecting the bracings at the bottom X-arm level and 21.75
painting the welded portion with one coat of zinc rich paint.
CL48 14 Half round welding of [Link] and nuts of towers in the section Each
between ground level & upto bottom X-arm level including all
bolts connecting the bracings at the bottom X-arm level and 32.63
painting the welded portion with one coat of zinc rich paint- For
JC type towers
CL49 15 Laying of 33 kV 400 [Link] XLPE cable Rmts 354.79
CL50 16 Termination of 400 [Link] XLPE cable Each 6,451.41
CL51 17 Dismantling & re stringing of 33 kV conductor (all types of Per
conductors) for crossing of 33 kV line during stringing of EHT conductor 3,371.15
lines.
CL52 18 Dismantling & re stringing of 11 kV conductor (all types of Per
conductors) for crossing of 11 kV line during stringing of EHT conductor 1,844.61
lines
CL53 19 Dismantling & re stringing of LT conductor/cables for crossing of Per
conductor 1,160.86
LT line (all types) during stringing of EHT lines
10
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE – III
ERECTION OF 400kV SUBSTATIONS
SS Rate for
Item.
[Link]. Description of Item Unit 2020-21
No.
(in Rs)
Total cost of receipt from site/stores, storage, handling,
erection, testing & commissioning of 400/220kV, 315MVA
Transformers 50/ 63/80/125 MVAR Shunt reactor
with all accessories and fittings including storage cum
C4S1 1 erection insurance as per specification. The charges Nos 25,80,242.17
include AC power for oil filter machines and all
other supplier supervision charges including oil testing
charges in a third party lab for complete erection,
testing and commissioning.
Hoisting of insulators & hardware, paving conductor
and stringing of 400kV main bus for three phases with Bus
C4S2 2(a) 44,055.05
quadruple moose conductor to a tension of 1000kgs for Section
single moose conductor, bus section length is 54mtrs.
Hoisting of insulators & hardware, paving conductor
and stringing of 400kV Jack bus for three phases with twin Bus
C4S 3 2(b) 22,344.45
moose conductor to a tension of 1000kgs for single moose Section
conductor, bus section length is 60mtrs.
Erection of 7/3.66 GSS Earth wire from top of peak tower and
LMs to ground and connecting to untreated earth pits
C4S 4 3 including cutting, clamping and fixing of all hardware RM 65.80
like Pad type compression clamp, cleat type clamp and T
clamp etc.
Connecting equipment to equipment through 4"/4.5" IPS
Al tube including cutting, bending, welding, testing,
C4S 5 4(a) Meter 284.00
clamping etc., for each meter including both side
connections.
Connection of equipment to bus and other equipments
4(b) with Quad Moose conductor where ever necessary. Each 1,042.36
11
File No.ENE51-PM0SYI(400)/12/2021-EE2
12
File No.ENE51-PM0SYI(400)/12/2021-EE2
13
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE - IV
ERECTION OF 220kV, 132 kV & 33kV SUBSTATIONS
SS Rate for
Sl. Item 2020-21
Description of Item Unit
No. No. (in Rs)
14
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item 2020-21
Description of Item Unit
No. No. (in Rs)
15
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item 2020-21
Description of Item Unit
No. No. (in Rs)
CS32 22.4 2-pole 220 kV Circuit Breaker with support structure & Each
marshalling boxes incl. grouting of foundation bolts & wiring of 20,683.65
cables & terminations.
CS33 22.5 2-pole 132 kV Circuit Breaker with support structure & Each
marshalling boxes incl. grouting of foundation bolts & wiring of 14,777.34
cables & terminations.
CS34 22.6 220 kV Current Tranformers. Each 5,913.11
CS35 22.7 132 kV Current Tranformers. Each 3,823.81
CS36 22.8 33 kV Current Tranformers. Each 1,181.28
CS37 22.9 220 kV Potential Transfomers. Each 5,913.11
CS38 22.10 132 kV Potential transformers. Each 3,823.81
CS39 22.11 33 kV Potential transformers. Each 1,181.28
CS40 22.12 220 kV Lightning Arrestors. Each 3,823.81
CS41 22.13 132 kV Lightning Arrestors. Each 1,805.20
CS42 22.14 33 kV Lightning Arrestors. Each 705.49
CS43 22.15 220 kV Capacitve Voltage Transformers. Each 5,563.77
CS44 22.16 132 kV Capacitve Voltage Transformers. Each 3,823.81
CS45 22.17 220 kV Isolators with earth swtich including solid core insulators Each
erection, alignment in full shape for smooth operation by 9,387.56
Electrical and manually.
CS46 22.18 132 kV Isolators with earth swtich including solid core Each
insulators erection, alignment in full shape for smooth operation 6,951.64
by manually.
CS47 22.19 220 kV Isolators without earth swtich including solid core Each
insulators erection, alignment in full shape for smooth operation 8,694.31
by Electrical and manually.
CS48 22.20 132 kV Isolators without earth swtich including solid core Each
insulators erection, alignment in full shape for smooth operation 6,254.30
by manually.
CS49 22.21 2-pole, 220 kV Isolators without earth swtich including solid Each
core insulators erection, alignment in full shape for smooth 7,389.35
operation by Electrical and manually.
CS50 22.22 2-pole, 132 kV Isolators without earth swtich including solid Each
core insulators erection, alignment in full shape for smooth 5,316.38
operation by Electrical and manually.
CS51 22.23 33 kV Isolators including solid core insulators erection, Each
2,259.21
alignment in full shape for smooth operation.
CS52 22.24 220 kV Bus Post Type Insulators. Each 492.08
CS53 22.25 132 kV Bus Post Type Insulators. Each 371.10
CS54 22.26 33 kV Solid Core Insulators Each 248.76
CS55 23 33 kV /400 V Station Transformer including all necessary Each
connections on HV & LV side including cost of lugs (But 7,852.89
excluding cost of transformer and HG fuse set)
CS56 24 Erection of Control / Relay panels, LTAC panels, announciation, Each
PTDB panels etc.,in the control room duly mounting them on
channels and grouting them with foundation bolts excluding cost
3,088.41
of channels & foundation bolts (for 220kV & 132kV),
including man power support to MRT wing for commissioning.
CS57 25 Erection of 220 V, 200 Ah/ 80 Ah Lead Acid battery in complete Set
12,103.53
shape fit for charging.
CS58 26 Erection of 220 V, 200 Ah/ 80 Ah maintenance free battery in Set
3,912.17
complete shape fit for charging .
CS59 27 Erection of 220 V, 200 Ah / 80Ah battery charger. Set 4,022.28
CS60 28 Erection of Capacitor Bank including series reactor of 7.5 Each
6,233.92
MVAR Capacity
CS61 29 Erection of Marshalling kiosk Each 1,038.53
CS62 30 Erection of Marshalling boxes Each 504.32
CS63 31 Erection of Lighting pillar box in switchyard on foundation laid Each
1,390.59
(Excluding pillar box). (for 220kV & 132kV )
16
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item 2020-21
Description of Item Unit
No. No. (in Rs)
CS75 36 Fixing of 90lb rail poles over the transformer plinths. RM 691.90
CS76 37 Fixing of 105lb rail poles over the transformer plinths. RM 808.80
CS77 38 Erection of 33kV HG Fuse set Each 840.07
CS78 39 Erection of 33kV PT Distribution Box Each 505.67
CS79 40 Laying and Terminations of 11kV, XLPE 1000 Sqmm Cable RM 176.72
CS80 41 Erection of 11kV VCB outdoor type Kisok (within built Breaker, Each
3,591.37
CTs, PTs, Surge Arrestors & Relays).
Marking as per approved layout with the help of surveyor
CS81 42 220 kV sub-station Each 43,667.31
CS82 43 132 kV sub-station Each 29,111.54
CS83 44 Bay / Bays in one sub-station Each 14,555.77
45 Auto-CADD drawing with 12 copies indicate complete land with
dimensions, plan of SS with equipments, location of control
room, equipments, roads, duct routes, earth mat of 100X16mm &
50X 8mm flat earth pits,yard lighting fixtures etc.,
CS84 i 132kV SS layout drawing Job 7,394.79
CS85 ii 220kV SS layout drawing Job 9,073.58
CS86 46 Writing of letters in control room panels of lettering on panels Line
104.67
marshalling boxes.
CS87 47 Supply and installation of Key - Board of size 1.5'x2' of Eco Each
Wood Board with Glass covering with lock and key arrangments 5,817.94
for providing all the keys of equipment and SS.
Note:
i. Bore earthing in estimations as per field conditions will be considered on
case to case basis as supplemental items.
ii. 25% excess over CS64 is allowed for JC tower fabrication charges.
17
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE – V
ERECTION OF ILLUMINATION, LIGHTING, FIRE FIGHTING,AIRCONDITIONING,
D.G Set & 33kV STATION SUPPLY SYSTESM IN 400kV SUBSTATIONS.
SS Rate for
Sl. Item. 2020-21
Description of item Unit
No. No. (in Rs)
Erection of indoor and outdoor illumination for 400/220 KV
Substation, Control House, Auxiliary Buildings, 33 KV Switch yard,
street lighting, erection and commissioning of following items as per
C4F1
the approved design and drawings, including indoor/ outdoor
Junction Boxes, Conduits, Lighting wires, lugs, ferules etc for
complete finished item of work.
Fixing Buzzer anchor make or equivalent approved make with ISI
1 Each 312.91
mark with necessary bell and switches etc.
Providing and fixing concealed in roof and walls with PVC Conduit
piping of ISI standards with necessary GI wire of of suitable guage
to draw wires at later date including cost of junction Box etc. cost of
2 conveyance of all materials etc complete for finished item of
work for Guest House, store building, pump house building &
C4F 2 security room as approved and directed by the Engineer- in-charge
at site.
(i) 32 mm dia - 2mm thick RM 125.17
(ii) 25 mm dia - 2 mm thick RM 109.13
(iii) 12 mm dia - 1.5mm thick RM 73.81
Modular for Main distribution board with 1 No. 63A, TPMCB for
I/C and 2 Nos. 32A SPMCB &
C4F 3 3 Each 2,283.41
6 Nos. SPMCB with neutral link for O/G complete make
Havells or MDS or equivalent.
Fixtures for 36W lamps BJLM-236 type, Fixtures for 36W lamps BJSM-
3(i) 236 type , Fixtures for 36W lmaps BJIV-236 type, Fixtures for energy Each 624.18
saving tube light 2x36W or equivalent LED lamps.
Fixtures for 9W CFL Lamp, Fixtures for GLS DBD-10type,
3(ii) Fixtures for 2x18 W CFL Lamp, Fixtures for 1x36W CFL Lamp or Each 312.91
equivalent LED lamps.
Erection, testing and commissioning of outdoor and street Lighting
C4F 4 4 Fixtures including fixing of conduit, Junction boxes, wiring and
terminations complete etc.(excluding cost of concrete)
Lighting Masts / Poles as per drawing enclosed
1
including concreting in full shape.
(i) Type A1 Each 6,418.51
(ii) Type E1 Each 3,429.09
(iii) All types of Lighting Panels Each 2,203.16
Junction Box with MCB and Terminal Blocks
(iv) Each 436.46
(Bolt Type)
(v) 415V 63A Power Recepticle outdoor Each 872.94
(vi) 5/15 A, 240 V sockets with swtich board Each 57.76
(vii) Decorative type switch Boards Each 125.17
(viii) Telephone Junction Boxes Each 109.13
(ix) Telephone Jacks for Telephones Each 40.12
(x) Celling Fans with Electronic regulators Each 221.44
Flood lighting fixtures for 400W sodium Vapour
(xi) Each 409.18
lamp or Equivalent LED Lamp
18
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item. 2020-21
Description of item Unit
No. No. (in Rs)
Street lighting fixtures for 150 W sodium Vapour lamp or Equivalent
(xii) LED Lamp Each 409.18
19
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item. 2020-21
Description of item Unit
No. No. (in Rs)
a(ii) 300 NB (above ground) RM 1,667.20
b(i) 250 NB (below ground) RM 2,044.30
b(ii) 250 NB (above ground) RM 1,290.12
c(i) 200 NB (below ground) RM 1,586.97
c(ii) 200 NB (above ground) RM 1,211.50
d(i) 150 NB (below ground) RM 1,251.61
d(ii) 150 NB (above ground) RM 1,022.16
e(i) 100 NB (below ground) RM 794.28
e(ii) 100 NB (above ground) RM 645.06
f(i) 80 NB (below ground) RM 604.93
f(ii) 80 NB (above ground) RM 417.20
g) 50 NB RM 404.36
h) 25 NB RM 242.30
i) 15 NB RM 171.70
Set of GI Piping beyond deluge valves for transformer including
10(a) detection piping and pipe supports including all accessories. per Set 2,84,869.63
C4F 9
10(b) Erection of Hume pipe as per specification. RM 794.28
11 VALVES
C4F10
(a) 300 NB Gate Each 2,500.00
(b) 250 NB Gate Each 2,122.94
(c) 250 NB Check Each 2,122.94
(d) 200 NB Gate Each 1,667.20
(e) 150 NB Gate Each 1,586.97
(f) 100 NB Gate Each 1,129.66
(g) 80 NB Gate Each 754.18
(h) 80 NB Check Each 754.18
(i) 25 NB Gate Each 276.00
(j) 50 NB Gate Each 604.93
(k) 50 NB Check Each 604.93
(l) 15 NB Each 166.89
(m) Float operated valve 100 NB Each 1,586.97
C4F11 12 INSTRUMENTS
(a) Float operated level gauge Each 1,370.36
(b)Level Switch Each 1,370.36
(c)Pressure Gauge Each 794.28
(d)Pressure Switch Each 1,667.20
(e)Differential Pressure Gauge Each 1,211.50
Deluge valve with motor gounge, [Link], [Link], solenoid valve to
C4F12 13(a) drain - size 150 NB set 7,501.63
20
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item. 2020-21
Description of item Unit
No. No. (in Rs)
C4F13 14 Detection & Alarm System
(a) Ionization smoke detector Each 604.93
(b) Photoelectric smoke detector Each 604.93
(c) Heat detector Each 604.93
(d) Response indicator Each 604.93
(e) Manual call point Each 604.93
(f) Fire detection & Alarm panel Each 604.93
C4F14 15 Portable Fire Extinguishers
Dry chemical powdertype Fire
(a)
extinguishers with all accessories.
(i) 10 kgs. Capacity Each 60.98
(ii) 25 kgs. Capacity (trolley mounted) Each 120.35
(iii) 50 kgs. Capacity (trolley mounted) Each 162.06
(iv) 150 kgs. Capacity (trolley mounted) Each 346.62
(b) CO2 type portable Fire extinguishers
(i) 45 kgs. Capacity (trolley mounted) Each 125.17
(ii) 22.5 kgs. Capacity (trolley mounted) Each 125.17
(iii) 9 kgs. Capacity (trolley mounted) Each 59.37
(iv) 2 kgs. Capacity (Portable ) Each 46.53
(c) 9 Litres capacity Mechanical foam type fire Each 62.56
(d) extinguishers
Sand / water Buckets 9 litres capacity Each 81.84
C4F15 16 Air Conditioning System
Erection, testing and commissioning of Split AC 2 Ton with all
1 suitable accessories Each 5,938.72
21
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item. 2020-21
Description of item Unit
No. No. (in Rs)
Hoisting of Insulators & Hardware, stringing / formation of the
33 kV Bus comprising of 3 phases with DOG Conductor and all
equipment to equipment, equipment to bus interconnections,
(g) LS 17,469.59
jumpering, fixing of clamps & connectors etc. required for the
entire 33kV/440 V station supply switchyard of 400/220 KV
Substation complete as directed by site engineer.
2 33 kV Line :
Erection of pole in position, aligning and setting to work, fixing of cross
arms and top clamps, earthing of supports, fixing of danger boards,
(a) back filling with earth and stones properly ramming including Set 2,023.44
transport of materials from road side to location excluding
concreting and including excavation.
Assembly and erection of [Link] as per specification
which includes fixing of top channels and cross bracings, transport
(b) of all materials from road side to the location, earthing, back filling Set 3,241.35
with earth ramming etc excluding concreting and including
excavation.
Mass concreting of supports erected with CC ([Link]) using 40 mm,
(c) Cum 6,102.41
HBG metal including the cost of metal, sand, cement and curing etc.
Assembly and erection of stay set including fixing of guy insulators,
clamps etc., on the pole and fixing stay wire and binding securely on
(d) either side as per standards, transport of material from road side to Set 405.97
location and back filling with earth ramming etc excluding
concreting and including excavation.
Paving out conductor, providing temporary stays, tensioning, sagging
correctly, fixing strain points, transferring to pin points
(e) binding, fixing of Insulators, guys and jumpering etc., km 14,847.64
including transport of material from road side to location.
( 3phases)
19 Erection of Control and Relay Panels
Receipt from site stores, Transport to control room, handling, Erection,
C4F18 Testing and commissioning of all Control, Relay, Protection and
other Panels/ Equipment, with complete accessories, equipment etc.,
as specified.
400 KV Feeders/ Tie/ 315 MVA Transformer Control/ Relay/
(i) Protection Panels. Each 41,779.71
22
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item. 2020-21
Description of item Unit
No. No. (in Rs)
Installation, Testing and commissioning of Networking Panel,
(a) OWS1, OWS2, EWS Remote work station. BCUs, LIUs, Set 2,61,069.82
Ethernet Switches, Splicing of OFC etc.,
Installation, Testing and commissioning of all necessary
software’s compatible to IEC: 61850 for making the SAS operation in
(b) Set 87,023.81
full shape including remote SCADA complete as directed by site
engineer.
Extension works of Installation, Testing and commissioning of
(c) BCU, LIU, Ethernet Switch,
Splicing of OFC to the existing SAS System.
Per bay
(if it is
(I) FIRST BAY 34,809.20
First
Bay)
(ii) SECOND BAY onwards Per Bay 17,405.39
Extension works of Installation, Testing and commissioning of
all necessary software’s compatible to IEC: 61850, adding new
(d) SLD for the new bay in the existing substation and configuring
all necessary signals and data base for making the SAS operation in full
shape including Remote SCADA as directed by site engineer.
Per bay
(I) FIRST BAY (if it is 87,023.81
First
(ii) SECOND BAY onwards Per Bay 43,511.10
220 V DC Battery & Battery Chargers and AC, DC Distribution Boards
23
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE -VI
Loading / Unloading of materials from departmental / Private
I
vehicles in to the stores yard and stacking and vice-versa
SS Rate for 2020-21
Item (in Rs)
Sl. No. Description of Item Unit
No. Un
Loading
Loading
ST1 I Cement MT 124.93 145.59
2 All other materials
ST2 (i) Steel MT 283.56 283.56
ST3 (ii) Tower parts MT 283.56 283.56
ST4 (iii) RS Joists and rail poles and MS MT 283.56 283.56
Sheets pf various sizes.
3 Cable / Conductor drums (for loading
/ un loading )
ST5 a Panther ACSR Each Drum 311.98 311.98
ST6 b Zebra ACSR Each Drum 436.62 436.62
ST7 c Moose ACSR Each Drum 436.62 436.62
ST8 d Moose ACSR (Huge Drums of Each Drum 641.89 641.89
1.75KM and above)
ST9 e Earth wire Each Drum 187.04 187.04
ST10 f Control cables up to 6 Core Each Drum 187.04 187.04
ST11 g Control cables above 6 Core Each Drum 249.44 249.44
ST12 h 3 1/2 Core LTAC cable drum (up to Each Drum 249.44 249.44
500 meters).
ST13 i 3 1/2 Core LTAC cable drum (above Each Drum 311.98 311.98
500 meters).
4 Other materials received in cases.
ST14 (i) Case weighing not more than Each case 164.47 164.47
100kgs.
ST15 (ii) Case weighing from101kgs to Each case 310.05 310.05
500kgs.
ST16 (iii) Case containg fragile items and Each case 620.25 495.35
weighing more than 501kgs and up
to 1MT
ST17 (iv) for LTAC panel Each 413.93 413.93
ST18 v(a) 70KN Normal disc insulator Each 1.62 1.62
ST19 v(b) 120KN Normal disc insulator Each 2.05 2.05
ST20 v(c) 160KN Normal disc insulator Each 2.44 2.44
ST21 vi(a) 70KN Anti-fog disc insulator Each 2.05 2.05
ST22 vi(b) 120KN Anti-fog disc insulator Each 2.44 2.44
ST23 vi(c) 160KN Anti-fog disc insulator Each 3.27 3.27
(vii) Loading / Un loading and stacking
charges for 70KN /120KN SRC
insulators.
ST24 (a) 132kV Each string 3.27 3.27
ST25 (b) 220kV Each string 4.08 4.08
24
File No.ENE51-PM0SYI(400)/12/2021-EE2
ST26 (viii) Loading / Un loading and stacking Each string 4.77 4.77
charges for 120KN /160KN SRC
insulators for 400kV .
5 Cases containing Control & Relay
Panels
ST27 (a) 33kV Each 413.93 413.93
ST28 (b) 132kV and 220kV Each 516.00 516.00
6 Cases containing CTs, PTs, CVTs 0.00
ST29 (i) 11kV to 33kV Rating Each case 92.79 92.79
ST30 (ii) Above 33kV and up to 132kV Each case 623.67 623.67
ST31 (iii) 220kV Rating Each case 930.06 930.06
7 Cases containing LAs
ST32 (i) 33kV Each case 16.45 16.45
ST33 (ii) 132kV Each case 310.05 310.05
ST34 (iii) 220kV Each case 413.93 413.93
8 Loading / Un-Loading of
ST35 1 33kV Breaker Each set 763.45 763.45
ST36 2 132kV CB Each set 2,478.60 2,478.60
ST37 3 220kV SF6 CB Each set 3,096.70 3,096.70
ST38 4 Station Transformer (100KVA) Each set 475.76 475.76
ST39 5 Station Transformer (250KVA) Each set 569.97 569.97
ST40 6 220V 80AH Battery (Conventional) Set 1,032.27 1,032.27
(Lead Acid)
ST41 7 220V 80AH Battery (VRLA) Set 723.97 723.97
(Maintenance Free)
ST42 8 220V 200AH Battery Set 1,134.36 1,134.36
(Conventional) (Lead Acid)
ST43 9 220V 400AH Battery Set 1,652.40 1,652.40
ST44 10 220V Battery Charger with DC Set 620.25 620.25
distribution Board
ST45 11 DCDB for battery Charger. Each 206.08 206.08
ST46 12 132kV Hardware single Set 14.54 14.54
ST47 13 132 KV Hardware double Set 15.08 15.08
ST48 14 220 kV Hardware single Set 20.53 20.53
ST49 15 220 KV Hardware double Set 21.89 21.89
ST50 16 220 KV Isolators, without insulators Set 620.25 620.25
including machanism box
ST51 17 220kV Solid core insulators Each 83.06 83.06
ST52 18 132 KV Isolators (without soild core Each 465.03 465.03
insulators)
ST53 19 132kV Solid core insulators Each 51.11 51.11
ST54 20 33 KV Isolators (without soild core Each 206.08 206.08
insulators)
ST55 21 33kV Solid core insulators Each 5.86 5.86
ST56 22 Vibration dampers, mid span 100 Nos 206.08 206.08
compression joints, repair sleeves,
clamps & connectors etc
23 Capacitor Banks
25
File No.ENE51-PM0SYI(400)/12/2021-EE2
Note: - If loading / Un loading is done with Crane, 1/3 rd Charges are to be paid
towards labour chargesand remaining amount is towards crane hire
[Link]: Loading charges of 100 kVA Station Transformer is Rs. 416.49
and in case is loaded by using a crane then labour charges would be Rs.138.83 &
Loading and Un loading and counting at Stores for check measuring and Stock
II.
Verificaiton Purpose
SSR for
Item
Sl. No. Description of Item 2020-
No.
21(Rs.)
ST78 43 Tower parts counting on part wise and restocking at 103.98
stores yard ( for stock verification purpose)
26
File No.ENE51-PM0SYI(400)/12/2021-EE2
27
File No.ENE51-PM0SYI(400)/12/2021-EE2
28
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE – VII
TRANSPORTATION, HANDLING CHARGES INVOLVED DURING ERECTION OF 400KV
TRANSMISSION LINES
SS Rate for 2020-
Item. 21
Sl. No. Description of Item Unit
No. (in Rs)
1 2 3 4 5
Total cost for transportation and handling
C4H1 1 Charges for Setting of Stub with Stub setting Each Set 949.93
template.
Erection of Tower: Total cost for
C4H2 2 transportation and handling Charges. Per MT 749.35
29
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE -VIII
TRANSPORT OF EQUIPMENTS / MATERIALS
Per Load
[Link]. Item No. Description of Item SSR
2020-21
The following are the minimum materials /
equipment, for each load. One Load = 9.0 MT
1 CTs, PTs, & CVTs:
T.1 1.a 220 kV 2 Nos.
T.2 1.b 132 kV 3 Nos.
T.3 1.c 33 kV 12 Nos.
NOTE: For transport of 220kV CTs, PTs &CVTs
extra provison may be added for each load
towards labour for clearing the obstructions 244.67
like electrically and telephone lines as the
equipment are very tall.(In Rupees)
2 SF6 Circuit Breakers:
T.4 2.a 220 kV 1/2 sets
T.5 2.b 132 kV 2/3 sets
T.6 2.c 33 kV 2 Nos.
Isolators with or without Earth switch
3
including post type insulators:
T.7 3.a 220 kV 1 set.
T.8 3.b 132 kV 2 Sets
T.9 3.c 33 kV 8 Nos.
4 Lighting Arrestors:
T.10 4.a 220 kV 6 Nos.
T.11 4.b 132 kV 6 Nos.
T.12 4.c 33 kV 24 Nos.
5 Control & Relay panels: 6 Nos.
6 ACSR Conductor and Earth wire drums:
T.13 6.a ACSR moose 3Nos.
T.14 6.b ACSR Zebra 4Nos.
T.15 6.c ACSR Panther 6Nos.
T.16 6.d Earth wire of 2 km per each drum 8Nos.
T.17 6.e Earth wire of 3 km per each drum 6 Nos.
T.18 6.f CABLE DRUMS 10Nos.
7 Disc Insulators
T.19 7.a 70 KN 1000 Nos.
T.20 7.b 120KN 800 Nos.
8 Silicon Rubber Insulators
T.21 8.a 70 KN 275 Nos.
T.22 8.b 120KN 228 Nos.
9 Wave Traps
T.23 9.a 220kV 6 Nos.
T.24 9.b 132kV 16 Nos.
30
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE - IX
RATES FOR HANDLING & ERECTION OF POWER TRANSFORMERS
SS Rate for
Sl. Item
Description of Item Unit 2020-21
No. No.
(in Rs)
1 2 3 4
A) HANDLING AS JOB WORK BY DEPARTMENT
1 Loading/Unloading of T&P such as wooden sleepers,
winch jacks, packing pieces etc., required for handling the
power transformers.
PT1 a Up to 31.5 MVA transformers, one load of wooden sleepers Load
and another load of T&P such as chain pulley block and rail 1,363.40
poles etc (Maximum two loads)
PT2 b For above 31.5 MVA and up to 100 MVA transformers, two Load
loads of wooden sleepers and another load of T&P such as
1,363.40
chain pulley block, winch and rail poles etc (Maximum three
loads)
PT3 c For the above 100 MVA and up to 160 MVA transformers, Load
three loads of wooden sleepers and another load of T&P such 1,363.40
as winch machine and rail poles etc (Maximum Four loads)
2 Loading/Unloading of fragile material such as
a) LV bushing / Neutral bushing for 132 kV transformer
PT4 (i) Loading Each 40.77
PT5 (ii) Unloading Each 32.63
b) 132kV Bushings 0.00
PT6 (i) Loading Each 160.40
PT7 (ii) Unloading Each 160.40
c) 220kV Bushings 0.00
PT8 (i) Loading Each 320.80
PT9 (ii) Unloading Each 320.80
NOTE :If loading / Un loading is done with Crane, 1/3rd
Charges are to be paid towards labour charges and remaining
amount is towards crance hire charges.
PT10 3 Loading/Unloading of accessories of transformer including Load
raidator, pipe line, FCC & RTCC panels, conservator tank,
turrets LA set frames and oil barrels 'A' frame and header etc., 2,256.51
(For 50MVA and above 50 MVA PTRs without oil barrels)
31
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item
Description of Item Unit 2020-21
No. No.
(in Rs)
e Transformers above 100MVA and upto 160 MVA capacity
PT19 Up to 10 Mtrs. LS 12,170.13
PT20 Over and above 10 Mtrs. RM 1,217.96
5 Turning the transformer through 90 degrees including
making arrangements as above.
PT21 a Transformers upto 16 MVA capacity Each 3,214.84
PT22 b Transformers above 16MVA and upto 31.5 MVA capacity Each 4,031.78
PT23 c Transformers above 31.5MVA and upto 50 MVA capacity Each 5,014.58
PT24 d Transformers above 50MVA and upto 100 MVA capacity Each 5,737.76
PT25 e Each
Transformers above 100MVA and upto 160 MVA capacity 7,171.85
6 Turning the transformer through 180 degrees including
making arrangements as above.
PT26 a Transformers upto 16 MVA capacity Each 5,573.28
PT27 b Transformers above 16MVA and upto 31.5 MVA capacity Each 6,701.52
PT28 c Transformers above 31.5MVA and upto 50 MVA capacity Each 7,896.39
PT29 d Transformers above 50MVA and upto 100 MVA capacity Each 8,774.51
PT30 e Transformers above 100MVA and upto 160 MVA capacity Each 10,528.06
PT31 7(a) 1 Job
Anchoring of transformer including excavation of trench of 4
x 1x0. 5 mtrs for anchoring and burying 2 Nos. sleepers in it 1,363.40
and removing the same after work is completed.
PT32 7(b) Movement of 10 MT winch for anchoring. 1 Job 1,234.27
8 Lifting/Lowering the transformer main tank to the
required height of one sleeper using jacks and wooden
sleepers packing pieces for loading onto /from the truck.
PT33 a Transformers upto 16 MVA capacity Each 3,901.30
PT34 b Transformers above 16MVA and upto 31.5 MVA capacity Each 6,012.35
PT35 c Transformers above 31.5MVA and upto 50 MVA capacity Each 7,485.86
PT36 d Transformers above 50MVA and upto 100 MVA capacity Each 9,978.88
PT37 e Transformers above 100MVA and upto 160 MVA capacity Each 12,768.25
9 Pulling the transformer from platform to the truck for
loading/ from truck to the platform for unloading
PT38 a Transformers upto 16 MVA capacity Each 3,281.45
PT39 b Transformers above 16MVA and upto 31.5 MVA capacity Each 5,737.76
PT40 c Transformers above 31.5MVA and upto 50 MVA capacity Each 6,376.64
PT41 d Transformers above 50MVA and upto 100 MVA capacity Each 7,973.87
PT42 e Transformers above 100MVA and upto 160 MVA capacity Each 10,776.81
10 Fixing of transformer wheels to main tank including
alignment of transformer etc.,
PT43 a Transformers upto 16 MVA capacity Job 1,517.02
PT44 b Transformers above 16MVA and upto 31.5 MVA capacity Job 1,790.24
PT45 c Transformers above 31.5MVA and upto 50 MVA capacity Job 2,607.21
PT46 d Transformers above 50MVA and upto 100 MVA capacity Job 3,377.94
PT47 e Transformers above 100MVA and upto 160 MVA capacity Job 5,005.08
PT48 11 Arranging gas cutter equipment at site including operator and Job
helper to remove anchoring of transformer main tank on truck 2,486.23
for loading and unloading (including cost of gas)
12 Removal of steel rope and turn buckles of transformer
main tank on truck.
32
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item
Description of Item Unit 2020-21
No. No.
(in Rs)
PT49 (a) Up to 100MVA Capacity Job 683.75
PT50 (b) above 100MVA and up to 160MVA Capacity Job 1,023.57
13 Tieing the transformer main tank on to the truck with steel
rope and turn buckles
PT51 (a) Up to 100MVA Capacity Job 879.49
PT52 (b) above 100MVA and up to 160MVA Capacity Job 1,315.83
14 Assisting for lifting of overhead live lines, while transporting
of transformers by truck.
PT53 (a) Up to 100MVA Capacity Job 1,926.19
PT54 (b) above 100MVA and up to 160MVA Capacity Job 3,849.64
B) ERECTION OF POWER TRANSFORMERS AS JOB
WORK BY DEPARTMENT
1 Opening of crates and keep ready for erection of accessories
of transformers
PT55 a Transformers upto 16 MVA capacity Job 2,143.68
PT56 b Transformers above 16MVA and upto 31.5 MVA capacity Job 2,679.26
PT57 c Transformers above 31.5MVA and upto 50 MVA capacity Job 3,585.93
PT58 d Transformers above 50MVA and upto 100 MVA capacity Job 4,303.66
PT59 e Transformers above 100MVA and upto 160 MVA capacity Job 5,737.76
2 Shifting, loading dragging of accessories of transformers like
radiator, conservator tank, pipe line, fans, headers, DM box,
FCC, oil barrels etc., from place of storage to work spot and
vice versa of transformers.(For 50MVA and above 50 MVA
PTRs without oil barrels)
PT60 a Transformers upto 31.5 MVA capacity Job 3,214.84
PT61 b Transformers above 31.5MVA and upto 100 MVA capacity Job 4,290.06
PT62 c Transformers above 100MVA and upto 160 MVA capacity Job 5,892.71
PT63 d Transportation of oil barrels from unloading place to the filter Job
3,206.68
machine in the substation.
3 Erection of Radiators to the transformers including headers 0.00
PT64 a Transformers upto 16 MVA capacity Job 2,385.63
PT65 b Transformers above 16MVA and upto 31.5 MVA capacity Job 3,822.45
PT66 c Transformers above 31.5MVA and upto 50 MVA capacity Job 4,750.88
PT67 d Transformers above 50MVA and upto 100 MVA capacity Job 5,823.40
PT68 e Transformers above 100MVA and upto 160 MVA capacity Job 7,938.52
4 Erection of main conservator tank.
PT69 a Transformers upto 16 MVA capacity Each 2,151.85
PT70 b Transformers above 16MVA and upto 31.5 MVA capacity Each 2,392.44
PT71 c Transformers above 31.5MVA and upto 50 MVA capacity Each 3,509.81
PT72 d Transformers above 50MVA and upto 100 MVA capacity Each 5,465.89
PT73 e Transformers above 100MVA and upto 160 MVA capacity Each 7,035.92
PT74 f Pronal bag testing and commissioning Each 2,366.62
PT75 g Hiring of compressor Each 1,658.38
PT76 h Dry Nitrogen Cylinder (In case, Dry Nitrogen Cylinder is used Each
for commissioning of Air cell instead of Air compressor), 2,597.70
excluding transportation cost.
5 Erection of transformer bushing
PT77 a 33 kV Neutral and teritary bushings Each 468.98
PT78 b(I) 132 kV bushings up to 100MVA. Each 872.70
PT79 b(ii) 132 kV bushings for above 100MVA and up to 160MVA Each 1,092.91
PT80 c(I) 220 kV bushings up to 100MVA Each 1,311.77
PT81 c(ii) 220 kV bushings for above 100MVA and up to 160MVA Each 1,625.77
33
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item
Description of Item Unit 2020-21
No. No.
(in Rs)
PT82 d(I) 220kV 3 Nos. erection of turrets up to 100MVA Job 1,877.24
PT83 d(ii) 220kV 3 Nos. erection of turrets for above 100MVA and up to Job
2,463.10
160MVA
PT84 e(I) 132kV 3 Nos. erection of turrets up to 100MVA Job 880.84
PT85 e(ii) 132kV 3 Nos. erection of turrets for above 100MVA and up Job
1,291.38
to 160MVA
PT86 6 Erection of air blowers (cooling fans) including frames and Job
3,547.87
control cubical etc., (for each transformer)
PT87 7 Erection of LA frames (HV & LV side) Each 1,113.30
PT88 8(a) I).Erection of driving mechanism box, bevel gear of OLTC Each
1,113.30
for below 100MVA..
PT89 ii).Erection of driving mechanism box, bevel gear of OLTC Each
2,226.61
100MVA and above 100MVA.
PT90 8(b) ii).Erection of OLTC conservator tank with stand for up to Each
1,438.16
100MVA.
PT91 ii).Erection of OLTC conservator tank with stand for above Each
2,151.85
100MVA and upto 160MVA.
9 Erection of pipe line.
PT92 a Transformers upto 31.5 MVA capacity Each 753.06
PT93 b Transformers above 31.5MVA and upto 50 MVA capacity Each 1,125.54
PT94 c Transformers above 50MVA and upto 100 MVA capacity Each 1,907.15
PT95 d Transformers above 100MVA and upto 160 MVA capacity Each 2,384.29
PT96 10 I).Erection of Thermometer, pressure Relief valve and vent Each
753.06
pipe etc.,
PT97 ii)Erection of Thermometer, pressure Relief valve and vent Each
1,125.54
pipe etc.,100MVA and above PTRs.
11 Erection of detachable OLTC including connecting internal
jumper with OLTC tank.
PT98 a Transformers upto 31.5 MVA capacity Each 3,698.76
PT99 b Transformers above 31.5MVA and upto 100 MVA capacity Each 5,573.28
PT100 c Transformers above 100MVA and upto 160 MVA capacity Each 6,213.52
PT101 12 I).Erection of separate, cooler bay including 'A' frame header Bay
pipes and bends of transformers up to 100 PTRs MVA 7,973.87
capacity.
PT102 ii).Erection of separate, cooler bay including 'A' frame header Bay
pipes and bends of transformers above 100 MVA and up to 8,774.51
160MVA PTRs capacity.
13(I) Removal of old worn out gaskets and replacement with new
gaskets including cutting, pasting of gasket with all
accessories including cost of adhesives. Excl. top cover
PT103 a Transformers upto 16 MVA capacity Job 3,084.33
PT104 b Transformers 31.5MVA and 50 MVA capacity Job 4,793.01
PT105 c Transformers 100 MVA and upto 160 MVA capacity Job 6,167.31
13(II) Removal of old worn out gaskets and replacement with new
gaskets including cutting, pasting of gasket with all
accessories including cost of adhesives. for top cover. The
following rates are exclusive of crane hire charges which are
payable at actuals.
PT106 a Transformers upto 16 MVA capacity Job 1,544.21
PT107 b Transformers 31.5MVA and 50 MVA capacity Job 1,885.40
PT108 c Transformers 100 MVA and upto 160 MVA capacity Job 2,225.23
PT109 14 Erection of supporting insulators and earth flat for HV & LV Job
753.06
Neutrals / Tertiary.
C OIL FILTERATION OF TRANSFORMERS AS JOB
WORK BY DEPARTMENT
34
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item
Description of Item Unit 2020-21
No. No.
(in Rs)
PT110 1 Loading / Unloading of 2KL Oil filter. Job 2,633.03
PT111 2 Laying of [Link] from AC Supply point to filter Job
connecting Pipes etc, from filter to transformer and back to 1,272.33
filter and Vice-versa.
PT112 3 Loading / unloading of full transformer oil barrels. Barrel 51.67
PT113 4 Loading / unloading of oil drums. Barrel 8.15
5 Oil topping for transformer through oil filter:
5.1 Transformer already filled with oil
PT114 a Transformers upto 31.5 MVA capacity Each 1,011.35
PT115 b Transformers above 31.5MVA and upto 50 MVA capacity Each
2,226.61
when the transformer is received with transformer oil
PT116 5.2 Transformers above 50MVA upto 160 MVA capacity When Barrel
32.63
the transformer is received empty with Nitrogen
6 Assisting labour for filtering of oil for a period of 5 days
during filteration of oil
PT117 a For a period of 5 days for Transformers upto 31.5 MVA Each
4,807.97
capacity
PT118 b For a period of 5 days for Transformers above 31.5 MVA and Each
6,731.44
upto 100 MVA capacity
PT119 c For a period of 5 days for Transformers above 100 MVA and Each
9,618.66
upto 160 MVA capacity
PT120 a Over and above 5 days for Transformers upto 31.5 MVA per day
961.04
capacity
PT121 b Over and above 5 days forTransformers above 31.5 MVA and per day
1,345.74
upto 100 MVA capacity
PT122 c Over and above 5 days forTransformers above 100 MVA and per day
1,923.46
upto 160 MVA capacity
PT123 7(I) Dismantling of control cables of power transformer for Job
arranging, pulling of transformer maintank out of plinth for 889.01
failed transformer or improvement of transformercapacity.
PT124 (ii) Laying of control cables for the transformers which are Job
received with non completion of wiring on the transformer 2,366.62
and complete wiring of the transformer on the tank.F.C.C,D.M
box etc., (for old repaired transformers).
PT125 8 Shifting of filter machine in switch yard from existing place to RM
near transformer or to the convenient place manually (where 110.10
movement of tractor trailer is not possible).
9 Labour charges for arrangement for vaccum filling for the
power transformer for prescribed time duration for 50MVA
and above PTRs which are received at site with nitrogen gas
filled.
PT126 (a) Below 100MVA PTRs Job 3,547.87
PT127 (b) Above 100MVA PTRs. Job 7,098.46
PT128 10 Loading / Unloading of 5 KL Storage tanker. Job 1,174.47
11 Hire charges for a private tractor for transport of 6 KL of oil
filter.
PT129 Up to 50 KM LS 5,570.54
PT130 Beyond 50 KM per KM
107.40
12 Providing of oil tanker on daily hire charges
PT131 a 10 KL capacity Per day 1,746.74
PT132 b 20 KL capacity Per day
3,202.59
13 Transportation of 10 KL & 20 KL oil tanker (including
return trip charges), (a) or (b) only applicable
PT133 Minimum amount upto 50 KM LS 8,733.75
35
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item
Description of Item Unit 2020-21
No. No.
(in Rs)
PT134 More than 50 KM KM 43.49
14 Unloading of oil tanker at site and loading the same after
0.00
completion of the job
PT135 10 KL capacity Job 6,913.59
15(i) Complete wiring up of the transformer indicating systems
cooler control fans and motor driving mechanism of OLTC
panel providing suitable ferrules and lugs.
PT136 a) 16/31.5 MVA Transformer LS 20,853.57
PT137 b) 50 MVA Transformer LS 27,113.32
PT138 c) 100 MVA Transformer LS 30,071.24
PT139 d) 160 MVA Transformer LS 30,071.24
15(ii) Complete wiring up of the transformer indicating systems
cooler control fans and motor driving mechanism of OLTC
panel providing suitable ferrules and lugs excluding OLTC
panel
PT140 a) 16/31.5 MVA Transformer LS 10,427.45
PT141 b) 50 MVA Transformer LS 13,555.30
PT142 c) 100 MVA Transformer LS 15,034.26
PT143 d) 160 MVA Transformer LS 15,034.26
PT144 16 Draining of oil from main tank of the transformer into empty KL
oil drums and stacking them neatly as directed by the 508.39
APTRANSCO Engineer at site.
PT145 17 Unloading of 20 KL oil storage taken at site and loading the Job
7,552.48
same after comletion of the job
D) Insurance for fragile material during transportation, erection,
dismantling may be paid as per actuals from department side
for department works.
36
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE - X
Rates for O&M works of EHT Lines
SS Rate for
Sl. Item 2020-21
Description of work Unit
No. No. (in Rs)
1 2 3 4
OM1 (a).Providing of Vibration dampers ( for 220 KV & 132 KV Each
1 154.97
lines) (Excluding Material & Transportation cost)
OM2 (b). Providing of spacer damper for 400 KV twin Moose lines Each
212.06
(Excluding Material & Transportation cost)
Painting of towers with two coats of aluminum paint using
Aluminum paint 1st grade containing 306 Kg of Aluminum
2 paste for 18 liters of thinner 1st coat is to be applied before
erection of towers and 2nd coat after stringing and half round
welding including cost of paint, cost of brushes, labour
charges etc., complete.
OM3 First coat of 1st Grade Aluminum Paint duly scratching and MT
a) cleaning of towers including labour charges, cost of paint, 4,950.71
brushes etc.
OM4 Labour charges for painting including scratching and cleaning MT
b) of towers of 1st coat of Alluminum with out cost of paint & 1,386.53
brushes.
OM5 (*) Second coat of 1st Grade Aluminium Paint duly scratching MT
c) and cleaning of towers including labour charges, cost of pint, 2,896.74
brushes, etc.
OM6 (*) Labour charges for painting including scratching and MT
d) cleaning of towers of 2nd coat of Aluminum with out cost of 785.69
paint & brushes.
(*) : The requirement of 2nd coat is to be justified by the
concerned Divisional Engineer/Executive Engineer before
execution of the work.
Painting of towers with single coat of red oxide paint of 1st
3
Grade, including scratching and cleaning of towers.
OM7 One coat of 1st Grade Red Oxide Paint including labour MT
a) charges for scratching and cleaning of towers including cost of 3,100.63
paint, brushes etc.
OM8 Labour charges for painting of towers including scratching and MT
b) cleaning of towers without cost of paint & brushes. 1,719.56
OM9 Providing of Arcing Horns for 132 KV line on both tower side per
4 and line side i.e. two per string (Excluding Material & string 1,241.06
Transportation cost)(with lefty & Pullies)
OM10 Providing of Arcing Horns for 132 KV line (Excluding Each
5 154.97
Material & Transportation cost)(without lefty & Pullies)
OM11 Providing of Arcing Horns for 220 KV line on both tower side per
6 and line side i.e. two per string (Excluding Material & string 1,821.51
Transportation cost)(with lefty & Pullies)
OM12 Providing of Arcing Horns for 220 KV line (Excluding Each
7 154.97
Material & Transportation cost)(without lefty & Pullies)
OM13 Providing of Missing angles/ Replacement of rusted angles on Per
8 the existing towers departmentally (including transporaton each 138.64
charges & Excluding cost of tower parts, bolts & nuts)
37
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Sl. Item 2020-21
Description of work Unit
No. No. (in Rs)
38
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE - XI
LABOUR CHARGES SSR PROPOSAL FROM TELECOM WING
SS Rate for
[Link]. Description Unit 2020-21
(in Rs)
1 Erection of PLCC panel in 220KV/132KV SS Each 7,705.82
2 Erection of LMU Each 1,286.73
3 Erection of Wave Trap
Fixing of wavetrap on pedastal mounting insulator stack in
i Each 7,200.74
400KV
Fixing o f the wave trap on pedastal mounting insulator stack in
ii Each 5,835.40
200KV
Fixing of the wave trap on Suspension mounting including
iii Each 3,478.83
jumpering in 132KV
Erection and commissioning of 48V DC/50A, 35A Battery
4 Each 2,542.37
charger in 220KV/132KV SS
Erection and commissioning of 48V DC/100A/150A Battery
5 Each 2,542.37
charger in 400 KV SS
Erection and commissioning of 48V/200AH & 250AH battery
6 Each 5,000.00
sets in 132 & 220 KV SS
Erection and commissioning of 48V/300AH battery sets in 132 &
7 Each 5,500.00
220 KV SS
8 Erection and commissioning of 48V/400AH battery set in 400 kV Each 6,000.00
SS
Erection and commissioning of OLTE & MUX (Optical line
9 Each 25,342.83
terminal equipment)
Erection and commissioning of FDP(Fibre Distribution Panel) in
10 Each 11,089.69
400KV/220KV/132KV SS (12F/24F/48F)
39
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
[Link]. Description Unit 2020-21
(in Rs)
Splicing charges for OFC fibres laid on 132KV, 220KV, 400KV
27 lines in plane Areas/Forest/ Hill Areas/ Municipal limits,
separately for each case
Each fibre
i For plane area 609.88
splice
Each fibre
ii for agency or tribal area 762.36
splice
Each fibre
iii for Hill areas 852.96
splice
Each fibre
iv for interior area 852.96
splice
for municipal corporation areas (upto 12 Kms from Each fibre
v 762.36
municipalities) splice
Each fibre
vi for municipalities (upto 12 Kms from municipalities) 731.87
splice
28 Fixing of ADSS type OFC to the tower members with ties, clamps
i etc.220kv/132 kv
for Each 2,106.22
ii for 400kv Each 2,632.78
29 Laying of aerial type OFC on 33KV/11KV HT/LT poles KM 12,404.43
Laying of 6 pair telephone cable in the trenches in 132KV,
30 KM 9,387.40
220KV & 400KV
31 Laying of Cat 5E/6 Cables in Offices. KM 4,814.06
Laying of Cat 5E/6 Cables with Conduit pipes along with
32 KM 14,442.17
accessories in Offices.
33 Fixing of 6U × 19 inch Rack in Offices for ERP works Each 401.17
Laying of single pair telephone cable in the trenches in 132KV,
34 KM 8,665.30
220KV & 400KV
Laying of 25sq mm battery cable in control room in 132kv,
35 KM 20,459.74
220KV & 400KV
Laying of Co-axial cable from switch yard gantry tower to
36 KM 19,641.35
communication room in the existing trench
37 Laying of 6 pair telephone cable on overhead poles LT & HT KM 7,221.08
38 Laying of single pair telephone cable on overhead poles LT & HT KM 7,221.08
39 Laying of RF cables in 132KV, 220KV & 400 KV SS KM 19,641.35
Digging of 1 X 1 X 1 ([Link]) ducts for laying of telephone cable
40 [Link] 748.17
in 132KV, 220KV, 400KV SS
Excavation, refilling & closing of ducts of 1 X 1 X 1 ([Link]) in
41 [Link] 1,496.34
132 KV, 220KV and 400 KV SS premises
Erection of earth pit as per standards in 132KV, 220KV SS for
42 Each 15,499.65
communication purpose
43 Erection of earth pit as per standards in 400 KV SS Each 15,499.65
44 Erection of VSAT equipment in 132KV, 220KV, 400 KV SS Each 7,339.02
45 Dismantling of VSAT equipment of 132KV, 220KV, 400 KV SS Each 3,669.51
Loading/unloading charges for PLCC equipment in 132KV SS,
46
220KV/400KV in to vehicle
i for single channel PLCC pannel Each 748.17
ii for Twin channel PLCC pannel Each 748.17
47 Loading/unloading charges for 48V/35A, 50A, chargers Each 748.17
48 Loading/unloading charges for 48V/100A/150A chargers Each 1,122.25
49 Loading/unloading charges for OLTE/MUX equipment Each 1,122.25
50 Loading/unloading charges for RTU panels Each 1,122.25
51 Loading/unloading charges for EPAXs Each 374.08
Loading/unloading charges for battery sets 48V/150 AH, 200 AH
52
,250 AH, 300 AH, 400 AH
i for 150 AH/200 AH Each 748.17
ii for 250 AH/300AH Each 748.17
iii for 400AH Each 1,122.25
40
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
[Link]. Description Unit 2020-21
(in Rs)
53 Loading/unloading charges for LMUs Each 374.08
54 Loading/unloading charges for Wavetrap
i 132KV wave trap Each 374.08
ii 220KV Wave Trap & 400 KV Each 748.17
55 Dismantling of exisiting PLCC chargers (35A, 50A, 100A)
i 35/50A Each 1,778.72
ii 100A Each 5,175.31
56 Dismantling of existing 48V/165AH, 200AH, 250AH,300AH Each 4,036.31
57 battery sets of existing 48V/400 AH battery sets
Dismantling Each 5,362.35
58 Dismantling of existing RTU, OLTE/MUX equipment
i RTU Each 9,790.22
ii OLTE/MUX Each 3,852.92
59 Dismantling of EPAXs Each 1,591.67
Dismantling of wave traps on 132 KV/220KV SS/400 KV SS
60
separately
i 50% of Erection of 2000A/1 m H Wave Trap(400 kv) Each 3,600.37
ii 50 % of Erection of 1250A/0.5 mH Wave Trap(220 kv) Each 2,917.70
iii 50% of Erection of 630A/0.2mH Wave Trap (132 KV) Each 1,739.42
Dismantling of 12F/24 F ADSS cable from 132KV, 220KV SS
61 Each 18,720.91
lines
Dismantling of 12F/24/48 F OPGW cable from 132KV, 220KV
62 Each 39,773.65
SS,400KVSS lines
Dismantling and bringing down of splice boxes on 132KV,
63 Each 1,930.68
220KV towers
64 Dismantling and bringing down of splice boxes on 400KV towers Each 2,413.35
Hiring charges of 5 KVA Diesel Generator per day for attending
65 Each 1,139.33
OFC break down works
Hiring charges of 230V AC inverter (2KVA) with battery backup
66 Each 1,139.33
for attending OFC break down works
Hiring charges of 8X8X10([Link]) closed tent shutter for attending
67 Each 802.34
splicing works for attending OFC break down works
68 Dismantling of VHF 30 ft masts with Gay wires etc. Each 2,349.30
69 Dismantling of 10 ft/20 ft trylon masts Each 1,896.62
UGOF cabling works rates
Survey & documentation
Survey of route, providing as built drawing, documentation for
70 Km 4,756.82
unarmoured underground optical fibre cable
Excavation &Backfilling
All types of soil, road, footpath, including PCC, sand, warning
71 brick/stone, semi-circular RCC split cover etc. for underground Km 1,90,121.67
fibre optic cable.
72 Warning Tape (including supply and installation). Km 28,526.40
73 Laying of PLB HDPE pipe O.D. 40mm Km 13,507.76
74 Installation of HDPE pipe by Trenchless digging
(a) 0-10 mtrs mtr 759.81
(b) > 10 and up to 30 mtrs mtr 855.87
(c) More than 30 mtrs mtr 950.49
75 Laying of GI pipe 100mm (Nominal bore), Including accessories. mtr 241.63
Laying of RCC hume pipe (NP3), 100mm Diameter (Inside),
76 mtr 362.44
Including accessories.
laying of unarmoured UG OFC 24F/48F (DWSM) with HDPE
77 Km 28,527.86
duct in case of underground works
Installation of Joint box in underground (Including splicing &
78 No. 5,947.49
testing) - 24 Fibers
79 Erection of RCC Joint Chambers No. 5,065.41
41
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
[Link]. Description Unit 2020-21
(in Rs)
Installation of PLB HDPE pipe on wall in building premises
80 mtr 480.34
including routing of OFC through it
Reinstatement of excavated area/damages (in road, pavement,
81 [Link] 240.17
footpath etc.)
82 Main Distribution frame (100 pairs) No. 2,378.42
83 Split type AC Units including Stabilizer No. 6,513.09
42
File No.ENE51-PM0SYI(400)/12/2021-EE2
Annexure-XII (a)
43
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item 2020-21
[Link]. Description of Material/Work UNIT
No. (in Rs)
U1S 8 f) Across the road In HDPE pipes (thickness 10mm) to
cross CC or BT road and other service lines including
Rmt 11,302.88
cost of concrete cost of HDPE pipes of 250 mm dia etc.
complete
U1S 9 g) Across the road In HDPE pipes (thickness 10mm) to
cross CC or BT road with hard rock and other service
Rmt 26,610.35
lines including cost of concrete cost of HDPE pipes of
250 mm dia etc. complete
U1S 10 h) Cable laying in built up trenches, cable trays and
supports etc. complete including cost of trays and Rmt 11,302.88
support etc, complete.
U1S 11 i) Cable laying across the culverts and over bridges etc.,
Rmt 11,302.88
complete in PVC pipes of 250 mm dia in complete
U1S 12 j) Cable laying by clamping on special type tower
including earthing cable from termination to Link box Rmt 10,874.69
including cost of Aluminum clamps
U1S 13 k) Cable laying while clamping bare on the walls , ceiling
Rmt 4,078.00
and structures including cost of clamps in complete
U1S 14 l) shape
Cable laying across the railway tracks Rmt 27,186.72
U1S 15 m) Cable laying by clamping on Sub-station structures like
CPL etc., including earthing cable from termination to Rmt 2,039.01
Link box including cost of Aluminum clamps.
2.2 Including excavation and excluding backfilling
without cable laying
U1S 16 a) Hard Gravel soils, BC Soils, Red Earth, stone & Earth
Rmt 11,554.35
mixed with fair size boulders etc.,
U1S 17 b) Hard rock with CC or BT Road surfaces etc. Rmt 4,078.00
2.3 Excluding excavation and including backfilling 0.00
U1S 18 a) Hard Gravel soils, BC Soils, Red Earth, stone & Earth
Rmt 1,699.17
mixed with fair size boulders etc.,
U1S 19 b) Hard rock with CC or BT Road surfaces etc. Rmt 5,437.35
U1S 20 2.4 Only excavation and back filling of soil without laying
Rmt 2,039.01
of cable
U1S 21 2.5 Excavation and backfilling of suitable thermal backfill
for maintainings soil thermal resistance value of 120 Cum 5,437.35
44
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item 2020-21
[Link]. Description of Material/Work UNIT
No. (in Rs)
U1S 28 d) [Link] core copper cable conductor PVC
insulated 6.6KV grade on pole mounted termination Rmt 20.39
tower including cost of cleats.
4 For pulling optical fiber cable the following items
shall be done while excavation of trenches as per
U1S 29 a) specifications
Supply of HDPE duct pipe of OD/ID 40/33 mm dia and
associated material of standard make as per the
specification of the contract/tender and laying jointing,
RM 135.92
bedding of above HDPE duct pipe in the already
excavated XLPE cable trench including sealing the
section ends as per the specification of the
U1S 30 b) Supply of RCC joint chambers (1200/760/50 mm)
W/L/T with base and top plates as per the
specification of the contract/tender and erection of Each 9,515.35
RCC joint chambers for every 1KM in HDPE duct
enroot as per the specification of the contract/tender.
45
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item 2020-21
[Link]. Description of Material/Work UNIT
No. (in Rs)
5 CABLE JOINTING
Jointing of cable excluding cost of pre-moulded
straight through joints, Protection box, 3-phase solid
bond link box without SVL / 3-phase cross bond link
box with SVL, including excavation of pit for single
circuit cable, providing cement concrete base and walls
etc. including cost of cement, steel etc., labour charges
and all incidental items of work for finished item of
work including design of pit providing joint bay
identification mark including providing necessary
T&P for jointing viz., tarpaullin tent, DG Set, Air
Conditioner etc., complete wherever necessary for
complete item of work. This includes loading, un-
loading and transportation of all materials to work spot
U1S 31 a) as perexcavation
With drawing andof preparation of joint
joint bay size bay. and laying
(9mX4m)
Nos. 4,07,800.83
of CC([Link]) bed and sand bed and back filling
U1S 32 b) Jointing charges for cross bonding joints/normal joints Nos. 2,03,900.40
6 TERMINATION CHARGES
Termination of cable excluding cost of out door type
cable terminations and single phase link boxes without
SVL complete and all incidental item of work finished
item of work including providing necessary T&P viz.,
tarpaullin tent, DG set, air conditioner, scaffolding etc
complete wherever necessary for complete item of
work.
U1S 33 a) 132 KV tower mounted type cable end terminations
Each 4,75,767.65
including erection on tower in all respects
U1S 34 b) 132 kV Outdoor type cable end terminations with
Each 4,07,800.83
silicon materials complete in all respect.
U1S 35 c) 132 kV SF6 type cable end terminations complete in all
Each 4,07,800.83
respect.
U1S 36 7a Providing earthing of joint bays with copper flat of
cross section equivalent to the earthing cable and run
all around the joint bay, providing earth electrodes of
steel rods coated with copper as per standards and
treated with suitable earth enhancing compound to get
an effective diameter and welding the copper flat to the
Each 33,983.41
electrodes by exothermic weldng. The earthing scheme
drawing shall be got approved with all eath resistance
calculations considerting the fault currents earth leads
from link box to earth pit and connecing lug fixtures,
fasteners shall be supplied. Length of the earth lead
will be as per site condition/ connivance.
46
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item 2020-21
[Link]. Description of Material/Work UNIT
No. (in Rs)
U1S 37 7b Excavation of earth pit at CTT Tower, putting cast iron
pipe with flange on one end (as per ISS7181/86) of
nominal dia 125 mm and 2.75 metres long inside the
pit including supply and fixing of RCC Collars 0.75
mtr. dia (OD) 50mm thick and 0.60 mtrs. long inside
the pit, backfill the pit in the 25mm size granules of
Each 14,476.93
BH coke for full depth of the pit with alternate layers
of BH Coke and salt of 300mm thick around the earth
pipe of 150mm on all the sides of the pipe including
cost and conveyance of BH Coke,salt,clamps,CI pipes
and RCC collars, labour charges for all operational and
incidental items of work etc., complete.(as per SSR
U1S 38 8a 2013-14) for RCC ([Link]) for any unforeseen
Provision
(rate to be taken
requirement whenever necessary at culverts, drains, Cum
as per CSSR)
nalas, bridges.(rate to be taken as per CSSR)
U1S 39 8b Supplying, fitting and placing of HYSD, TMT bar
reinforcement (TISCO/SAIL/VSP) in foundtions,
colums , beams slabs wherever [Link] the
(rate to be taken
work as per the drawings furnished by the field MT
as per CSSR)
engineer including cutting , bending, cranking, tying
grill in position including cost of binding wire
scaffolding etc.(rate to be taken as per CSSR)
9 CONNECTION OF LINK BOXES
U1S 40 a) Erection of single phase link boxes, providing suitable
supporting arrangements, sheath bonding cable,
connecting earth leads, with all lugs, fixtures, clamps,
bolts and nuts etc., complete including excavation, Each 40,780.08
providing concrete box with walls of 75mm thick RCC
for inserting link boxes, and refilling, etc. including
earthing as per the directions of site engineer.
47
File No.ENE51-PM0SYI(400)/12/2021-EE2
Annexure-XII b
LAYING OF 132KV UG CABLE (DOUBLE CIRCUIT)
SS Rate
Item Sl.
Description of Material/Work UNIT for 2020-
No. No.
21 (in Rs)
1 CABLE ROUTE SURVEY
U1D 1 a) Conducting reconnoitery and preliminary survey along shortest
route with best proposed route and furnishing report for
selecting the best proposal for approval including cost and
conveyance of all materials, hire charges of equipment, tools
and plant, preparation of drawings and reports, labour charges, Mts. 339.84
complete for finished item of work as per the directions of
Engineer-in-charge at site as per SSR 2013-14. (a) With GPS
equipment (As per clause 4.9 of survey) (b) With total station
equipment.
U1D 2 b) Conducting Detailed Survey of cable route including
evaluation of thermal resistivity of the soil along the cable
route, excavation of trial pits as per field requirements,
preparation of cable route profile, drawings for cable laying,
final route alignment, marking lines & grades, and preparing
bill of materials/ lengths of the cable for the project incl. Mts. 1,359.35
preparation of PTCC questionnare and marking of proposed
cable route in topo sheet, tower/SS sketch, Single line diagram
etc.(30 copies/sets). (NOTE: For survey of small lengths of
UG Cable, if the length is less than 0.5KM, then 0.5KM is
considered in preparation of estimate).
2 LAYING OF CABLE
2.1 Laying of 132 kv 630 sq. mm. XLPE U/G copper cable (6 Nos.
for double Circuit) including road cutting, pulling and laying
of cable including excavation in the following soils and back
filling, sand filling dewatering, including cost of RCC
protective tiles, cost of route markers, warning tapes etc.
Across and along CC, BT & earth road, Nala crossings, bridge
crossings, providing HDPE (thickness 10 mm)pipes, Bell
mouths, end caps after laying cable, labour charges and all
incidental items of work for finished item of work. This
includes loading, unloading and transportation of all materials
to work spot. (flat formation)
U1D 3 a) Hard gravel soils, BC soils, red earth, stone and earth mixed
Rmt 16,312.04
with fair size boulders etc
U1D 4 b) Hard Rock with soils Rmt 21,749.38
U1D 5 c) CC or BT road surface etc. Rmt 13,593.36
U1D 6 d) Hard Rock Rmt 16,991.71
U1D 7 e) CC or BT road with Hard rock Rmt 32,624.07
U1D 8 f) Across the road In HDPE pipes (thickness 10mm) to cross CC
or BT road and other service lines including cost of concrete Rmt 20,390.05
cost of HDPE pipes of 250 mm dia etc. complete
U1D 9 g) Across the road In HDPE pipes (thickness 10mm) to cross CC
or BT road with hard rock and other service lines including
Rmt 26,610.35
cost of concrete cost of HDPE pipes of 250 mm dia etc.
complete
U1D 10 h) Cable laying in built up trenches, cable trays and supports etc.
Rmt 20,390.05
complete including cost of trays and support etc, complete.
48
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate
Item Sl.
Description of Material/Work UNIT for 2020-
No. No.
21 (in Rs)
U1D 11 i) Cable laying across the culverts and over bridges etc., complete
Rmt 20,390.05
in PVC pipes of 250 mm dia in complete
U1D 12 j) Cable laying by clamping on special type tower including
earthing cable from termination to Link box including cost of Rmt 21,749.38
Aluminum clamps
U1D 13 k) Cable laying while clamping bare on the walls , ceiling and
structures including cost of clamps in complete shape Rmt 8,156.01
49
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate
Item Sl.
Description of Material/Work UNIT for 2020-
No. No.
21 (in Rs)
U1D 30 b) Supply of RCC joint chambers (1200/760/50 mm) W/L/T with
base and top plates as per the specification of the
contract/tender and erection of RCC joint chambers for every Each 9,515.35
1KM in HDPE duct enroot as per the specification of the
contract/tender.
5 CABLE JOINTING
Jointing of cable excluding cost of pre-moulded straight
through joints, Protection box, 3-phase solid bond link box
without SVL / 3-phase cross bond link box with SVL,
including excavation of pit for double circuit cable, providing
cement concrete base and walls etc. including cost of cement,
steel etc., labour charges and all incidental items of work for
finished item of work including design of pit providing joint
bay identification mark including providing necessary T&P for
jointing viz., tarpaullin tent, DG Set, Air Conditioner etc.,
complete wherever necessary for complete item of work. This
includes loading, un-loading and transportation of all materials
to work spot as per drawing and preparation of joint bay.
U1D 31 a) With excavation of joint bay size (9mX4m) and laying of
Nos. 6,11,701.27
CC([Link]) bed and sand bed and back filling
U1D 32 b) Jointing charges for cross bonding joints/normal joints Nos. 2,03,900.40
6 TERMINATION CHARGES
Termination of cable excluding cost of out door type cable
terminations and single phase link boxes without SVL
complete and all incidental item of work finished item of work
including providing necessary T&P viz., tarpaullin tent, DG
set, air conditioner, scaffolding etc complete wherever
necessary for complete item of work.
U1D 33 a) 132 KV tower mounted type cable end terminations including
Each 4,75,767.65
erection on tower in all respects
U1D 34 b) 132 kV Outdoor type cable end terminations with silicon
Each 4,07,800.83
materials complete in all respect.
U1D 35 c) 132 kV SF6 type cable end terminations complete in all
Each 4,07,800.83
respect.
U1D 36 7a Providing earthing of joint bays with copper flat of cross
section equivalent to the earthing cable and run all around the
joint bay, providing earth electrodes of steel rods coated with
copper as per standards and treated with suitable earth
enhancing compound to get an effective diameter and welding
the copper flat to the electrodes by exothermic weldng. The Each 54,373.44
earthing scheme drawing shall be got approved with all eath
resistance calculations considerting the fault currents earth
leads from link box to earth pit and connecing lug fixtures,
fasteners shall be supplied. Length of the earth lead will be as
per site condition/ connivance.
50
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate
Item Sl.
Description of Material/Work UNIT for 2020-
No. No.
21 (in Rs)
U1D 37 7b Excavation of earth pit at CTT Tower, putting cast iron pipe
with flange on one end (as per ISS7181/86) of nominal dia 125
mm and 2.75 metres long inside the pit including supply and
fixing of RCC Collars 0.75 mtr. dia (OD) 50mm thick and 0.60
mtrs. long inside the pit, backfill the pit in the 25mm size
granules of BH coke for full depth of the pit with alternate Each 14,476.93
layers of BH Coke and salt of 300mm thick around the earth
pipe of 150mm on all the sides of the pipe including cost and
conveyance of BH Coke,salt,clamps,CI pipes and RCC collars,
labour charges for all operational and incidental items of work
etc., complete.(as per SSR 2013-14)
U1D 38 8a Provision for RCC ([Link]) for any unforeseen requirement (rate to be
whenever necessary at culverts, drains, nalas, bridges.(rate to Cum taken as per
be taken as per CSSR) CSSR)
U1D 39 8b Supplying, fitting and placing of HYSD, TMT bar
reinforcement (TISCO/SAIL/VSP) in foundtions, colums ,
(rate to be
beams slabs wherever [Link] the work as per the
MT taken as per
drawings furnished by the field engineer including cutting ,
CSSR)
bending, cranking, tying grill in position including cost of
binding wire scaffolding etc.(rate to be taken as per CSSR)
9 CONNECTION OF LINK BOXES
U1D 40 a) Erection of single phase link boxes, providing suitable
supporting arrangements, sheath bonding cable, connecting
earth leads, with all lugs, fixtures, clamps, bolts and nuts etc.,
complete including excavation, providing concrete box with Each 40,780.08
walls of 75mm thick RCC for inserting link boxes, and
refilling, etc. including earthing as per the directions of site
engineer.
U1D 41 b) Erection of 3 phase link boxes making connections with earth
leads with lugs, fixtures, fasteners sheath bonding cable etc.,
including excavation, providing RCC concrete wall box of Each 54,373.44
75mm thick for inserting link boxes , and refilling, etc.
including earthing as per the directions of site engineer.
U1D 42 10 Erection of Lightning Arrestors on special type tower including
cost of hardware, jumpering with suitable conductor between
line conductor and the pole mounted terminations including Each 6,796.69
labour charges and insurance for all incidental and operational
items of work.
U1D 43 11 Road cutting charges and charges for way leaves to be paid
Mts. 13,593.36
for various Government and other agencies
U1D 44 12 Site testing and commissioning (including phase sequence test,
KM 4,07,800.83
megger test, continuity test, HV test etc.)
51
File No.ENE51-PM0SYI(400)/12/2021-EE2
Annexure-XII c
LAYING OF 220 KV UG CABLE (SINGLE CIRCUIT)
SS Rate for
Item Sl.
Description of Material/Work UNIT 2020-21
No. No.
(in Rs)
1 CABLE ROUTE SURVEY
U2S 1 a) Conducting reconnoitery and preliminary survey along shortest Mts. 339.84
route with best proposed route and furnishing report for selecting
the best proposal for approval including cost and conveyance of
all materials, hire charges of equipment, tools and plant,
preparation of drawings and reports, labour charges, complete for
finished item of work as per the directions of Engineer-in-charge
at site as per SSR 2013-14. (a) With GPS equipment (As per
clause 4.9 of survey) (b) With total station equipment.
U2S 2 b) Conducting Detailed Survey of cable route including evaluation of Mts. 1019.50
thermal resistivity of the soil along the cable route, excavation of
trial pits as per field requirements, preparation of cable route
profile, drawings for cable laying, final route alignment, marking
lines & grades, and preparing bill of materials/ lengths of the cable
for the project incl. preparation of PTCC questionnare and
marking of proposed cable route in topo sheet, tower/SS sketch,
Single line diagram etc.(30 copies/sets) .(NOTE: For survey of
small lengths of UG Cable, if the length of UG cable is less than
0.5KM, then 0.5KM is considered for survey of small length of
UG cable in the preparation of estimate)
2 LAYING OF CABLE
2.1 Laying of 220 kv 1000 sq. mm. XLPE U/G copper cable (3 Nos.
for Single Circuit) including road cutting, pulling and laying of
cable including excavation in the following soils and back filling,
sand filling dewatering, including cost of RCC protective tiles,
cost of route markers, warning tapes etc. Across and along CC, BT
& earth road, Nala crossings, bridge crossings, providing HDPE
(thickness 10 mm)pipes, Bell mouths, end caps after laying cable,
labour charges and all incidental items of work for finished item
of work. This includes loading, unloading and transportation of all
materials to work spot. (flat formation)
U2S 3 a) Hard gravel soils, BC soils, red earth, stone and earth mixed with Rmt 10823.03
fair size boulders etc
U2S 4 b) Hard Rock with soils Rmt 14868.42
U2S 5 c) CC or BT road surface etc. Rmt 9646.12
U2S 6 d) Hard Rock Rmt 11124.00
U2S 7 e) CC or BT road with Hard rock Rmt 20664.08
U2S 8 f) Across the road In HDPE pipes (thickness 10mm) to cross CC or Rmt 13563.47
BT road and other service lines including cost of concrete cost of
HDPE pipes of 250 mm dia etc. complete
U2S 9 g) Cable laying in built up trenches, cable trays and supports etc. Rmt 13563.47
complete including cost of trays and support etc, complete.
U2S 10 h) Cable laying across the culverts and over bridges etc., complete in Rmt 13563.47
PVC pipes of 250 mm dia in complete
52
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item Sl.
Description of Material/Work UNIT 2020-21
No. No.
(in Rs)
U2S 11 i) Cable laying by clamping on special type tower including earthing Rmt 12234.02
cable from termination to Link box including cost of aluminum
clamps
U2S 12 j) Cable laying by clamping on Sub-station structures like CPL etc., Rmt 2718.67
including earthing cable from termination to Link box including
cost of aluminum clamps.
U2S 13 k) Cable laying while clamping bare on the walls , ceiling and Rmt 5437.35
structures including cost of clamps in complete shape
U2S 14 l) Cable laying across the railway tracks Rmt 33983.41
2.2 Including excavation and excluding backfilling without cable
laying
U2S 15 a) Hard rock with CC or BT Road surfaces etc. Rmt 11554.35
U2S 16 b) Hard Gravel soils, BC Soils, Red Earth, stone & Earth mixed with Rmt 4078.00
fair size boulders etc.,
2.3 Excluding excavation and including backfilling
U2S 17 a) Hard Gravel soils, BC Soils, Red Earth, stone & Earth mixed with Rmt 1699.17
fair size boulders etc.,
U2S 18 b) Hard rock with CC or BT Road surfaces etc. Rmt 6796.69
U2S 19 2.4 Only excavation and back filling of soil without laying of cable Rmt 2039.01
U2S 20 2.5 Excavation and backfilling of suitable thermal backfill for Cum 5437.35
maintainings soil thermal resistance value of 120 degrees
U2S 21 2.6 Laying of cable excluding excavation and backfilling Rmt 679.66
2.7 Laying of cable by Horizontal Directional Drilling (HDD) incl.
cost of 250 mm HDPE Pipe
U2S 22 a) Soil/Morrem,soft rock (upto 5000 PSI) per pipe Rmt 13321.48
U2S 23 b) Soil/Hard rock (5000 PSI upto 9000 PSI) per pipe Rmt 21749.38
3 LAYING OF CO-AXIAL CABLE
U2S 24 a) [Link]. co-axial copper cable conductor PVC insulated 6.6KV Rmt 20.39
grade across the cable.
U2S 25 b) [Link] core copper cable conductor PVC insulated Rmt 20.39
6.6KV grade across the cable.
U2S 26 c) [Link]. co-axial copper cable conductor PVC insulated 6.6KV Rmt 20.39
grade on pole mounted termination tower including cost of cleats
U2S 27 d) [Link] core copper cable conductor PVC insulated Rmt 20.39
6.6KV grade on pole mounted termination tower including cost of
cleats.
4 For pulling optical fiber cable the following items shall be done
while excavation of trenches as per specifications
U2S 28 a) Supply of HDPE duct pipe of OD/ID 40/33 mm dia and associated RM 135.92
material of standard make as per the specification of the
contract/tender and laying jointing, bedding of above HDPE duct
pipe in the already excavated XLPE cable trench including sealing
the section ends as per the specification of the contract/tender
(Per Pipe).
U2S 29 b) Supply of RCC joint chambers (1200/760/50 mm) W/L/T with Each 9515.35
base and top plates as per the specification of the contract/tender
and erection of RCC joint chambers for every 1KM in HDPE duct
enroot as per the specification of the contract/tender.
53
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item Sl.
Description of Material/Work UNIT 2020-21
No. No.
(in Rs)
5 CABLE JOINTING
Jointing of cable excluding cost of pre-moulded straight through
joints, Protection box, 3-phase solid bond link box without SVL /
3-phase cross bond link box with SVL, including excavation of pit
for single circuit cable, providing cement concrete base and walls
etc. including cost of cement, steel etc., labour charges and all
incidental items of work for finished item of work including
design of pit providing joint bay identification mark including
providing necessary T&P for jointing viz., tarpaullin tent, DG Set,
Air Conditioner etc., complete wherever necessary for complete
item of work. This includes loading, un-loading and transportation
of all materials to work spot as per drawing and preparation of
joint bay.
U2S 30 a) With excavation of joint bay size (13mX4m) and laying of Each 475767.65
CC([Link]) bed and sand bed and back filling
U2S 31 b) Jointing charges for cross bonding joints for each phase Each 339834.02
6 TERMINATION CHARGES
Termination of cable excluding cost of out door type cable
terminations and single phase link boxes without SVL complete
and all incidental item of work finished item of work including
providing necessary T&P viz., tarpaullin tent, DG set, air
conditioner, scaffolding etc complete wherever necessary for
complete item of work.
U2S 32 a) 220 KV tower mounted type cable end terminations including Each 570921.16
erection on tower in all respects per phase including scaffolding
charges.
U2S 33 b) 220 kV Outdoor type cable end terminations with silicon materials Each 475767.65
complete in all respect.
U2S 34 c) 220 kV SF6 type cable end terminations complete in all respect. Each 475767.65
U2S 35 7a Providing earthing of joint bays with copper flat of cross section Each 33983.41
equivalent to the earthing cable and run all around the joint bay,
providing earth electrodes of steel rods coated with copper as per
standards and treated with suitable earth enhancing compound to
get an effective diameter and welding the copper flat to the
electrodes by exothermic weldng. The earthing scheme drawing
shall be got approved with all eath resistance calculations
considerting the fault currents earth leads from link box to earth
pit and connecing lug fixtures, fasteners shall be supplied. Length
of the earth lead will be as per site condition/ connivance.
54
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item Sl.
Description of Material/Work UNIT 2020-21
No. No.
(in Rs)
U2S 36 7b Excavation of earth pit at CTT Tower, putting cast iron pipe with Each 14476.93
flange on one end (as per ISS7181/86) of nominal dia 125 mm and
2.75 metres long inside the pit including supply and fixing of RCC
Collars 0.75 mtr. dia (OD) 50mm thick and 0.60 mtrs. long inside
the pit, backfill the pit in the 25mm size granules of BH coke for
full depth of the pit with alternate layers of BH Coke and salt of
300mm thick around the earth pipe of 150mm on all the sides of
the pipe including cost and conveyance of BH
Coke,salt,clamps,CI pipes and RCC collars, labour charges for all
operational and incidental items of work etc., complete.(as per
SSR 2013-14)
U2S 37 8a Provision for RCC ([Link]) for any unforeseen requirement Cum (rate to be
whenever necessary at culverts, drains, nalas, bridges.(rate to be taken as per
taken as per CSSR) CSSR)
U2S 38 8b Supplying, fitting and placing of HYSD, TMT bar reinforcement MT (rate to be
(TISCO/SAIL/VSP) in foundtions, colums , beams slabs wherever taken as per
[Link] the work as per the drawings furnished by the field CSSR)
engineer including cutting , bending, cranking, tying grill in
position including cost of binding wire scaffolding etc.(rate to be
taken as per CSSR)
9 CONNECTION OF LINK BOXES
U2S 39 a) Erection of single phase link boxes, providing suitable supporting Each 40780.08
arrangements, sheath bonding cable, connecting earth leads, with
all lugs, fixtures, clamps, bolts and nuts etc., complete including
excavation, providing concrete box with walls of 75mm thick
RCC for inserting link boxes, and refilling, etc. including earthing
as per the directions of site engineer including connecting to the
earthing cable from link box to earthpit
U2S 40 b) Erection of 3 phase link boxes making connections with earth Each 54373.44
leads with lugs, fixtures, fasteners sheath bonding cable etc.,
including excavation, providing RCC concrete wall box of 75mm
thick for inserting link boxes , and refilling, etc. including earthing
as per the directions of site engineer including connecting to the
earthing cable from link box to earthpit.
U2S 41 10 Erection of Lightning Arrestors on special type tower including Each 6796.69
cost of hardware, jumpering with suitable conductor between line
conductor and the pole mounted terminations including labour
charges and insurance for all incidental and operational items of
work.
U2S 42 11 Road cutting charges and charges for way leaves to be paid for Mts. 8156.01
various Government and other agencies. The cost is for estimate
purpose however, the amount will be reimbursed as per actuals
against documentary evidence.
U2S 43 12 Site testing and commissioning (including phase sequence test, KM 271867.23
megger test, continuity test, HV test etc.)
55
File No.ENE51-PM0SYI(400)/12/2021-EE2
Annexure-XII d
LAYING OF 220 KV UG CABLE (DOUBLE CIRCUIT)
SS Rate for
Item
[Link]. Description of Material/Work Unit 2020-21
No.
(in Rs)
1 CABLE ROUTE SURVEY
U2D 1 Conducting reconnoitery and preliminary survey along shortest
route with best proposed route and furnishing report for
selecting the best proposal for approval including cost and
conveyance of all materials, hire charges of equipment, tools
a) and plant, preparation of drawings and reports, labour charges, Mts. 339.84
complete for finished item of work as per the directions of
Engineer-in-charge at site as per SSR 2013-14. (a) With GPS
equipment (As per clause 4.9 of survey) (b) With total station
equipment.
U2D 2 Conducting Detailed Survey of cable route including
evaluation of thermal resistivity of the soil along the cable
route, excavation of trial pits as per field requirements,
preparation of cable route profile, drawings for cable laying,
final route alignment, marking lines & grades, and preparing
bill of materials/ lengths of the cable for the project incl.
b) Mts. 1,359.35
preparation of PTCC questionnare and marking of proposed
cable route in topo sheet, tower/SS sketch, Single line diagram
etc.(30 copies/sets) .(NOTE: For survey of small lengths of
UG Cable, if the length of UG cable is less than 0.5KM, then
0.5KM is considered for survey of small length of UG cable in
the preparation of estimate).
2 LAYING OF CABLE
Laying of 220 kv 1000 sq. mm. XLPE U/G copper cable (6
Nos. for double Circuit) including road cutting, pulling and
laying of cable including excavation in the following soils and
back filling, sand filling dewatering, including cost of RCC
protective tiles, cost of route markers, warning tapes etc.
2.1 Across and along CC, BT & earth road, Nala crossings, bridge
crossings, providing HDPE (thickness 10 mm)pipes, Bell
mouths, end caps after laying cable, labour charges and all
incidental items of work for finished item of work. This
includes loading, unloading and transportation of all materials
to work spot. (flat formation).
U2D 3 Hard gravel soils, BC soils, red earth, stone and earth mixed
a) Rmt 18,038.40
with fair size boulders etc
b) Hard Rock with soils Rmt 24,780.68
U2D 5 c) CC or BT road surface etc. Rmt 16,076.92
U2D 6 d) Hard Rock Rmt 18,539.98
U2D 7 e) CC or BT road with Hard rock Rmt 34,440.14
U2D 8 Across the road In HDPE pipes (thickness 10mm) to cross CC
f) or BT road and other service lines including cost of concrete Rmt 22,605.74
cost of HDPE pipes of 250 mm dia etc. Complete.
U2D 9 Cable laying in built up trenches, cable trays and supports etc.
g) Rmt 22,605.74
complete including cost of trays and support etc, complete.
U2D 10 Cable laying across the culverts and over bridges etc.,
h) complete in PVC pipes of 250 mm dia in complete Rmt 22,605.74
56
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item
[Link]. Description of Material/Work Unit 2020-21
No.
(in Rs)
U2D 11 Cable laying by clamping on special type tower including
i) earthing cable from termination to Link box including cost of Rmt 24,468.04
aluminum clamps
U2D 12 Cable laying by clamping on Sub-station structures like CPL
j) etc., including earthing cable from termination to Link box Rmt 5,437.35
including cost of aluminum clamps.
U2D 13 Cable laying while clamping bare on the walls , ceiling and
k) Rmt 10,874.69
structures including cost of clamps in complete shape.
U2D 14 l) Cable laying across the railway tracks. Rmt 54,373.44
Including excavation and excluding backfilling without
2.2
cable laying
U2D 15 a) Hard rock with CC or BT Road surfaces etc. Rmt 23,108.71
U2D 16 Hard Gravel soils, BC Soils, Red Earth, stone & Earth mixed
b) Rmt 8,156.01
with fair size boulders etc.,
2.3 Excluding excavation and including backfilling
U2D 17 Hard Gravel soils, BC Soils, Red Earth, stone & Earth mixed
a) Rmt 3,398.35
with fair size boulders etc.,
U2D 18 b) Hard rock with CC or BT Road surfaces etc. Rmt 9,515.35
U2D 19 Only excavation and back filling of soil without laying of
2.4 Rmt 4,078.00
cable.
U2D 20 Excavation and backfilling of suitable thermal backfill for
2.5 maintainings soil thermal resistance value of 120 degrees. Cum 10,874.69
U2D 21 2.6 Laying of cable excluding excavation and backfilling. Rmt 1,359.35
Laying of cable by Horizontal Directional Drilling (HDD)
2.7
incl. cost of 250 mm HDPE Pipe
U2D 22 a) Soil/Morrem,soft rock (upto 5000 PSI) per pipe Rmt 13,321.48
U2D 23 b) Soil/Hard rock (5000 PSI upto 9000 PSI) per pipe Rmt 21,749.38
3 LAYING OF CO-AXIAL CABLE
U2D 24 [Link]. co-axial copper cable conductor PVC insulated
a) Rmt 34.00
6.6KV grade across the cable.
U2D 25 [Link] core copper cable conductor PVC insulated
b) Rmt 34.00
6.6KV grade across the cable.
U2D 26 [Link]. co-axial copper cable conductor PVC insulated
c) 6.6KV grade on pole mounted termination tower including Rmt 34.00
cost of cleats.
U2D 27 [Link] core copper cable conductor PVC insulated
d) 6.6KV grade on pole mounted termination tower including Rmt 34.00
cost of cleats.
For pulling optical fiber cable the following items shall be
4
done while excavation of trenches as per specifications.
U2D 28 Supply of HDPE duct pipe of OD/ID 40/33 mm dia and
associated material of standard make as per the specification
of the contract/tender and laying jointing, bedding of above
a) HDPE duct pipe in the already excavated XLPE cable trench
RM 135.92
57
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item
[Link]. Description of Material/Work Unit 2020-21
No.
(in Rs)
U2D 29 Supply of RCC joint chambers (1200/760/50 mm) W/L/T with
base and top plates as per the specification of the
b) contract/tender and erection of RCC joint chambers for every Each 9,515.35
1KM in HDPE duct enroot as per the specification of the
contract/tender.
5 CABLE JOINTING
Jointing of cable excluding cost of pre-moulded straight
through joints, Protection box, 3-phase solid bond link box
without SVL / 3-phase cross bond link box with SVL,
including excavation of pit for double circuit cable, providing
cement concrete base and walls etc. including cost of cement,
steel etc., labour charges and all incidental items of work for
finished item of work including design of pit providing joint
bay identification mark including providing necessary T&P
for jointing viz., tarpaullin tent, DG Set, Air Conditioner etc.,
complete wherever necessary for complete item of work. This
includes loading, un-loading and transportation of all materials
to work spot as per drawing and preparation of joint bay.
U2D 30 With excavation of joint bay size (13mX4m) and laying of
a) Nos. 6,93,261.43
CC([Link]) bed and sand bed and back filling
U2D 31 b) Jointing charges for cross bonding joints for each phase. Nos. 3,39,834.02
6 TERMINATION CHARGES
Termination of cable excluding cost of out door type cable
terminations and single phase link boxes without SVL
complete and all incidental item of work finished item of work
including providing necessary T&P viz., tarpaullin tent, DG
set, air conditioner, scaffolding etc complete wherever
necessary for complete item of work.
U2D 32 220 KV tower mounted type cable end terminations including
a) erection on tower in all respects per phase including Each 5,70,921.16
scaffolding charges.
U2D 33 220 kV Outdoor type cable end terminations with silicon
b) Each 4,75,767.65
materials complete in all respect.
U2D 34 220 kV SF6 type cable end terminations complete in all
c) Each 4,75,767.65
respect.
U2D 35 Providing earthing of joint bays with copper flat of cross
section equivalent to the earthing cable and run all around the
joint bay, providing earth electrodes of steel rods coated with
copper as per standards and treated with suitable earth
enhancing compound to get an effective diameter and welding
7a the copper flat to the electrodes by exothermic weldng. The Nos. 54,373.44
earthing scheme drawing shall be got approved with all eath
resistance calculations considerting the fault currents earth
leads from link box to earth pit and connecing lug fixtures,
fasteners shall be supplied. Length of the earth lead will be as
per site condition/ connivance.
58
File No.ENE51-PM0SYI(400)/12/2021-EE2
SS Rate for
Item
[Link]. Description of Material/Work Unit 2020-21
No.
(in Rs)
U2D 36 Excavation of earth pit at CTT Tower, putting cast iron pipe
with flange on one end (as per ISS7181/86) of nominal dia 125
mm and 2.75 metres long inside the pit including supply and
fixing of RCC Collars 0.75 mtr. dia (OD) 50mm thick and 0.60
mtrs. long inside the pit, backfill the pit in the 25mm size
7b granules of BH coke for full depth of the pit with alternate Nos. 14,476.93
layers of BH Coke and salt of 300mm thick around the earth
pipe of 150mm on all the sides of the pipe including cost and
conveyance of BH Coke,salt,clamps,CI pipes and RCC collars,
labour charges for all operational and incidental items of work
etc., complete.(as per SSR 2013-14)
U2D 37 Provision for RCC ([Link]) for any unforeseen requirement (rate to be
8a whenever necessary at culverts, drains, nalas, bridges.(rate to Cum taken as per
be taken as per CSSR) CSSR)
U2D 38 Supplying, fitting and placing of HYSD, TMT bar
reinforcement (TISCO/SAIL/VSP) in foundtions, colums ,
(rate to be
beams slabs wherever [Link] the work as per the
8b MT taken as per
drawings furnished by the field engineer including cutting ,
CSSR)
bending, cranking, tying grill in position including cost of
binding wire scaffolding etc.(rate to be taken as per CSSR)
9 CONNECTION OF LINK BOXES
U2D 39 Erection of single phase link boxes, providing suitable
supporting arrangements, sheath bonding cable, connecting
earth leads, with all lugs, fixtures, clamps, bolts and nuts etc.,
complete including excavation, providing concrete box with
a) Each 40,780.08
walls of 75mm thick RCC for inserting link boxes, and
refilling, etc. including earthing as per the directions of site
engineer including connecting to the earthing cable from link
box to earthpit.
U2D 40 Erection of 3 phase link boxes making connections with earth
leads with lugs, fixtures, fasteners sheath bonding cable etc.,
including excavation, providing RCC concrete wall box of
b) 75mm thick for inserting link boxes , and refilling, etc. Each 54,373.44
including earthing as per the directions of site engineer
including connecting to the earthing cable from link box to
earthpit.
U2D 41 Erection of Lightning Arrestors on special type tower
including cost of hardware, jumpering with suitable conductor
10 between line conductor and the pole mounted terminations Nos. 6,796.69
including labour charges and insurance for all incidental and
operational items of work.
U2D 42 Road cutting charges and charges for way leaves to be paid
for various Government and other agencies. The cost is for
11 Mts. 13,593.36
estimate purpose however, the amount will be reimbursed as
per actuals against documentary evidence.
U2D 43 Site testing and commissioning (including phase sequence test,
12 KM 4,07,800.83
megger test, continuity test, HV test etc.)
59
File No.ENE51-PM0SYI(400)/12/2021-EE2
ANNEXURE-XIII
TRANSMISSION LINE WORKS
[Link]. Description of work % Over the basic labour rates
1 River Crossing with JC type towers 100% extra
2 2nd Circuit Stringing with 1st Circuit lives75% extra
Works under shutdown:
This is applicable under the following
conditions only.
3 I. Pre-Programmed for interruption of 50% extra
line.
ii. Pre-arranged replacement/rectification
of line materials
4 Dismatling works 75% of Normal Rate
Emergency Works such as break down
works.
5 100% extra
This will bot be applicable for pre-
arranged shutdown works
6 Stringing of railway crossings 100% extra
7 National and State High way crossings 25% extra
Tree cutting & Jungle Clearance In Tr.
8 Line works as the works are in scattered 100% extra
areas
9 DC work under shutdown 100%extra
60
File No.ENE51-PM0SYI(400)/12/2021-EE2
VOLUME-II
EQUIPMENT/MATERIAL RATES
61
File No.ENE51-PM0SYI(400)/12/2021-EE2
C
a Ex-Works Price
without GST
[Link]. SAP Code t Description of Equipment/ Material Unit
e and F&I (in Rs)
g SSR-2020-21
o
1 10001372 220kV Circuit Breakers, SF6, 3pole, 3150A, 50KA Nos 13,00,000
2 10001377 132kV Circuit Breakers, SF6, 3pole, 3150A, 40KA Nos 5,50,000
3 10001380 132kV Circuit Breakers, SF6, 2Pole, 3150A, 40KA Nos 3,89,284
4 10001358 33 kV, 2500A, 25KA, Vaccum outdoor circuit breaker Nos 2,06,000
220kV CT (800-500-300/1-0.66,1-0.375,0.5,0.625,0.83,1-
6 10001221 Nos 2,45,000
0.375,1-1A)
10001104
14 33 kV CTs 1200 A Nos 45,564
10001103
62
File No.ENE51-PM0SYI(400)/12/2021-EE2
C
a Ex-Works Price
without GST
[Link]. SAP Code t Description of Equipment/ Material Unit
e and F&I (in Rs)
g SSR-2020-21
o
23 10003102 220kV LAs Nos 45,000
35 10007518 220kV Solid core insulators (with creepage 25 mm/KV) Nos 17,800
36 10007517 220kV Solid core insulators (with creepage 31 mm/KV) Nos 22,500
37 10007528 132kV Solid core insulators (with creepage 31mm/KV) Nos 8,000
38 10007528 132kV Solid core insulators (with creepage 25mm/KV) Nos 8,000
39 10007535 33kV Solid core insulators (with creepage 25mm/KV) Nos 1,900
63
File No.ENE51-PM0SYI(400)/12/2021-EE2
C
a Ex-Works Price
without GST
[Link]. SAP Code t Description of Equipment/ Material Unit
e and F&I (in Rs)
g SSR-2020-21
o
46 10004150 LTAC panel Nos 1,65,000
64
File No.ENE51-PM0SYI(400)/12/2021-EE2
C
a Ex-Works Price
without GST
[Link]. SAP Code t Description of Equipment/ Material Unit
e and F&I (in Rs)
g SSR-2020-21
o
H
69 10007103 aSingle Suspension H/W (AGS -AAH) for Panther ACSR Nos 1,840
rH
70 10007032 aDouble Tension H/W for Panther ACSR Nos 3,152
rH
71 10007052 aSingle Tension H/W for Panther ACSR Nos 1,591
rH
72 10007205 aMid Span Compression joints for Panther Nos 392
rH
73 10007278 aVibration dampers for Panther ACSR Nos 428
rH
74 10007223 aRepair sleeves for Panther conductor Nos 206
rH
75 10007089 aSingle Suspension H/W (AAH type) for Moose Conductor Nos 3,570
r
H
76 10007028 aDouble Tension H/W suitable for Moose Nos 4,881
rH
77 10007037 aSingle Tension H/W suitable for Moose Nos 2,765
rH
78 10007074 aDouble suspension h/w (AGS type) for moose conductor Nos 4,540
rH
79 10007090 aSingle Suspension H/W (FAH) for Moose Nos 3,064
rH
80 10007085 aSingle Suspension H/W suitable for Moose (Pilot) Nos 1,108
r
H
81 10007083 a220kV Single suspension hardware for Twin moose Nos 3,500
rH
82 10007073 a220kV Double suspension hardware for twin moose Nos 4,500
rH
83 10008562 aSpacer clamps with 400mm spacing for twin moose Nos 446
rT clamps for twin moose to single moose with 400mm
H
84 10008788 a Nos 707
spacing
rH Suspension clamps suitable for twin Moose conductor for
85 10007235 a Nos 555
220kV and 132kV
rH
86 10007200 aMid Span Compression joints for Moose Nos 843
rH
87 10007218 aRepair sleeves for Moose conductor Nos 346
rH
88 10007276 aVibration dampers for Moose conductor Nos 829
r
H
89 10007301 aArmour Rods for Moose ACSR conductor Nos 1,621
rH
90 10007292 aArcing Horns for Single suspension Moose Nos 294
rH
91 10007306 aArcing Horns for Single V-Suspension Moose Nos 218
r
65
File No.ENE51-PM0SYI(400)/12/2021-EE2
C
a Ex-Works Price
without GST
[Link]. SAP Code t Description of Equipment/ Material Unit
e and F&I (in Rs)
g SSR-2020-21
o
H
92 10007069 aTension hardware with earth bond Nos 625
rH
93 10007321 aSuspension hardware with earth bond Nos 803
rH
94 10007209 aMidspan compression Joints for earth wire Nos 91
rT
95 67500060 oNumber plates with Bolts &Nuts and Washers Nos 151
w
T
96 67500058 oPhase Plates with Bolts &Nuts and Washers Set 192
w
T
97 67500055 oCircuit plate with Bolts &Nuts and Washers Nos 240
w
T
98 67500061 oDanger Boards with Bolts &Nuts and Washers Nos 168
w
T
99 67500042 oBird guards Nos 200
w
T
100 67500028 oAnti-Climbing devices Set 2,601
w
T
101 10007787 oU Bolts 16mm Nos 140
w
T
102 10007790 oU Bolts 20mm Nos 187
w
H
103 67500046 aHangers 132 KV 541
n
H
104 67500076 aHangers 220 KV 612
n
H
105 10008844 aArmour Rods for Panther ACSR conductor Nos 680
10007289 n
H
106 Arcing Horns for Panther ACSR conductor Nos 550
10007290 a
n5 bolted type single tension h/w for single moose or zebra
H
107 10007039 a Nos 1,900
conductor for 220kV & 132kV
rH 5 bolted twin zebra / moose tension h/w 400mm spacing
108 10007029 a Sets 3,900
for 132/220kV bus
rH 3 bolted type single tension h/w for single moose or zebra
109 10007038 a Nos 1,253
conductor for 33KV
rH 3 bolted tension hardware for twin moose with 150mm
110 10007036 a Nos 3,300
spacing to 33KV bus
rC
111 10008276 lT Clamps for single Moose all three ways Nos 600
aCT clamps for twin Moose T off single Moose with 150mm
112 10008918 l Nos 542
spacing
aC
113 10008576 lSpacer clamps with 150mm spacing for twin moose Nos 300
aCPost type insulators clamps for twin conductor for 220kV
114 10008933 l Nos 704
& 132kV
a
66
File No.ENE51-PM0SYI(400)/12/2021-EE2
C
a Ex-Works Price
without GST
[Link]. SAP Code t Description of Equipment/ Material Unit
e and F&I (in Rs)
g SSR-2020-21
o
CPost type insulators clamps for single conductor for 220kV
115 10008932 l Nos 550
& 132kV
aC
116 10007526 lPost type insulators clamps for twin conductor for 33KV Nos 700
aC
117 10008740 lPost type insulators clamps for single conductor for 33KV Nos 510
aC
118 10008105 lPad type compressor clamp for GS Earth wire to 75/12 flat Nos 80
aC
119 10008106 lCleat type clamp for G.S. Earth wire Nos 78
a
120 10008104 CT clamp for GS Earth wire Nos 300
l
C
121 10008865 Bolted earth wire tension clamp Nos 590
l
a
122 10002935 Supply and fixing GI flexible earth bonds Nos 300
123 10006608 Supply and erection of LED lamps (120W) with fixture Nos 5,709
10009209
125 10009210 CT Marshalling boxes(220/132/33KV) Nos 3,985
10009211
126 10009214 PT Marshalling boxes(220/132/33KV) Nos 5,310
136 70002757 MDF Board with 12mm thick 3x4 size with teak wood Nos 5,728
67
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
A) ISOLATORS
420 KV 3 pole outdoor type horizontal centre break
Isolators 3 phases 50 c/s of 3150 Amps and fault level of
I 50 KA per second A.C. Motor operated with all
accessories, auxiliaries marshalling boxes, Terminal
Connectors other essentials as specified.
a) With single earth switch 7,22,706
10002550 (i) Metallics Sets 4,82,262
10007507 (ii) Insulators (1 set = 6 Nos. Insulators) Sets 2,40,444
b) With double earth switch 8,67,257
10002551 (i) Metallics Sets 6,26,813
10007507 (ii) Insulators (1 set = 6 Nos Insulators) Sets 2,40,444
245 KV 3 pole outdoor type horizontal double break
Isolators 3 phases 50 c/s of 1600 Amps and fault level of
40 KA per second A.C. Motor operated with all
II
accessories, auxiliaries marshalling boxes, Terminal
connectors other essentials as specified.( creepage
distance of 31mm/kV)
a) With Double earth switch 4,18,000
10002586 (i) Metallics Sets 2,56,406
10007517 (ii) Insulators (1 set = 9 Nos. Insulators) Sets 1,61,594
b) With single earth switch 3,56,559
(i) Metallics Sets 1,99,459
(ii) Insulators (1 set = 9 Nos. Insulators) Sets 1,57,100
c) Without earth switch 2,98,076
(i) Metallics Sets 1,40,976
(ii) Insulators (1 set = 9 Nos. Insulators) Sets 1,57,100
245 KV 3 pole outdoor type horizontal double break
Isolators 3 phases 50 c/s of 2500 Amps and fault level of
40 KA per second ,A.C. Motor operated with all
III
accessories, auxiliaries marshalling boxes, Terminal
connectors other essentials as specified. (creepage
distance of 31mm/kV)
a) with Single earth switch 3,93,249
10002580 (i) Metallics Sets 2,36,149
10007517 (ii) Insulators (1 set = 9 Nos. Insulators) Sets 1,57,100
B) CIRCUIT BREAKERS
420 KV 3 pole SF6 Gas filled out door circuit breakers
without closing resistors of 3 phases 50 c/s of 3150Amps
and fault level of 50 KA for one second either spring
charged motor operated or pneumatically operated with all
1 10001370 accessories, auxiliaries including terminal connectors and Sets 24,50,000
marshalling boxes and first fill of SF6 Gas with additional
10% gas and others as specified including Support
structures complete as specified for the 420 kV Circuit
Breakers.
68
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
C) Lightening Arrestors
Design, Engineering, manufacture, assembly, shop testing,
supply and delivery at site including packing, forwarding,
handling at port of disembarkation, transportation to
1 project site, unloading of the following surge arrestors
complete with surge counters, insulating bays and all
associated accessories and auxiliaries in accordance with
specification including terminal connectors.
ix) Cost of all Busbars, Cabling, Wiring meters etc. & all
other required accessories etc. as per specification - 1 set
69
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
v) ' F1' Type Module with a rating of 150 A - 2 Nos.
vi) ' F1' Type Module with a rating of 125 A - 4 Nos.
vii) ' F1' Type Module with a rating of 63 A - 67 Nos.
viii) ' F1' Type Module with a rating of 32 A - 12 Nos.
ix) ' F1' Type Module with a rating of 16 A - 4 Nos.
x) ' V2 ' Type Module with a rating of 0 - 500 V - 2
Nos.
xi) Cost of the panel with all other required accessories
etc. as per specification - 1 set
xii) Cost of all Busbars, Cabling, Wiring meters etc. & all
other required accessories etc. as per specification - 1 set
ix) Cost of all Busbars, Cabling, Wiring meters etc. & all
other required accessories etc. as per specification - 1 set
E) INSTRUMENT TRANSFORMERS
70
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
Design, Engineering, manufacture, assembly, shop testing,
supply and delivery at site including packing forwarding
handling transportation to project site, unloading, of
420kV Single Phase CVT in accordance with
3 10001300 No. 3,31,867
specification, including first fill of transformer oil and all
accessories, auxiliaries including marshalling boxes and
terminal connectors for CVTs as specified in 400kv
technical specification.
F) EARTHING AND EARTHMAT
Discharge rod 10 ft long with suitable screw type clamp
1 10006901 suitable for moose conductor & 15 Mtrs long 25 sqmm. Set 11,081
Copper lead with heavy duty crocodile clamp.
Electrical safety hand gloves suitable for the operation in
2 70004306 Set 2,719
400/220kV switchyard of ISI Quality.
2 Mtr x 1 Mtr, 10mm thick Neoprine Rubber mats of ISI
3 70004363 No. 2,786
Quality.
Stainless container of 2 litres capacity for collection of oil
4 10000650 No. 1,478
samples with cock arrangements at both ends.
70000511,
Electrical safety Belts, Shoes and Helmets suitable for the
5 70004303, Set 3,650
operation in 400/220kV switchyard of ISI Quality.
70004303
G) BUS BAR MATERIAL
1 10007505 400 kV Bus Post Insulators. Nos 40,074
2 10008687 220 kV Bus Post Insulators. Nos 22,204
4.5" IPS Aluminum tube of electrical grade including
3 10010128 Mtrs 2,842
welding sleeves.
4" IPS Aluminum tube of electrical grade including
4 10009058 Mtrs 2,332
welding sleeves.
Bay Marshalling Boxes for 400KV, 220 and 132 KV Bays
5 10009246 Nos. 49,278
with 3mm Aluminum sheet.
400 KV Single suspension hardware suitable for Twin
6 10007014 sets 6,500
Moose.
400 KV Double Suspension hardware suitable for Quad
7 10007009 Sets 7,500
Moose.
400 KV Double Tension hardware suitable for Twin
8 10007002 Sets 12,596
Moose.
400 KV Double Tension hardware suitable for Quad
9 10007005 Sets 20,000
Moose.
220 KV / 132kV Single suspension hardware suitable for
10 10007083 3,500
Twin Moose.
220 KV double suspension hardware suitable for Twin
11 10007073 Sets 4,500
Moose.
220 KV Double suspension hardware suitable for Quad
12 10007071 Sets 8,100
Moose.
220 KV / 132kV Double tension hardware suitable for
13 10007021 Sets 6,222
Twin Moose.
220 KV Double tension hardware suitable for Quad
14 10007020 Sets 12,616
Moose
15 10008085 400 KV Conductor Spacers for Quad moose Nos. 1,200
16 10008086 400 KV Conductor Spacers for Twin moose Nos. 450
17 10008096 220 KV Conductor Spacers for Twin moose Nos. 450
18 10008095 220 KV Conductor Spacers for Quad moose Nos. 1,000
71
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
(a) 10008040 BPI Clamp for Twin moose through/expansion type Nos. 1,209
(b) 10008698 BPI Clamps for 4.5" IPS Rigid /sliding /expansion type Nos. 2,363
(c) 10008041 BPI Clamps for 4" IPS Rigid /sliding type/expansion Nos. 2,304
(d) 10008042 T Connectors SM to SM Nos. 966
(e) 10008043 T Connectors TM to SM Nos. 1,527
(f) 10008032 Inter connector TM to 4.5" IPS Al. Tube Nos. 2,130
(g) 10008030 Inter connector QM to 4.5" IPS Al. Tube nos 4,260
(h) 10008037 Inter connector TM to 4" IPS Al. Tube 645
(i) 10008089 Corona spheroid Nos. 692
(j) 10008092 PG Clamps Moose to Moose Nos 510
20 220 kV /132kV Clamps & connectors
a) 10008026 BPI Clamp for Single moose Nos 702
b) 10008097 BPI Clamp for Twin moose through/expansion type Nos. 1,209
c) 10008098 BPI Clamps for 4" IPS Rigid/sliding/expansion type Nos. 2,304
d) 10008100 T Connector SM to SM Nos. 884
e) 10008931 T Connector TM to SM Nos. 1,284
f) 10008080 Isolator connecting Clamps suitable to Twin Moose Nos. 2,119
g) 10008102 Corona spheroid Nos. 692
h) 10008103 PG Clamps Moose to Moose Nos. 480
i) 10008101 Inter connector TM to 4" IPS Al. Tube Nos. 1,124
j) 10008761 Inter connector QM to 4" IPS Al. Tube Nos. 2,267
Pad type Compressor clamp for GS Earth wire to 75 x 12
21 10008105 Nos. 147
Flat
22 10008106 Cleat type clamp for G.S Earth wire Nos. 70
23 10008104 T clamp for GS Earth wire with flexible jumpers Nos. 300
H) POWER AND CONTROL CABLES
72
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
(a) 10003299 3 core 2.5 [Link]. Km 98,599
(b) 10003221 5 core 2.5 [Link]. Km 1,13,092
(c) 10003300 7 core 2.5 [Link]. Km 1,50,929
(d) 10003278 10 core 2.5 [Link]. Km 1,89,000
(e) 10003280 14 core 2.5 [Link]. Km 2,52,683
(f) 10003281 19 core 2.5 [Link]. Km 3,33,452
(g) 10003597 27 core 2.5 [Link]. Km 4,87,770
(h) 10003210 50 Sq. mm Multistrand
Galvanized flexible
cable trays with 2mm copper
thick cable
perforated CRCA Mtrs
6
sheet
(a) 10003603 200 mm size Mtrs 393
(b) 10003531 450 mm size Mtrs 659
7 GI Pipe for entry into cable trench
(a) 10003548 4" Dia 3 mm thick GI Pipe Including Sacials, Bends etc., Mtrs 632
(b) 10003549 6" Dia 3 mm thick GI Pipe Including Sacials, Bends etc., Mtrs 895
I) INDOOR & OUTDOOR ILLUMINATION
1 Indoor Lighting Fixtures.
Control room lighting fixtures -make-CGL-LCBOR-40-
(a) Nos 4,000
CDLor equivalent model in Philips/Bajaj.
73
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
74
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
22 70000966 Aluminium ladders (8ft Height) No. 8,341
AIR CONDITIONING AND VENTILLATION
J)
SYSTEM
A Air Conditioning.
(13) AMF panel for Control & Metering, and alarm as per
specification including all power and control cables, with
75
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
(14) Acoustic insulation for DG Set as per the norms of
Central Pollution Control Board.
(15) All the equipment/material required for
control/monitoring of DG set through Sub-Station
Automation System.
FIRE PROTECTION, DETECTION & ALARM
L)
SYSTEMS
76
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
f) 10009036 Branch pipe with Nozzles. Nos. 3,050
Supply of the following Mild steel black pipes and
11
Mild steel galvanized pipes as per specifications
a) 10009037 300 NB Mtrs 3,940
b) 10009038 250 NB Mtrs 3,365
c) 10009039 200NB Mtrs 1,998
d) 10006447 150NB Mtrs 1,880
e) 10009084 100NB Mtrs 1,560
f) 10009085 80NB Mtrs 1,080
g) 10009074 50NB Mtrs 840
h) 10009075 25NB Mtrs 241
i) 10009076 15NB Mtrs 171
Set of GI & MS Piping beyond deluge valves for
12 10006448 transformer including detection piping and pipe supports Sets 2,45,900
including all accessories complete.
13 Supply of the following valves :-
a) 10006450 300 NB Gate Nos. 34,336
b) 10006451 250 NB Gate Nos. 33,408
c) 10009136 250 NB Check Nos. 21,344
d) 10009137 200 NB Gate Nos. 26,912
e) 10009138 150 NB Gate Nos. 14,848
f) 10009139 100 NB Gate Nos. 15,222
g) 10009140 80 NB Gate Nos. 12,399
h) 10009141 80 NB Check Nos. 10,208
i) 10009142 50 NB Gate Nos. 7,109
j) 10009143 50 NB Check Nos. 4,176
k) 10009144 25 NB Gate Nos. 2,320
l) 10009009 15 NB Gate Nos. 1,763
m) 10009145 Float operated valve 100NB Nos. 21,344
14a) 10009146 Float operated Level guage Nos 14,466
14b) 10009147 Level switch Nos 18,920
15 10009148 Pressure Gauge Nos 1,720
16 10009149 Pressure Switch Nos 4,902
17 10009150 Differential Pressure Gauge Nos 3,143
Deluge valve with motor gounge, pr. switch, [Link],
18 10009151 Sets 98,563
solenoid valve to drain - size 150 NB
19 10009615 Local control panel for Deluge valve Nos. 12,345
20 10009616 Strainer Y type, 150 NB Nos. 25,817
21 10009622 Quartzoid bulb detectors Nos 530
22 10009623 HVW spray nozzles Nos 1,290
Supply of Detection and Alarm system including all
23
hardware and all other accessories
a) 10006637 Multi criteria detectors Nos 2,911
b) 10009626 Heat detector Nos 2,467
c) 10009627 Response indicator Nos 263
d) 10009628 Manual call point Nos 1,655
Fire detection & Alarm panel for control room with 2 Nos
hooters, 2 Nos. sirens and 2 Nos. relay modules with RS-
e) 10009604 Set 1,15,427
485 communication port & all accessories for integrating
in SAS.
Water pressure transducer with input of 0-16 bars and
f) 10010267 with 2nos ports as output of range 4-20mA for integrating Nos 63,692
in SAS.
77
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
Temperature transducer in control room for measuring
ambient temperature with input of 0-75 degree centigrade
g) 10010267 Nos 43,399
and with 2nos ports as output of range 4-20mA for
integrating in SAS.(CR-1, ACK-10)
Supply of the following Portable Fire Extinguishers
24
with all accessories as per specification
Dry chemical powder type Fire extinguishers of 9 kgs.
a) 10009711 Nos 2,173
Capacity.
Dry chemical powder type Fire extinguishers of 25 kgs.
b) 10009712 Nos 10,718
Capacity (trolley mounted).
Dry chemical powder type Fire extinguishers of 50 kgs.
c) 10009713 Nos 14,384
Capacity (trolley mounted).
Dry chemical powder type Fire extinguishers of 150 kgs.
d) 10009714 Nos 39,600
Capacity (trolley mounted).
CO2 type portable Fire extinguishers of 45 kgs. Capacity
e) 10009726 Nos 32,400
(trolley mounted).
CO2 type portable Fire extinguishers of 22.5 kgs.
f) 10009725 Nos 15,266
Capacity (trolley mounted).
CO2 type portable Fire extinguishers of 9 kgs. Capacity
g) 10009724 Nos 8,352
(trolley mounted).
h) 10009719 CO2 type portable Fire extinguishers of 2 kgs. Capacity. Nos 3,434
i) 10009735 9 liters capacity Mechanical foam type fire extinguishers. Nos 2,691
j) 10009715 Sand / water Buckets 9 liters capacity with stand. Nos 360
Fire Alarm Panel for the above detectors with 24V
25 10009602 Nos. 3,663
(12+12) Batteries for supply to be installed in AC Kiosk
26 Mandatory spares
a) 10009044 Self starter of HVW Pumps No 42,484
b) 10009046 Fuel oil filter elements of Diesel engine drive No 12,017
c) 10009048 Gland packing of jockey pumps No 6,117
d) 10009622 Quartzoid bulb detector Nos 530
e) 10009049 Projectors (Nozzles) Nos 1,285
f) 10009626 Heat detectors No 2,384
g) 10009149 Pressure switch No 6,941
h) 10009154 Flaps for check valves 250NB Nos 13,367
i) 10009153 Flaps for check valves 80NB Nos 4,046
j) 10009152 Flaps for check valves 50NB Nos 6,521
k) 70003320 Set of bearings for HVW pumps Set 9,755
l) 70003321 Set of bearings for Jockey pumps Set 5,562
m) 10009148 Pressure Gauge No 2,780
M) 33kV STATION POWER SUPPLY FACILITIES
33kV/433V, 630 KVA Station supply transformers with
1 10000702 Nos. 5,90,393
all accessories and fittings as per specifications.
2 10009247 HT Trivector Meter box. Nos. 6,128
3 10000712 33 KV HG Fuse sets with Insulators. Km 12,845
150 x 150 mm RS Joists, MS channels &Misc. Structural
4 10012509, Steel for 33KV Switchyard CT`s, LA`s, PT`s, CB`s, Nos. 69,472
Isolators & HG Fuse sets.
Hard ware, Clamps, connectors, galvanized bolts, nuts and
washers and other miscellaneous items required for
5 10007320 Nos. 1,08,142
complete erection and commissioning of 33 KV /433 V
facilities as per the specification.
78
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
33 kV CTs with junction box and terminal connectors and
6 10001112 Sets 16,691
all accessories as per specification, 25-15/1-1-1A.
CONTROL HOUSE FURNITURE AND
N)
MONITORING SYSTEM
Godrej make Tables (Model EARL Size 200 W x 1900 D
1 70002812 x 750H mm) or Wipro make (Model Kingsley Premium No. 6,353
Type-A main table).
Credenzas for above (Make Godrej, Model: EARL Size
2100 W x 350D x 1520H) or Wipro make, Model
2 70002813 Wudsafe-LHS:size 750Lx425Dx740HT or equivalent as No. 1,995
per approval of APTRANSCO M/s. Godrej make with
revolving chair.
Self Containing 12 Nos Racks with safety locker make
3 70002727 Set 16,556
Godrej or Wipro or equivalent.
Junior Executive table (1365 x 680 x 7350) mm with
4 70002591 decolam Model No.T-9 make Godrej or Wipro or Nos. 8,982
equivalent.
Steel Table (1199 x 590 x 735) mm with single drawer
5 70002589 and Decolam Top Model. T-111 make Godrej or Wipro or Nos. 5,399
equivalent.
Steel revolving chair model No. CH - 1014 with heavy
6 70002668 base seat and back in cane make Godrej or Wipro make Nos 5,182
model: That's it or equivalent.
Steel Tubular `S Type chair (Continuous Arm) Model No.
Chr-7 in 1" dia and 14 gauge pipe, cane seat and back in
7 70002669 Nos 3,000
teak wood with quality cane make Godrej or Wipro make
model: That's it or equivalent.
Steel Tubular `S` Type chair (without arm) Model No. Chr-
4 in 1" dia and 14 SWG pipe, cane seat and back in teak
8 70002666 Nos 2,289
wood with quality cane make Godrej Wipro make model:
That's it or equivalent.
Steel store well plain (900 x 507 x 1950) mm Make
9 70002711 Godrej, Model: Slimline 4S Text purple colour or Wipro Nos 7,440
make model Endura.
10 70002787 Plastic file trays ( 16'' x 11''x3'') Nos 266
Steel Stools (15''x15"x18") with MS top sheet thickness
11 70002703 20mm 1" square pipe 16 gauge make Godrej or Nos 1,120
equivalent.
12 70002788 Steel waste paper baskets (12"x10"x10") Nos 465
Steel rack (6'x3'x16") with 6 shelves making 5
13 70002726 Nos. 2,800
compartments (22 Gauge)
14 70002745 Short bench (4'x14"x1/2') with laminated Top. Nos. 3,360
15 Display Board for Substation Layout
6' x 5' Plywood Novapan finish with suitable border and
computerized symbols, labels etc of single line diagram as
a) 70002814 No. 4,687
directed by Site Engineer complete suitable for Wall/Floor
stand mounted.
b) 70002815 Aluminium Floor stand for the above. No. 8,652
3' x 2' Wooden key board suitable for holding 30 Nos Key
16 70002816 No. 1,081
chains
Brother P-Touch Sticker lable printer with Software and
17 70001850 No. 14,587
all accessories (Model PT-2700) / Latest Model.
Sticker lables, printer cartridges suitable for (Brother
18
P make) Touch sticker Lables, Printer.
79
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
a) 70001851 24 mm size. No. 396
b) 70001852 18 mm size. No. 325
c) 70001853 12 mm size. No. 252
Supply and fixing of teak wood name boards with enamel
19 70004318 Nos. 3,174
painting letters of size 12"x4" for rooms in control room.
22 70004412 Supply and fixing of notice board of size 2x2.5feet. No. 724
23 70004414 Pictograph of size 2x4feet with letters. No. 5,429
24 Personal computer (with the following configuration)
80
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
Furniture consisting of a table and revolving chair for PC
33 Nos. 6,810
and a table for printer
O) 400KV LINE MATERIALS
1 67500060 Number plates with Bolts &Nuts and Washers No 151
2 67500052 Danger plates with Bolts &Nuts and Washers No 168
3 67500058 Phase plates with Bolts &Nuts and Washers(Set of Three) Sets 199
4 67500055 Circuit plates with Bolts &Nuts and Washers (Set of Two) Sets 240
5 Anti climbing devices
a) 67500033 Tangent towers Nos 3,920
b) 67500034 Small angle towers Nos 5,227
c) 67500035 Medium angle towers Nos 6,533
d) 67500036 Large angle towers Nos 6,533
6 67500042 Bird guards(saw tooth ) Nos 200
7 Earthing of the towers
a) 10006927 Pipe type Earthing Sets Sets 1,271
b) 10003006 Counter poise earthing Sets 3,049
Insulator Hardware & Accessories for conductor and
8
earth wire.
(a) For Quad Moose ACSR conductor
Double Suspension Hardware for Quad ACSR Moose
i) 10007009 Sets 9,897
Conductor
ii) 10007001 Quadruple tension Hardware for ACSR Moose conductor Sets 37,000
iii) 10007011 Pilot string Hardware for Quad ACSR Moose conductor Sets 10,293
iv) 10007274 Quadruple spacer dampers for ACSR Moose Conductor No. 1,373
v) Bundle spacers for ACSR Moose conductor No. 277
Rigid spacers (Quadruple ACSR Moose conductor) for
vi) 10007319 No. 1,027
jumpers.
vii) 10007201 Mid span compression joints for ACSR Moose conductor No. 841
viii) 10007218 Repair Sleeves No. 346
(b) For Twin Moose ACSR conductor
i) 10007027 Double tension Hardware for ACSR Moose conductor Sets 10,020
Double 'I' Suspension Hardware for ACSR/ INVAR
ii) 10007010 Sets 11,071
Moose Conductor
Single Suspension Hardware for ACSR/ INVAR Moose
iii) 10007083 Sets 6,000
Conductor
Single Suspension Pilot string Insulator Hardware for
iv) 10007501 Sets 10,293
Twin Moose ACSR Conductor complete
v) 10007276 Vibration dampers for ACSR Moose Conductor No. 903
Rigid spacers (Twin ACSR Moose conductor) for
vi) 10008569 No. 707
jumpers.
vii) 10007275 Spacer Dampers for ACSR Moose conductor No. 938
(c) For 7/3.65 mm GSS Earth wire
(i) 10007112 Suspension clamps for HTGS Earth Wire Sets 423
(ii) 10007063 Tension clamps for HTGS Earth Wire Sets 418
(iii) 10007279 Vibration dampers for HTGS Earth wire Nos 370
(iv) 10007210 Mid span compression joints for earth wire Nos 220
(v) 10006923 Flexible copper bonds for earth wire. Nos 510
(vi) 10007228 Repair Sleeves Nos 148
81
File No.ENE51-PM0SYI(400)/12/2021-EE2
Rates without
SAP Material GST & F&I
Sl. No. Description Unit
Code (in Rs.)
2020-21
High Tension Galvanized Stranded Steel Earth wire
P) 10010175 KM 41,012
7/3.66 mm
Q) INSULATORS
120KN Disc Insulators (Antifog type with Zinc Sleeve)
(a).i 10007510 No. 510
460mm creepage
120kN Long Rod Insulators(one set= 23 No.s Disc
ii. 10007523 Set 16,338
insulators
iii. 10007601 120KN SRC Insulators -13020mm creepage No. 4,800
160KN Disc Insulators (Antifog type with Zinc Sleeve)
(b).i 10007508 No. 1,030
470mm creepage
160kN Long Rod Insulators(one set= 24 No.s Disc
ii. 10007524 Set 18,419
insulators
iii. 10007600 160KN SRC Insulators -13020mm creepage No. 5,835
82
File No.ENE51-PM0SYI(400)/12/2021-EE2
83
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST and
[Link] SAP Code Category Description Units F&I (in
Rs)
SRR-2020-21
34 10011589 OLTE Spares for Long Haul OLTE and MUX Set 8,52,293
35 10011590 OLTE Spares for Short Haul OLTE and MUX Set 7,31,841
36 10011051 OLTE Digital Tele Protection Signalling equipment No. 2,04,576
37 10011692 OLTE Spares for Digital Tele Protection equipment Set 1,90,000
Fibre distribution panels for termination of Fibres of
38 10011692 OLTE No. 19,163
48 F capacity
84
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST and
[Link] SAP Code Category Description Units F&I (in
Rs)
SRR-2020-21
Fibre approach cable (DWSM) of 24 Fibre capacity
39 10011408 OLTE Km 98,000
with HDPE pipe
Fibre approach cable (DWSM) of 48 Fibre capacity
40 10011469 OLTE Km 1,08,000
with HDPE pipe
Laptop PC for configuration of remote OLTE,
41 10011640 OLTE MUX, Digital Teleprotection equipment with No. 54,818
necessary software
Fusion Splicing Machine (FSM) along with
42 70000317 OLTE No. 4,21,598
standard accessories
43 10012199 OLTE Opticall Time Domain Reflector (OTDR) No. 4,81,154
44 10004917 OLTE Optical Power Meter No. 91,334
45 10011802 OLTE Optical Laser Source No. 1,53,400
OFC tool kit consisting of Fibre stripping tool and
tools for cutting and stripping of sheathing, jacket
46 10011655 OLTE Set 1,86,295
armouring of OFAC/ADSS/OPGW cables
including two binoculars.
Network Management system for SDH and MUX
47 10011696 OLTE along with software and configuration tool ( PC- No. 13,82,633
1No, Chair- 1 No,Table-1No, Printer- 1 No)
SDH STM-4/16 analyzer with optical and electrical
48 10011694 OLTE No. 6,31,814
interfaces
Digital Access Cross Connect Switch (DACS) 16 x
49 10011694 OLTE 16 ports switching matrix, fully equipped for No. 1,10,503
minimum 16 E-1 ports
50 10011902 Cables 125 Ohms Co-axial Cable Km 99,104
51 10011919 Cables 6 pair PVC copper telephone Cable Km 37,637
52 10011925 Cables single pair PVC copper telephone Cable Km 7,111
53 10005696 Cables 25 Sqmm Battery cable Km 2,44,667
54 10003262 Cables 2.5 [Link], 2 Core Un-armoured Copper cable Km 35,900
55 10011965 Cables Cat 6 cable (305 mtrs each box) Box 5,654
20 pair Armoured jelly filled copper telephone
56 10011907 Cables Km 1,74,760
Cable
10 pair Armoured jelly filled copper telephone
57 10011913 Cables Km 73,713
Cable
Battery
58 10005230 48V/200Ah(1+0) Battery Set Set 62,400
Chargers
Battery
59 10005228 48V/250Ah(1+0) Battery Set Set 77,040
Chargers
Battery
60 10005551 48V/300Ah(1+0) Battery Set Set 88,200
Chargers
Battery
61 10005347 48V/400Ah(1+0) Battery Set Set 1,17,600
Chargers
Battery
62 10005326 48V/35A (1+0) Battery Charger No. 1,47,068
Chargers
85
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST and
[Link] SAP Code Category Description Units F&I (in
Rs)
SRR-2020-21
Battery
63 10005321 48V/50A (1+0) Battery Charger No. 1,55,614
Chargers
Battery
64 10005317 48V/100A (1+0) Battery Charger No. 1,96,105
Chargers
Battery
65 10010924 48V/150A (1+0) Battery Charger No. 2,33,000
Chargers
66 10010924 EPAX EPAX (16/16) with 2 E1 cards wired for 128 ports No. 1,45,777
86
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST and
[Link] SAP Code Category Description Units F&I (in
Rs)
SRR-2020-21
1250A/0.5 mH Wavetrap along with mounting
89 10010605 PLCC No. 1,55,360
Pedastal and insulator stack.
630A/0.2 mH Wavetrap along with accessories
90 10010613 PLCC No. 1,01,315
suitable for suspension mounting.
91 70001996 PLCC FSK Modem No. 1,25,466
92 70001525 PLCC Earth Megger No. 13,988
93 10012151 PLCC Selective Level meter No. 3,06,800
94 10012162 PLCC Selective Level Oscillator No. 2,33,919
97 EPAX EPAX(32/32) with 2 E1 cards wired for 128 ports No. 2,91,350
98 EPAX EPAX(32/32) 128 universally wired ports No. 2,32,570
spares for EPAX(32/32) with 2 E1 cards wired for
99 EPAX Set 83,393
128 ports
100 EPAX spares EPAX(32/32) 128 universally wired ports Set 70,624
87
File No.ENE51-PM0SYI(400)/12/2021-EE2
Auto/ Power Transformers and Reactors Rates
Ex-Works Price
without GST
[Link]. SAP CODE Description of Transformer/Reactor Unit and F&I
(in Rs)
SSR-2020-21
500MVA, 400/220/33KV Auto Transformer with all
1 10000000 No. 16,61,42,952
accessories.
315MVA, 400/220/33KV Auto Transformer with all
2 10000001 No. 9,80,00,000
accessories.
160MVA, 220/132/11KV Auto Transformer with all
3 10000005 No. 5,90,60,000
accessories.
100MVA, 220/132/11KV Auto Transformer with all
4 10000007 No. 4,15,00,000
accessories.
80MVA, 220/33KV Power Transformer with all
5 10000009 No. 4,50,00,000
accessories.
80MVA, 132/33KV Power Transformer with all
6 10000023 No. 4,00,00,000
accessories.
50MVA, 220/33KV Power transformer with all
7 10000024 No. 3,32,45,763
accessories.
50MVA, 132/33KV Power transformer with all
8 10000010 No. 3,64,30,870
accessories.
31.5MVA, 132/33KV Power transformer with all
9 10000025 No. 1,80,00,000
accessories.
10 10012591 125MVAR, 400KV Shunt Reactor withh all accessories. No. 7,50,00,000
11 10000821 80MVAR, 400KV Shunt Reactor withh all accessories. No. 6,50,00,000
88
File No.ENE51-PM0SYI(400)/12/2021-EE2
Control and Relay Panels along with SAS equipment for 400KV, 220KV AND 132KV
SUBSTATIONS
Ex-Works Price
without GST
[Link]. SAP Code Description of Equipment/ Material Unit and F&I
(in Rs)
SRR-2020-21
89
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST
[Link]. SAP Code Description of Equipment/ Material Unit and F&I
(in Rs)
SRR-2020-21
125MVAR Bus Reactor Main CB Control & Relay Panel
16 10004011 Nos 6,05,000
as per 400KV Specification.
125MVAR Bus Reactor CB Protection Panel as per
17 10004009 Nos 9,56,432
400KV Specification.
Mandatory Spares for Control and Relay Panels as per
18 10004253 Lot 21,27,744
400KV Specification.
19 10004035 220 kV Feeder Control & Relay Panels with BCUs Nos 9,90,509
220/132kV Power Transformer Control & Relay Panels
20 10004037 Nos 10,89,102
with BCUs
220kV Bus Bar Scheme Panel (for 16 Bays) for double
21 10004027 Nos 14,50,000
bus system
22 10004023 220kV Bus Coupler Panel with BCUs. Nos 4,60,583
10004047 132 kV feeder Control & Relay Panel with BCUs with
23 Nos 4,51,417
10004048 Distance relay
10004048
132 kV Feeder Control & Relay Panel with BCUs with
24 10004049 Nos 7,50,000
Line Differential relay
90
File No.ENE51-PM0SYI(400)/12/2021-EE2
XLPE POWER CABLE AND ACCESSORRIES RATES FOR 400KV, 220KV and 132KV
Ex-Works Price
without GST
[Link]. SAP Code Description of Equipment/ Material Unit and F&I (in
Rs) SSR-2020-
21
Supply of 400 KV XLPE Under ground Single Core 2500
1 KM 3,89,39,067
[Link]. Copper Cable.
91
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST
[Link]. SAP Code Description of Equipment/ Material Unit and F&I (in
Rs) SSR-2020-
21
19 10003662 3 Phase Link boxes With SVL to cross bond the sheath. Nos. 1,06,600
3 Phase Link boxes With out SVL to cross bond the
20 10003663 Nos. 59,568
sheath.
21 10003665 1 phase Link boxes without SVL. Nos. 19,987
Supply of 240 sqmm coaxial copper cable conductor PVC
22 10003206 insulated 6.6 KV grade with suitable lugs and glands for KM 48,50,000
joint bays.
Supply of 240 sqmm coaxial copper cable conductor PVC
23 10003209 insulated 6.6 KV grade with sheath bonding without cross KM 26,50,000
bonding joints to link box.
24 33KV 400Sqmm 1 core copper XLPE cable KM 28,94,300
25 33KV 400Sqmm 3core Al XLPE cable KM 21,05,900
92
File No.ENE51-PM0SYI(400)/12/2021-EE2
GIS EQUIPMENT RATES FOR 400KV, 220KV, 132KV and 33KV
Ex-Works Price
without GST
[Link]. SAP Code Description of Equipment/ Material Unit and F&I
(in Rs)
SSR-2020-21
420kV, 4000 A, 63 kA, SF6 GIS transformer/feeder bay
1 10010470 SET 3,85,00,000
module.
420kV, 4000A, 63 kA, SF6 GIS Auxiliary Bus module for
2 10010468 SET 1,85,00,000
Spare Transformer/feeder.
420kV, 4000 A, 63 kA, SF6 GIS Line feeder bay module
3 10010469 SET 4,25,00,000
(with PIR).
420kV, 4000 A, 63 kA, SF6 GIS Line Reactor bay
4 SET 3,60,00,000
module.
5 10010471 420kV, 4000A, 63 kA, SF6 GIS Bus Reactor bay module. SET 3,60,00,000
93
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST
[Link]. SAP Code Description of Equipment/ Material Unit and F&I
(in Rs)
SSR-2020-21
70001118
23 70001119 EOT Crane for GIS Building (220kV bus Duct). SET 21,00,000
94
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST
[Link]. Description of Equipment/ Material Unit
and F&I (in Rs)
SSR-2020-21
95
File No.ENE51-PM0SYI(400)/12/2021-EE2
Ex-Works Price
without GST
[Link]. Description of Equipment/ Material Unit
and F&I (in Rs)
SSR-2020-21
96