BRO Cafe RFP for PPP Development
BRO Cafe RFP for PPP Development
ISSUED BY:
VILLAGE BICHHWAL
BIKANER
RAJASTHAN 334006
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
e-Tender notice for Development, Operation and Maintenance of BRO Cafe located in
Rajasthan State through PPP mode on Design, Build, Finance, Operate and Transfer
(DBFOT) basis.
Chief Engineer Project Chetak invites proposals from interested Bidder(s) to submit their
Bids for Development, Operation and Maintenance of BRO Cafe located in Rajasthan
State through PPP mode on Design, Build, Finance, Operate and Transfer (DBFOT)
basis.
The detailed request for proposal (RFP) and Draft Concession Agreement (DCA) are
available on the online on e-tendering portal [Link] and BRO Website
[Link]. The bidder(s) can submit their bid(s) online on the above mentioned e-
tendering portal as per the dates mentioned under schedule of RFP process (clause
1.3). BRO reserves the right to accept/reject any/all the bid(s) without assigning any
reason whatsoever.
CHIEF ENGINEER
PROJECT CHETAK
VILLAGE BICHHWAL
BIKANER
RAJASTHAN 334006
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Table of Contents
DISCLAIMER
2. This RFP is not an agreement and is neither an offer nor invitation by the
Authority to the prospective Bidders or any other person. The purpose of
this RFP is to provide interested parties with information that may be
useful to them in the formulation of their Bid for qualification pursuant to
this RFP. This RFP includes statements, which reflect various
assumptions and assessments arrived at by the Authority in relation to the
Project. Such assumptions, assessments and statements do not purport to
contain all the information that each Bidder may require.
3. This RFP may not be appropriate for all persons, and it is not possible for
the Authority, its employees or advisors to consider the investment
objectives, financial situation and particular needs of each party who reads
or uses this RFP. The assumptions, assessments, statements and
information contained in this RFP may not be complete, accurate, adequate
or correct. Each Bidder should therefore, conduct its own investigations
and analysis and should check the accuracy, adequacy, correctness,
reliability and completeness of the assumptions, assessments,
statements and information contained in this RFP and obtain independent
advice from appropriate sources.
6. The prospective Bidders are hereby informed that BRO Café are going to
in Rajasthan State The Project envisages Design, Built, Finance, Operate
and Transfer of the said unit, details of which have been mentioned in this
RFP.
7. The Authority may, in its absolute discretion but without being under any
obligation to do so, update, amend or supplement the information,
assessment or assumptions contained in this RFP.
8. The issue of this RFP does not imply that the Authority is bound to select
or to appoint the Selected Bidder or Concessionaire, as the case may be,
for the Project and the Authority reserves the right to reject all or any of
the Bids or Bids without assigning any reasons whatsoever.
9. The Bidder shall bear all its costs associated with or relating to the
preparation and submission of its Bid including but not limited to
preparation, copying, postage, delivery fees, expenses associated with
any demonstrations or presentations which may be required by the
Authority or any other costs incurred in connection with or relating to its Bid.
All such costs and expenses will remain with the Bidder and the Authority
shall not be liable in any manner whatsoever for the same or for any other
costs or other expenses incurred by a Bidder in preparation for submission
of the Bid, regardless of the conduct or outcome of the Bidding Process.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
GLOSSARY
Associate As defined in Clause 2.2.7
Chief Engineer Project Chetak (CE, the Authority) invites proposals Bids from interested
entities (the “Bidders”, as the context may require) to submit their Bids for Development,
Operation and Maintenance of BRO Cafe (the Project) located in Rajasthan State through
PPP Mode on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
i. The proposed project site is located at various location in Rajasthan State and the
proposal locations are listed in the document. The Suggested layout of BRO cafe is
enclosed.
ii. Bidders are encouraged to submit their bids after visiting the project site and
aquiant themselves with the Project and its details.
iii. The authority is now desirous of selecting Bidder (the “Selected Bidder”) through
competitive bidding process in accordance with the procedure set out herein under this
RFP who shall develop, operate and maintain the project for a p e- determined.
Concession period as mentioned in this RFP, through a Special purpose Vehicle (SPV)
incorporated under the Companies Act, 2013.
.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Viii In case Bidders require any further information about the Project or
need access to any other documents related to the Project, as available with
the Authority or wish to visit the Project Site, they are requested to contact the
following persons at the addresses given below but the cost of the visit shall
be borne by the Bidders :
The Bid shall be prepared in English language and all entries must be
typed/written in blue/ black ink. Initials of the Authorized Representative
of the Bidder must attest all deletions and alterations made while
preparation of the Bid.
ix. The Authority shall not be responsible for any costs or expenses or
liabilities incurred by the Bidders in connection with the preparation and
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
delivery of Bids, including costs and expenses related to the visits to the
Project Site. The Authority reserves the rights to cancel, terminate, change
or modify this procurement process and/or requirements of bidding stated in
the RFP, at any time without assigning any reason or providing any notice
and without accepting any liability for the same.
1. INTRODUCTION
Background
The facility shall be deemed to be fully functional from the next day when
the committee approves it for functioning.
The SOP shall be issued by the Committee including the rates of the
items to be sold by the Concessionaire through the facility.
The entire business model for operations including procurement and
marketing shall be the responsibility of the Private Player /Concessionaire.
Any support required for successful operation of the project can be
mutually discussed during the operational phase between the Authority
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
and the Private Player
1.1.4 The Authority shall receive Bids pursuant to this RFP in accordance
with the terms set forth herein as modified, altered, amended and
clarified from time to time by the Authority, and all Bids shall be
prepared and submitted in accordance with such terms on or before
the due date specified in Clause 1.3 for submission of Bids (the “Bid
Due Date”).
1.1.6 The Authority shall receive Bids pursuant to this RFP in accordance
with the terms set forth in this RFP, to be set forth in the Concession
Agreement and other documents that are provided or may be
provided by the Authority, as modified, altered, amended and
clarified from time to time by the Authority (collectively the “Bidding
Documents”).
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
1.2.1 The Authority has adopted a single stage bidding process (“Bidding
Process”) for selection of the Bidder for award of the Project. All Bidders
for the Project shall simultaneously submit their relevant qualification
details for the purpose of meeting Technical Qualification Criteria
comprising of Technical Capacity and Financial Capacity conditions
(“Technical Bid”) and bid price quoting the Annual Concession Fee
(the “ACF”) plus applicable taxes at the prevailing rates payable to the
Authority as mentioned in Clause 3.5.1 (“Bid Price”) to the Authority in
accordance with the terms set forth in the RFP (the “Financial Bid”) which
shall essentially be more than Rs. __________Only). In case, the bidder
submits the financial bid containing the ACF less than the reserve price
then in such an event the bidder shall be declared disqualified and its bid
shall stand rejected. The ACF shall increase at the rate of 5% every 3
years.
1.2.2 In the first step, Technical Bid of all Bidders shall be evaluated as to
whether they are responsive in terms of Clause 2.18 and meet the
Technical Qualification Criteria as set forth in Clause 2.2.1 of this
RFP for undertaking the Project. The Financial Bids of only those
Bidders who are considered responsive and meet the Technical
Qualification Criteria (the “Qualified Bidder(s)”) will be opened and
evaluated for the purpose of identifying the Selected Bidder for the
Project.
1.2.5 The Bid shall be valid for a period of not less than 180 (one hundred
and eighty) days from the date specified in the RFP for submission
of Bids (the “Bid Validity Period”).
1.2.6 In terms of this RFP, a Bidder will be required to submit bid security
declaration along with its Bid (the “Bid Security”), in the form of
Bank Guarantee as per the format provided at Appendix II: Bank
Guarantee for Bid Security refundable no later than 60 (sixty) days
from the Bid Due Date, except in the case of the Selected Bidder whose
Bid Security shall be retained till it has provided a Performance
Security pursuant to the provisions of the Concession Agreement.
The Bidders will have an option to provide Bid Security in the form of
a demand draft or an unconditional and irrevocable bank guarantee
acceptable to the Authority and in such an event, the validity period
of the bank guarantee, as the case may be, shall not be less than 180
(one hundred and eighty) days from the Bid Due Date, inclusive of a
claim period of 60 (sixty) days, and may be extended as may be
mutually agreed between the Authority and the Bidder from time to
time. The Bid shall be summarily rejected if it is not accompanied by
the Bid Security. The bank guarantee shall be uploaded online.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Schedule of Request for Proposal (RFP) Process
2. INSTRUCTIONS TO BIDDERS
A. GENERAL
2.1.1 The Authority wishes to receive Bids for selection of an experienced and
capable Bidder for the Project who meets the Technical Qualification
Criteria as mentioned in Clause 2.2.1.
2.1.3 The Bidders shall be responsible for all the costs associated with the
preparation of their Bids and their participation in the Bidding Process.
The Authority shall not be responsible or in any way liable for such
costs, regardless of the conduct or outcome of the Bidding Process.
2.1.4 For participation in the e-tendering process, the Bidders need to register
themselves on the e-procurement website i.e. [Link]
registration they shall be provided with a User ID and a system
generated password enabling them to submit their bid along with
Digital System Certificate (DSC) and for further information which can
be accessed as from the website as mentioned in Clause 1.2.3.
2.1.5 Bids without digital signatures will not be accepted online on the e-
procurement website i.e., [Link] No Bid will be
accepted only in physical form and in case it has been submitted only
in the physical form it shall be rejected summarily.
iii. The Bidder shall not have a conflict of interest (the “Conflict of
Interest”) that affects the Bidding Process. Any Bidder found to
have Conflict of Interest shall be disqualified. The Bidder shall be
deemed to have a Conflict of Interest affecting the Bidding Process,
if:
a) The Bidder, its Member or Associate (or any constituent thereof)
and any other Bidder, its Member or any Associate thereof (or any
constituent thereof) have common controlling shareholders or other
ownership interest; provided that this disqualification shall not apply
in cases where the direct or indirect shareholding of the Bidder, its
Member or an Associate thereof (or any shareholder thereof
having a shareholding of more than 5% (five percent) of the paid
up and subscribed share capital of such Bidder, Member or
Associate, as the case may be) in the other Bidder, its Member or
Associate is less than 5% (five percent) of the subscribed and paid
up equity share capital thereof; provided further that this
disqualification shall not apply to any ownership by a bank,
insurance company, pension fund or a public financial institution
referred to in Section 72 of the Companies Act, 2013. For the
purposes of Clause 2.2, indirect shareholding held through one or
more intermediate persons shall be computed as follows: (a) where
any intermediary is controlled by a person through management
control or otherwise, the entire shareholding held by such
controlled intermediary in any other person (the “Subject
Person”) shall be taken into account for computing the
shareholding of such controlling person in the Subject Person; and
(b) subject always to sub-clause(a) above, where a person does
not exercise control over an intermediary, which has shareholding
in the Subject Person, the computation of indirect shareholding of
such person in the Subject Person shall be undertaken on a
proportionate basis; provided, however, that no such
shareholding shall be reckoned under this sub- clause if the
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
shareholding of such person in the intermediary is less than 20%
(twenty percent) of the subscribed and paid up equity
shareholding of such intermediary; a constituent of such Bidder is
also a constituent of another Bidder; or
B. Financial Capacity:
2.2.2 The Bidders shall enclose with its Bid, to be submitted as per the format
at APPENDIX I Complete with its Annexes, the following:
i. Certificate(s) from Statutory Auditors of the Bidder stating the
payments investment made and the works commissioned, as
the case may be, during the past 10 (ten) years in respect of the
projects specified in Clause 2.2.1 (A) above. In case a particular
job/ contract has been jointly executed by the Bidder (as part of a
Consortium), it should further support its claim for the share in
work done for that particular job/ contract by producing a certificate
from its Statutory Auditor or the client; and
2.2.3 The Bidder should submit a Power of Attorney as per the format
prescribed under Appendix-III, authorizing the signatory of the Bid
to commit the Bidder. The Power of Attorney should be supported by
a Board Resolution confirming the Authorized Signatory. In the case
of a Consortium, the Members should submit a Power of Attorney
in favor of the Lead Member as per format prescribed under
Appendix-IV.
(d) The Bid should include a brief description of the roles and
responsibilities of individual members, particularly with reference
to financial, technical and O&M obligations;
(f) Members of the Consortium shall enter into a binding Joint Bidding
Agreement, substantially in the form specified under Appendix-V
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
(the “Joint Bidding Agreement”). The Joint Bidding Agreement,
to be submitted along with the Bid, shall, inter alia:
ii. clearly outline the proposed roles and responsibilities, if any, of each
Member;
iv. NIL;
(h) In case the Consortium is selected as the Selected Bidder, the Lead
Member along with other Consortium members shall be jointly and
severally liable for the execution of the Project in accordance with the
terms of the RFP;
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
(i) Any change in the Member(s) of Consortium after submission of the
Bid shall result in disqualification of the Bidder; and;
(j) The Bid shall be legally binding on all the members of the Consortium
(k) Except as provided under this RFP and the Bidding Documents, there
shall not be any amendment to the Joint Bidding Agreement without the
prior written consent of the Authority.
2.2.5 Any entity (the Bidder, its Member, or Associate was, either by itself or
as member of a consortium) which has been barred by the Central/ State
Government, or any entity controlled by it, from participating in any
project and the bar subsists as on the date of Bid, would not be eligible
to submit a Bid, either individually or as member of a Consortium.
(a) Bidders should attach clearly marked and referenced continuation sheets in
the event that the space provided in the prescribed forms in the Annexes
is insufficient. Alternatively, Bidders may format the prescribed forms
making due provision for incorporation of the requested information;
2.2.9 While the process is open to any person, the following provisions shall
apply:
(a) Where, on the date of the Bid, 25% (twenty-five per cent) or more of the
aggregate issued, subscribed and paid-up equity share capital in the Bidder
or its Member is held by person resident outside India or where a Bidder
or its Member is controlled by person resident outside India; or
(b) *if at any subsequent stage after the date of the Bid, there is an acquisition
of 25% (twenty- five per cent) or more of the aggregate issued, subscribed
and paid-up equity share capital or control, by person’s resident outside
India, in or of the Bidder or its Member;
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
2.3.1 By submitting the Bid, the Bidder acknowledges that it was qualified and
short-listed on the basis of Technical Capacity and Financial Capacity of
those of its Consortium Members who shall, until the 5th (fifth)
anniversary of the date of commercial operations of the Project, hold
equity share capital representing not less than 20% (twenty per cent) of
the subscribed and paid-up equity of the Concessionaire.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
2.3.1 The Bidder further acknowledges and agrees that the aforesaid
obligation shall be the minimum and shall be in addition to such other
obligations as may be contained in the Concession Agreement, and a
breach hereof shall, notwithstanding anything to the contrary contained
in the Concession Agreement, be deemed to be a breach of the
Concession Agreement and dealt with as such there under. For the
avoidance of doubt, the provisions of this Clause 2.3.1 shall apply only
when the Bidder is a Consortium.
2.3.2 By submitting the Bid, the Bidder shall also be deemed to have
acknowledged and agreed that in the event of a change in control of a
member of the Consortium or an Associate whose Technical Capacity
and/ or Financial Capacity was taken into consideration for the purposes of
short-listing and qualification under and in accordance with the RFP, the
Bidder shall be deemed to have knowledge of the same and shall be
required to inform the Authority forthwith along with all relevant particulars
about the same and the Authority may, in its sole discretion, disqualify
the Bidder or withdraw the LoA from the Selected Bidder, as the case
may be.
2.3.3 In the event such change in control occurs after signing of the Concession
Agreement but prior to the 5th (fifth) anniversary of the date of
commercial operation of the Project, it would, notwithstanding anything to
the contrary contained in the Concession Agreement, be deemed to be a
breach of the Concession Agreement, and the same shall be liable to be
terminated without the Authority being liable in any manner whatsoever
to the Concessionaire. In such an event, notwithstanding anything to the
contrary contained in the Concession Agreement, the Authority shall be
entitled to forfeit and appropriate the Bid Security or Performance Security,
as the case may be, as Damages, without prejudice to any other right or
remedy that may be available to the Authority under the Bidding
Documents and/ or the Concession Agreement or otherwise.
2.4.1No Bidder shall submit more than one Bid for the Project. A Bidder
applying individually or as a member of a Consortium shall not be entitled
to submit another Bid either individually or as a member of any
Consortium as the case may be. In response to this Bid any Bidder who
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
submits or participate in more than one Bid shall be disqualified.
Bidders are encouraged to submit their respective Bids after visiting the
Project Site and ascertaining for themselves the location, surroundings,
climate, availability of power, water and other utilities for re-development,
access to site, weather data, applicable laws and regulations or any other
matter considered relevant by them. The Bidders shall visit the Project Site in
accordance with the provision of Clause 1.2.4.
2.6.1 It shall be deemed that by submitting the Bid, the Bidder has:
2.6.2 The Authority shall not be liable for any omission, mistake or error in
respect of any of the above or on account of any matter or thing
arising out of or concerning or relating to RFP or the Bidding
Process, including any error or mistake therein or in any information
or data given by the Authority.
2.7.2 The Authority reserves the right to reject any Bid and/or disqualify the Bidder
if:
b) The Bidder does not provide, within the time specified by the
Authority, the supplemental information sought by Authority for
evaluation of the Bid.
2.7.4 In case it is found during the evaluation or at any time before signing
of the Concession Agreement or after execution of the Concession
Agreement and during the period of subsistence thereof, including
the Concession thereby granted by the Authority, that one or more of
the qualification conditions have not been met by the Bidder or the
Bidder has made material misrepresentation or has given any
materially incorrect or false information, the Bidder shall be
disqualified forthwith if not yet appointed as the Concessionaire either
by issue of the LoA or entering into of the Concession Agreement,
and if the Bidder has already been issued the LoA or has entered
into the Concession Agreement, as the case may be, the same
shall, notwithstanding anything to the contrary contained therein or in
this RFP, be liable to be terminated, by a communication in writing by
the Authority to the Bidder, without the Authority being liable in any
manner whatsoever to the Bidder and without prejudice to any other
right or remedy which the Authority may have under this RFP the
Bidding Documents, the Concession Agreement or under applicable
law.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
2.7.5 The Authority reserves the right to verify all statements, information
and documents submitted by the Bidder in response to the RFP. Any
such verification or lack of such verification by the Authority shall not
relieve the Bidder of its obligations or liabilities hereunder nor will it
affect any rights of the Authority there under.
B. DOCUMENTS
This RFP comprises the disclaimer set forth hereinabove, the contents as
listed below, and will additionally include any Addenda issued in
accordance with Clause 2.10
Section 1 Introduction
Section 2 Instructions to Bidders
Section 3 Criteria for evaluation
Section 4 Fraud and corrupt practices
Section 5 Pre-Bid Conference
Section 6 Miscellaneous
Appendices
I. Letter comprising the Bid
II. Bank Guarantee for Bid Security
III. Power of Attorney for signing of Bid
IV. Power of Attorney for Lead Member of Consortium
V. Joint Bidding Agreement for Consortium
VI. Guidelines of the Department of Disinvestment
VII. Self-Undertaking
VIII. Self-Assessment Performa
IX. (A) Financial Proposal- Cover Letter
(B) Financial Proposal
2.9 Clarifications
2.9.2 The Bidders should send in their queries at least 2 (two) days prior to
the Pre-Bid Conference date specified in the Schedule 1.3 of the RFP.
The Authority shall endeavor to respond to the queries within the period
specified therein. Thereto, but no later than 7 (seven) days prior to the
Bid Due Date, the Authority may choose to upload the responses on
the e-procurement website i.e. [Link] specified in the
RFP advertisement.
2.10.1 At any time prior to the deadline for submission of Bid, the Authority
may, for any reason, whether at its own initiative or in response to
clarifications requested by Bidder, modify the RFP by the issuance
of Addendum.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
2.11 Language
2.11.1 The Bid and all related correspondence and documents should be
written in the English language. Supporting documents and printed
literature uploaded on website by the Bidder with the Bid may be in
any other language provided that they are accompanied by
appropriate translations of the pertinent passages in the English
language, duly authenticated and certified by the Bidder. Supporting
materials, which are not translated into English, may not be
considered. For the purpose of interpretation and evaluation of the Bid,
the English language translation shall prevail.
2.12.1 The Bidder shall provide all information sought under this RFP. The
Authority would evaluate only those Bids that are received in the
required format and complete in all respects. Incomplete and / or
conditional Bids shall be liable for rejection.
2.12.2 The Bid shall be stamped and signed by the Authorized Signatory of
the Bidder. In case of printed and published documents, only the
cover shall be initialed. All the alterations, omissions, additions or
any other amendments made to the Bid shall be initialed by the
person(s) signing the Bid. The Bid shall contain page numbers.
2.14.1 Bids received by the Authority after the Bid Due Date shall not be
eligible for consideration and shall be summarily rejected. The
Authority shall not be responsible for any delay in submission of the
same.
2.15.1 The Bidder may modify, substitute or withdraw its Bid after
submission provided that written notice of the modification,
substitution or withdrawal is received by the Authority within the Bid
Due Date. No Bid shall be modified, substituted or withdrawn by the
Bidder after the Bid Due Date.
D. Evaluation Process
2.17.1 The Authority would open the Bids as per the schedule specified in
Clause 1.3 of this RFP in the presence of the Bidders who choose to
attend.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
2.17.2 Bids for which a notice of withdrawal has been submitted in accordance
with Clause 2.15 shall not be opened.
2.17.5 Any information contained in the Bid shall not in any way be construed
as binding on the Authority, its consultants, agents, successors or
assigns, but shall be binding against the Bidder if any Project is
subsequently awarded to it under the Bidding Process on the basis
of such information.
2.17.6 The Authority reserves the right not to proceed with the Bidding
Process at any time without notice or liability and to reject any Bid
without assigning any reasons.
2.17.8 In the event the Bidder claims credit for an Eligible Project, and such
claim is determined by the Authority as incorrect or erroneous, the
Authority shall reject such claim and exclude the same from
computation of the Technical Capacity. Where any information is
found to be patently false or amounting to a material
misrepresentation, the Authority reserves the right to reject the Bid
in accordance with the provisions of Clauses 2.7.1 and 2.7.4.
2.18 Confidentiality
2.19.1 Prior to evaluation of Bids, the Authority will determine whether each
Bid is responsive to the requirements of the RFP. A Bid shall be
considered responsive only if:
d) It contains the Bid Security declaration as per the format Appendix II;
2.19.2 The Authority reserves the right to reject any Bid, which is non-
responsive, and no request for alteration, modification, substitution or
withdrawal shall be entertained by the Authority in respect of such Bid.
2.20.2 If the Bidder does not provide clarifications sought under Clause
2.19.1 within the prescribed time, its Bid shall be liable to be
rejected. In case the Bid is not rejected, the Authority may proceed to
evaluate the Bid by construing the particulars requiring clarification
to the best of its understanding, and the Bidder shall be barred from
subsequently questioning such interpretation of the Authority.
2.22.1 Save and except as provided in this RFP, the Authority shall not
entertain any correspondence with any Bidder in relation to the
acceptance or rejection of any Bid.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
3. CRITERIA FOR EVALUATION OF BIDS
Evaluation parameters
3.1.1 Only those Bidders who meet the eligibility criteria specified in Clause
2.2 of this RFP above shall qualify for participation in the Bidding
Process. Bids of firms/ consortia who do not meet these criteria shall be
rejected.
1. Technical Capacity
2. Financial Capacity
3.2.1 The Bidder should furnish the details of Eligible Experience for the past
10 (Ten) years preceding the Bid Due Date.
3.2.2 The Bidders must provide the necessary information relating to Technical
Capacity as per format at Annexure II: Technical Capacity of Bidder of
Appendix I: Letter Comprising the Bid.
3.3.1 The Bid must be accompanied by Audited Annual Reports of the Bidder
(of each member in case of a Consortium and of the Associate if relying
on the Turnover & Net-worth of Associate for the purpose of
qualification) for the last 3 (three) financial years, preceding the Bid Due
Date.
3.3.2 In case the annual accounts for the latest financial year are not audited
and therefore the Bidder cannot make it available, the Bidder shall give
an undertaking to this effect and the statutory auditor shall certify the
same. In such a case, the Bidder shall provide the Audited Annual
Reports for 3 (three) years preceding the year for which the Audited
Annual Report is not being provided.
3.3.3 The Bidder must establish average annual Turnover and minimum Net
Worth specified in Clause 2.2.1 (B) and provide details as per format at
Annexure III: Financial Capacity of Bidder of Appendix I: Letter
Comprising the Bid.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
3.4.1 The Authority shall qualify and shortlist the Bidders who fulfill the
stipulated Technical and Financial Capacity criteria as set out in this
RFP, along with the other conditions of the RFP.
3.4.2 The Authority will notify the other Bidders also who do not fulfill either
or both of the Technical and Financial Capacity. The Authority will not
entertain any query or clarification from Bidders who fail to qualify.
3.5.1 The Authority would open the Bid as per the schedule specified in
Clause 1.3. Bidder whose Bid is adjudged as responsive in terms of
Clause 3.2.1 and who quotes the highest “Annual Concession Fee
(ACF)” payable to the Authority payable annually for the
concession granted shall be ranked as H1 Bidder and all other
Bidders shall be placed below and ranked accordingly as H2 or H3
Bidder depending upon their quoted ACF. Subject to the provisions of
this Agreement the H1 Bidder shall be declared as the Selected Bidder.
Any Bidder who quotes Annual Concession Fee lower than the Reserve
Price shall be disqualified from the Bidding Process.
3.5.2 In the event that two or more Bidders quote the same amount of
Annual Concession Fee (the “Tie Bidders”), the Authority shall
identify the Selected Bidder by draw of lots, which shall be
conducted, with prior notice, in the presence of the Tie Bidders who
choose to attend.
3.5.3 In the event that the Highest Bidder withdraws or is not selected for
any reason in the first instance (the “first round of bidding”), the
Authority may invite all the remaining Bidders to revalidate or extend
their respective Bid Security, as necessary, and match the Bid of the
aforesaid Highest Bidder (the “second round of bidding”). If in the
second round of bidding, only one Bidder matches the Highest Bidder,
it shall become the Selected Bidder. If two or more Bidders match
the said Highest Bidder in the second round of bidding, then the
Bidder whose Bid was higher as compared to other Bidder(s) in the
first round of bidding shall be the Selected Bidder. For example, if
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
the third and fifth highest Bidders in the first round of bidding offer to
match the said Highest Bidder in the second round of bidding, the
said third highest Bidder shall be the Selected Bidder.
3.5.4 In the event that no Bidder offers to match the Highest Bidder in the
second round of bidding as specified in Clause 3.3.3, the Authority
may, in its discretion, invite
fresh Bids (the “third round of bidding”) from all Bidders except the
Highest Bidder of the first round of bidding, or annul the Bidding
Process, as the case may be. In case the Bidders are invited in the
third round of bidding to revalidate or extend their Bid Security, as
necessary, and offer fresh Bids, they shall be eligible for submission of
fresh Bids provided, however, that in such third round of bidding only
such Bids shall be eligible for consideration which are higher than
the Bid of the second highest Bidder in the first round of bidding.
3.6.1 After selection, a Letter of Award (the “LoA”) shall be issued by the
Authority to the Selected Bidder and the Selected Bidder shall, within
7 (seven) days of the receipt of the LOA, sign and return the
duplicate copy of the LOA in acknowledgement thereof. In the event
the duplicate copy of the LOA duly signed by the Selected Bidder is
not received by the stipulated date, Authority may, unless it consents
to extension of time for submission thereof, appropriate the Bid
Security of such Bidder as Damages on account of failure of the
Selected Bidder to acknowledge the LOA, and the next eligible Bidder
may be considered.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Arbitration
In the event of any question, dispute or difference arising between the parties
in relation to this agreement or in connection therewith the same shall be
referred to the sole arbitrator to be appointed by the Authority. The award of
the Arbitrator will be final and binding upon both the parties. The Arbitrator
proceedings will be governed under the Arbitration and Conciliation Act, 1996
and the seat of the Arbitrator will be at Chandigarh.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
4. FRAUD & CORRUPT PRACTICES
The Bidders and their respective officers, employees, agents and advisers
shall observe the highest standard of ethics during the Bidding Process.
Notwithstanding anything to the contrary contained herein, the Authority
shall reject a Bid without being liable in any manner whatsoever to the
Bidder if it determines that the Bidder has, directly or indirectly or through
an agent, engaged in corrupt practice, fraudulent practice, coercive
practice, undesirable practice or restrictive practice in the Bidding Process.
For the purposes of this Section 4 Fraud & Corrupt Practices, the following
terms shall have the meaning hereinafter respectively assigned to them:
II. Consult with any Bidder in order to receive clarification or further information;
III. Pre-qualify or not to pre-qualify any Bidder and/ or to consult with any
Bidder in order to receive clarification or further information;
IV. Retain any information and/ or evidence submitted to the Authority by,
on behalf of, and/ or in relation to any Bidder;
V. Independently verify, disqualify, reject and/ or accept any and all
submissions or other information and/ or evidence submitted by or on
behalf of any Bidder; and/or
6.3. It shall be deemed that by submitting the Bid, the Bidder agrees and
releases the Authority, its employees, agents and advisers,
irrevocably, unconditionally, fully and finally from any and all liability
for claims, losses, damages, costs, expenses or liabilities in any
way related to or arising from the exercise of any rights and/ or
performance of any obligations hereunder, pursuant hereto and/ or
in connection herewith and waives any and all rights and/ or claims
it may have in this respect, whether actual or contingent, whether
present or future.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
CHECKLIST OF SUBMISSIONS
Date:
Place:
To
Chief Engineer
Project Chetak
Village Bichhwal
Bikaner
Rajasthan 334006
Dear Sir,
7. I/ We declare that:
f. I/ We further confirm that we have not offered nor will offer any illegal
gratification in cash or kind to any person or agency in connection
with the instant Bid; and
8. I/ We understand that you may cancel the Bidding Process at any time
and that you are neither bound to accept any Bid that you may receive
nor to invite the Bidders to Bid for the Project, without incurring any
liability to the Bidders.
10. I/ We declare that we/ any Member of the Consortium, or our/ its
Associates are not a Member of a/any other Consortium applying for the
Bid
11. I/ We certify that in regard to matters other than security and integrity of the
country, we/ any Member of the Consortium or any of our/ their
Associates have not been convicted by a Court of Law or indicted or
adverse orders passed by a regulatory authority which could cast a
doubt on our ability to undertake the Project or which relates to a grave
offence that outrages the moral sense of the community.
14. I/ We further certify that we are qualified to submit a Bid in accordance with
the guidelines for qualification of Bidders seeking to acquire stakes in
Public Sector Enterprises through the process of disinvestment issued by
the GOI vide Department of Disinvestment OM No. 6/4/2001-DD-II
dated 13th July, 2001 which guidelines apply mutatis mutandis to the
Bidding Process. A copy of the aforesaid guidelines form part of the
RFP at Appendix-VI thereof.
16. I/We hereby submit the Statement of Legal Capacity as per format
provided at Annexure IV: Statement of Legal Capacity with this Letter
Comprising the Bid.
17. I/We hereby submit the Power of Attorney for signing of Bid and the
Power of Attorney for Lead Member of Consortium, as per format provided
at Appendix II: Format for Power of Attorney for signing of Bid and
Appendix III: Format for Power of Attorney for Lead Member of
Consortium respectively of the RFP, is also enclosed.
18. . I/ We, hereby irrevocably waive any right which we may have at any
stage at law or howsoever otherwise arising to challenge or question any
decision taken by the Authority in connection with the selection of
Bidders, selection of the Bidder, or in connection with the selection/
Bidding Process itself, in respect of the above mentioned Project and
the terms and implementation thereof.
19. I/We agree and undertake to abide by all the terms and conditions of the RFP
document.
20. I/We certify that in terms of the RFP, my/ our Financial Turnover is Rs.
(Rs. in words) and Net worth is INR…………………………. (INR. in
words) and meet the Eligibility Criteria as mentioned in Clause 2.2.1 (A)
of this RFP document.
21. We agree and undertake to be jointly and severally liable for all the
obligations of the Concessionaire under the Concession Agreement till
occurrence of Financial Close in accordance with the Concession
Agreement.
In witness thereof, I/We submit this Bid under and in accordance with the
terms of the RFP. Yours faithfully,
1.
(a) Name:
(b) Country of incorporation/ registration:
(c) Address of the
Corporate
Headquarters and its
Branch Office(s), if any,
in India:
(d) Date of Incorporation
and/ or Commencement
of Business:
(a) Name:
(b) Designation:
(c) Entity:
(d) Address:
(a) Name:
(b) Designation:
(c) Address:
5. In case of a Consortium:
(a) The information above (1-4) should be provided for all the
members of the Consortium.
(b) A copy of the Joint Bidding Agreement, as envisaged in Clause
2.2.4 should be attached to the Bid.
(d) The following information shall also be provided for each member
of the Consortium:
Name of Bidder /member of Consortium
Format for
DEVELOPMENT EXPERIENCE
Project Project Project Date of Proof of Project Cost and
Name Location Cost in Completion Completion Enclosed
INR of the Project (Yes/No)
Note:
Provide details of only those projects that have been undertaken by the Bidder
under its own name and/ or by an Associate and/ or Consortium Member in
case of Consortium.
Signature
Name
Designation
Entity
Date
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
(B)
Format for
2.
3.
……
Note:
Provide details of only those projects that have been undertaken by the Bidder
under its own name and/ or by an Associate and/ or Consortium Member in case
of Consortium.
Name
Designation
Entity
Date
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Annexure III: Financial Capacity of
Bidder
Operating
Revenue
(add)
Other
Revenu
e
Total
Turnover
2. Net Worth related data for the preceding financial year
All figures in INR Cr
Description Amount ( in INR Cr.)
Subscribed Share
Capital
a. "Net Worth" for company shall mean the aggregate value of the
paid-up share capital and all reserves created out of profits of the
company and securities premium account after deducting
aggregate value of the accumulated losses, deferred expenditure
and miscellaneous expenditure not written off, as per the audited
balance sheet, but does not include reserves created out of
revaluation of assets, write-back of depreciation and
amalgamation.
b. Net Worth for Partnership Firm would mean: [Fixed Assets
+Trade Receivables + Current Assets] – [Firms Loan +Current
Liabilities]
c. Net Worth for Sole Proprietorship would mean: Total Assets- Total
Liabilities
Signature………………..
Name: …………………………
Designation: ………………….
Name of Bidder: ……………...
Stamp/ seal: …………………...
Date: …………………………...
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Ref.
Date:
To
Dear Sir,
We have agreed that (insert member’s name) will act as the Lead
Member of our Consortium. *
Thanking you,
Yours faithfully,
Dated:
To
B.G. No.
2. Any such written demand made by the Authority stating that the Bidder is
in default of the due and faithful fulfillment and compliance with the terms
and conditions contained in the Bidding Documents shall be final,
conclusive and binding on the Bank.
4. This Guarantee shall be irrevocable and remain in full force for a period
of 180 (one hundred and eighty) days from the Bid Due Date inclusive of
a claim period of 60 (sixty) days or for such extended period as may be
mutually agreed between the Authority and the Bidder, and agreed to by
the Bank, and shall continue to be enforceable till all amounts under
this Guarantee have been paid.
5. We, the Bank, further agree that the Authority shall be the sole judge to
decide as to whether the Bidder is in default of due and faithful
fulfillment and compliance with the terms and conditions contained in the
Bidding Documents including, inter alia, the failure of the Bidder to keep
its Bid open during the Bid Validity Period set forth in the said Bidding
Documents, and the decision of the Authority that the Bidder is in
default as aforesaid shall be final and binding on us, notwithstanding
any differences between the Authority and the Bidder or any dispute
pending before any Court, Tribunal, Arbitrator or any other authority.
9. It shall not be necessary for the Authority to proceed against the said
Bidder before proceeding against the Bank and the guarantee herein
contained shall be enforceable against the Bank, notwithstanding any
other security which the Authority may have obtained from the said
Bidder or any other person and which shall, at the time when
proceedings are taken against the Bank hereunder, be outstanding
or unrealized.
10. We, the Bank, further undertake not to revoke this Guarantee during
its currency except with the previous express consent of the
Authority in writing.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
11. The Bank declares that it has power to issue this Guarantee and
discharge the obligations contemplated herein, the undersigned is
duly authorised and has full power to execute this Guarantee for
and on behalf of the Bank.
12. For the avoidance of doubt, the Bank’s liability under this
Guarantee shall be restricted to INR. ………Crores (Rupees
……………….......... Crores only). The Bank shall be liable to pay
the said amount or any part thereof only if the Authority serves a
written claim on the Bank in accordance with paragraph 9 hereof,
on or before [……. (indicate date falling 180 (one hundred and
eighty) days after the Bid Due Date)].
(Official Seal)
____________________________________________________________________
1 Delete reference to Consortium if not applicable
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
APPENDIX III: FORMAT FOR POWER OF ATTORNEY FOR SIGNING
OF BID
(On a Non-Judicial Stamp Paper of appropriate value)
POWER OF ATTORNEY
Witnesses:
address)
1.[Notarized]
(Signature)
[Link]
(Signature)
(Name, Title and Address of the
Attorney)
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Note:
• To be executed by the sole Bidder or the Lead Member in case of a
Consortium as the case may be.
•Also, wherever required, the Bidder should submit for verification the extract
of the charter documents and documents such as a resolution/ power of
attorney in favor of the person executing this Power of Attorney for the
delegation of power hereunder on behalf of the Bidder.
• For a Power of Attorney executed and issued overseas, the document will
also have to be legalized by the Indian Embassy and notarized in the
jurisdiction where the Power of Attorney is being issued. However, the Power
of Attorney provided by Bidders from countries that have signed the Hague
Legislation Convention 1961 are not required to be legalized by the Indian
Embassy if it carries conforming Apostille certificate.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
APPENDIX IV: FORMAT FOR POWER OF ATTORNEY FOR LEAD
MEMBER OF CONSORTIUM
(On a Non-Judicial Stamp Paper of appropriate value)
POWER OF ATTORNEY
AND hereby agree to ratify and confirm and do hereby ratify and confirm all
acts, deeds and things lawfully done or caused to be done by our said
Attorney pursuant to and in exercise of the powers conferred by this Power of
Attorney and that all acts, deeds and things done by our said Attorney in
exercise of the powers hereby conferred shall and shall always be deemed to
have been done by us/ Consortium.
For
(Signature)
(Signature)
For
(Signature)
(Executants)
Notes:
THIS JOINT BIDDING AGREEMENT is entered into on this the ………… day of
AND
AND
The above mentioned parties of the FIRST, SECOND and THIRD PART
are collectively referred to as the “Parties” and each is individually
referred to as a “Party”.
WHEREAS,
2Please elect the correct option as per the nature and form of the entity. 3Please elect
the correct option as per the nature and form of the entity. 4Please elect the correct
option as per the nature and form of the entity.
A. The Parties are interested in jointly bidding for the Project as members of
a Consortium and in accordance with the terms and conditions of the
RFP document and other bid documents in respect of the Project, and
2. Consortium
The Parties do hereby irrevocably constitute a consortium (the
“Consortium”) for the purposes of jointly participating in the Bidding
Process for the Project. The Parties hereby undertake to participate in
the Bidding Process only through this Consortium and not individually
and/ or through any other consortium constituted for this Project, either
directly or indirectly or through any of their Associates.
3. Covenants
The Parties hereby undertake that in the event the Consortium is
declared as the Selected Bidder and awarded the Project, it shall
incorporate a Special Purpose Vehicle (the “SPV”) under the Indian
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Companies Act, 2013 for entering into a Concession Agreement with the
Authority and for performing all its obligations as the Concessionaire in
terms of the Concession Agreement for the Project.
b. Party of the Second Part shall be the ------ Member of the Consortium
c. Party of the Third Part shall be the ----------- Member of the Consortium;
and
The Party of the First Part (Lead Member) shall be responsible for:
i.
ii.
(i)
(ii)
First Party:
• Second Party:
• Third Party:
d. The Parties undertake that they shall comply with all equity lock-in
requirements set forth in the RFP, RFP and more particularly the
Concession Agreement.
Each Party represents to the other Parties as of the date of this Agreement that:
ii. violate any Applicable Law presently in effect and having applicability to it;
c) This Agreement is the legal and binding obligation of such Party, enforceable
in accordance with its terms against it; and
This Agreement shall be effective from the date hereof and shall continue in full
force and effect until the fifth anniversary of the date of commercial operations
of the Project is achieved under and in accordance with the Concession
Agreement, in case the Project is awarded to the Consortium. However, in
case the Consortium is either not prequalified for the Project or does not get
selected for award of the Project, the Agreement will stand terminated in case the
Bidder is not pre-qualified or upon return of the Bid Security by the Authority to
the Bidder, as the case may be.
9. Miscellaneous
c) The Parties acknowledge and accept that this Agreement shall not be
amended by the Parties without the prior written consent of the
Authority.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
(Designation)
(Address)
Notes:
1. The mode of the execution of the Joint Bidding Agreement should be in accordance
with the
procedure, if any, laid down by the Applicable Law and the charter
documents of the executant(s) and when it is so required, the same should
be under common seal affixed in accordance with the required procedure.
[Link] Joint Bidding Agreement should attach a copy of the extract of the
charter documents and documents such as Resolution / Power of Attorney in
favor of the person executing this Agreement for the delegation of power and
authority to execute this Agreement on behalf of the Consortium Member.
Department of Disinvestment
Block 14, CGO Complex
New Delhi. Dated
13 July 2001.
OFFICE MEMORANDUM
a. In regard to matters other than the security and integrity of the country, any
conviction by a Court of Law or indictment/ adverse order by a regulatory
authority that casts a doubt on the ability of the bidder to manage the
public sector unit when it is disinvested, or which relates to a grave
offence would constitute disqualification. Grave offence is defined to be of
such a nature that it outrages the moral sense of the community. The
decision in regard to the nature of the offence would be taken on case to
case basis after considering the facts of the case and relevant legal
principles, by the Government of India.
c. In both (a) and (b), disqualification shall continue for a period that
Government deems appropriate.
e. The disqualification criteria would come into effect immediately and would
apply to all bidders for various disinvestment transactions, which have not
been completed as yet.
sd/
- (A.K.
Tewari)
Under Secretary to the Government of India
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
APPENDIX VII: SELF UNDERTAKING
(On Letter Head of the Bidder/All the members in Case of a Consortium)
Ref.
Date:
To
The Director General
Chief Engineer
Project Chetak
Village Bichhwal
Bikaner
Rajasthan 334006
Dear Sir/Madam,
I/We (Name of the Bidder) hereby take that I/We (Name of the Bidder) have
not been debarred/blacklisted/terminated by any Central Government/ State
Government/ Statutory Authority or Public Sector Undertaking (PSU).
Yours faithfully
(Signature, name and designation of the authorized signatory)
and
3. Financial Capacity:
ii. The Bidder shall have a minimum Net Worth of Rs. 9 Lakh
(Rupees Nine Lakh only) at the closing of the preceding Financial
Year before the Bid Due Date
Subscribed
Share
Capital
(add) Paid up
Share
Capital
(add) Free
Reserves
(Subtract)
(Revaluation
reserves +
Miscellaneous
Expenditure+
Expenditure
not written off+
accrued
liabilities)
Net-worth
* Details of the items included in the non-cash expenses have to be
provided.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
APPENDIX IX (A): FINANCIAL
PROPOSAL
Covering Letter
Date:
Place:
To
The Director General
Chief Engineer
Project Chetak
Village Bichhwal
Bikaner
Rajasthan 334006
Dear Sir/Madam,
I/We agree that this offer shall remain valid for a period of 180 (One Hundred
and Eighty) days from the Proposal Due Date or such further period as may be
mutually agreed upon.
Yours faithfully,
Authorized Signature:
Name: …………………………….
Designation ……………………….
Name of firm: …
Address………………………
Note:
1. GST shall be paid separately as per prevailing rate and the same is not
required to indicated in Financial Proposal
SCHEDULE - I
SCHEDULE - II
The facilities shall broadly have the amenities as described in Annexure-C and Annexure-D.
Major components of the work/scope of work are as under:
c) Operation and maintenance of all facilities in the BRO Cafe at Demised Land
in accordance with the provisions of this lease agreement;
Annexure-A
List of sites where BRO Cafeare to be developed.
List of sites
Annexure-B
E-tender procedure
1.1. It is mandatory for all the Bidders to have class-III Digital Signature Certificate
(DSC) (in the name of Authorized Signatory / Firm or Organization / Owner of
the Firm or organization) from any of the licensed Certifying Agency (Bidders can
see the list of licensed CAs from the link [Link]) to participate in e-
tendering of the Lessor.
DSC should be in the name of the authorized signatory as authorized in
Appendix III of this RFP. It should be in corporate capacity (that is in Bidder
capacity / in case of Consortium in the Lead Member capacity, as applicable).
The Bidder shall submit document in support of the class III DSC.
The Authorized Signatory holding Power of Attorney shall only be the Digital
Signatory. In case Authorized Signatory holding Power of Attorney and Digital
Signatory are not the same, the BID shall be considered non-responsive.
1.2. To participate in the bidding, it is mandatory for the Bidders to get registered
their firm / Consortium with e-procurement portal of the Lessor
[Link] which is free of cost. Following may kindly be noted:
1.3. If the firm / Consortium is already registered with e-tendering service provider of
the Lessor, and validity of registration is not expired the firm / Consortium is not
required a fresh registration.
1.4. The complete Bid document can be viewed / downloaded by the Bidder from e-
procurement portal of the Lessor [Link] from ____ to
__________ (upto 1700Hrs. IST).
128
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Annexure-C
List of mandatory facilities
Facility
High Mast Lights
Landscaping
Toilet facility (separate for ladies, gents & Divyang with appropriate ramp and railing),
dustbin
Drinking Water
Wet Canteen
First Aid Room
Medical clinic
Car/Bus Parking
Similar details for each BRO Café location as per the list for bal 74 locs
129
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Annexure-D
List of permissible facilities
S.
Permissible Facilities in BRO Cafe
No.
1 Food court/restaurants
2 Dhabhas for truckers
3 Retail Arcade (Convenience Store, shops)
4 Tourist information kiosk
5 Village Haat
6 Motel/Rooms for short stay
7 Dormitory for drivers
8 Open air rest area with benches and tables
9 Self-laundry and cooking facility for truckers
10 Fuel station (along with air filling station,
puncture
repair & pollution check)
11 Vehicle repair shop
12 Car washing
Spare parts shop
13
14 First aid box
15 Internet Facility
16 ATM/ Bank
17 Emergency telephone connection*
18 Smoking zone
19
20
21
22
23
24
25
26
130
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Annexure-E
131
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Annexure-F
Facilities must have a minimum of the amenities as per Annexure-C: The facilities shall
be developed as per following guidelines:
a) Traffic Safety: Design of all circulation routes and parking areas should
reflect good traffic engineering design practice to enhance the safety of users
during circulation and parking.
a) For one-way truck/trailer (access only): 4.0 m (movement into and out of
parking bays as per turning radii requirement of vehicles)
b) For two-way truck/trailer (access only): 8.0 m (movement into and out of
parking bays as per turning radii requirement of vehicles)
c) Recommended minimum radius: 22 m; turning radius should be based on
vehicles to be accommodated
d) Vehicles should circulate in a clockwise direction, making right hand turns,
permitting driver to see rear of unit when backing into parking space.
132
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
public used areas. Such screening should not create a security problem.
d) Lighting should support evening use and enhance safety.
The landscape/ site should respect existing attributes of the site while responding to the
context created by surrounding areas and facilities. One of the priorities thus must be to
design green spaces in an equitable way. Durable hard landscape materials, street
furniture, signage, and other features which can withstand wear, abuse, and vandalism
shall be used.
3. Topography
The existing topography of the site should be an important consideration in the design
of the highway facility. Significant natural landforms and drainage features such as
hilltops and drainage channels within or next to the site should be preserved where
possible.
a) Way finding and Space Articulation: Such as defining roads and paths with
tree rows; accentuating entry points and drop-off with plants having
interesting form, colour, or texture.
c) Traffic Control: Plants should be used to direct people through the site in a
definite desired pattern or direction, and also as vehicle barriers.
134
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
d) Glare and Reflection Control: A judicious balance between hard and soft
paved areas can minimize glare and reflection.
e) Solar Radiation Control: Plants can be used to filter or completely block out
the incident sun. Single or groups of plants can be used to control direct solar
radiation by shading the sun, or to intercept radiation reflected from hard
surfaces. Mix evergreen and deciduous planting to achieve summer shading
and winter solar access. Keeping paved areas to a minimum and increasing
vegetative cover (including large areas of ground cover -not limited to lawns)
reduces direct as well as reflected solar heat gain.
135
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
6. Landscape Furniture
Site furniture (response to site character) should be placed, where required, for the
comfort, convenience, information, circulation, control, protection and enjoyment of
users. Landscape/Street furniture may include the following elements:
a) Seating, Bollards, Kiosks, News Racks and Vending Machines
b) Light Standards, Landscape Pottery and Sculpture
c) Trash and Recycling Containers
d) Signage
136
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
C. Lighting
All facilities should have proper lighting arrangement in ventilation system. The
specification should be in line with good industry practice.
137
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Outdoor parking lots and their pedestrian links should be provided with a
"mini-mum maintained on the floor surface" of 16 lux of light on the parking
and 27 lux walkway surface during hours of darkness.
138
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
D. Fire
a) Provide smoke detectors for all areas
b) Clearly mark all exits
c) Provide sprinkler system in kitchen and all high-risk areas
d) Install firefighting devices as per local fire norms
e) Provide fire tank as per local norms
For execution, the specifications shall be borrowed from relevant MES/ CPWD
permanent building specifications duly complying the relevant BIS Codal
provisions and IRC stipulations if available. However, the new or modified
specifications shall be required to be approved by NHAI before incorporating the
same in execution.
139
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
b) The number of chairs / Beds / Table etc., shall not be less than the capacity
indicated in the relevant schedules. Mismatch of tables and chairs is not
permitted. The condition and quality of materials used shall be suitable such
that the furniture continues to be of meticulous condition, without evidence of
any wear and tear
c) Scope of work under furniture and fittings includes but not limited to the following:
i) Tables, luggage, beds, clothes storage, seating, etc.
ii) Soft furniture including, mattress, pillows, curtains, cushions etc.
iii) Fittings such as mirrors, light fittings, heating appliances, light shades etc.
Table 1
Food Court
Finished with polished Granite Slab (18mm thick) / Acrylic Polymer or similar
materials.
Tabletop with polished granite slabs or Acrylic polymer slabs or similar
materials supported by stainless steel frame / pedestal or with similar
materials.
Modular chairs with legs of stainless steel or similar materials.
Conference Hall
Polished fittings wooden sofas / veneer with top and bottom Melamine
finish or Factory-made modular conference table.
Revolving Chairs with arms
Shall conform to minimum standards specified under the food court.
However, a higher standard of furniture and fittings to match the
branding standards of the operator is permitted
Rooms
The furniture for rooms shall include the following
Twin Writing
Bed Mini Bar Table Luggag
Easy Chair Side
(900x1800 (800x600 (1200x60 e
Tables
) ) 0) Rack
Double Bed
(1800x180
0)
140
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
141
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Annexure G
9. Maintenance
The general cleaning should be divided into spot and thorough cleaning.
Spot cleaning refers to the process whereby only specific areas are cleaned,
Thorough cleaning refers to the cleaning of the entire restroom and is
usually carried out once a day. The sequence of cleaning should follow this
checklist:
1.7. Training
143
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
Toilet operators who engage cleaning labour / staff for toilet cleaning should
specify in their contract a performance-based outcome rather than
headcount-based outcome. The performance- based contract should also
stipulate a requirement for trained cleaners.
Having public education messages in the toilets can help persuade users to
do their part in keeping toilets clean. And other social message help to
commuters as well-maintained hygienic conditions as well as comfort to all.
Having public education messages in the toilets can help persuade users to
do their part in keeping toilets clean.
(a) attended to
(b) assimilated
(c) remembered (for future action)
(c) All the signage shall be preferably in Stainless Steel Plate for the following
information:
Hand Dryers, Gents Toilet, Ladies Toilet, Toilet for Divyang, Dustbin, No
144
Smoking area, Water ATM.
Development, Operation and Maintenance of BRO Cafe through PPP mode onDesign, Build, Finance, Operate and
Transfer (DBFOT) basis
(d) Social Message ‘keep the Toilet Clean’, ‘Save Water’ ‘Use Dustbin’
‘Don’t Spit’ ‘Wash your Hand’ etc.
(e) Totem board (LED Lit) near each PTU as per approved design /
specification and as per feasibility.
11. Message Design
The message shall be readable for people readily attend to visuals. This
makes the use of visuals an important part of the design of the message.
Generally, visuals should be
(a) Simple and uncluttered
(b) Attractive
(c ) Eye-catching
The language of public education has to be kept simple. This helps ensure
that the message reaches all regardless of their educational level. It also
ensures that the message is attended to, understood and remembered for
future action.
(i) Jargon, big words and long sentences should be avoided.
(ii) Slogans can be very effective because they are short, catchy
and easy to remember.
12. Message Placement
The usual means of message placement in public toilets are posters and
stickers. To maximize the effectiveness of the message, the right medium
and manner of displace should be selected.
The main purpose of user education is to address specific behavioral
concerns such as littering, careless aiming or the flinging of water
everywhere
The message should be placed strategically at the spot where the problem
behavior occurs. For example: on the wall above the urinal – to encourage
better aiming; At the wash basin area – to discourage flinging of water
everywhere. Posters can be used to convey generic messages such as
“Help Keep This Toilet Clean and Nice”.
145