Two Storey Admin Building Extension

The document describes design requirements and objectives for a two-story administration extension building for the Department of Education in Baguio, Philippines. The new building will house the Purchasing and Engineering Departments to address overcrowding. The ground floor will include office spaces, storage areas, a workshop, and docking platform. The second floor will contain more office spaces. The building should have a uniform design to the existing building and use local materials like Baguio stone.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
974 views4 pages

Two Storey Admin Building Extension

The document describes design requirements and objectives for a two-story administration extension building for the Department of Education in Baguio, Philippines. The new building will house the Purchasing and Engineering Departments to address overcrowding. The ground floor will include office spaces, storage areas, a workshop, and docking platform. The second floor will contain more office spaces. The building should have a uniform design to the existing building and use local materials like Baguio stone.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

TWO STOREY ADMINISTRATION EXTENSION BUILDING

The Department of Education (DepEd), as an integral part of the rehabilitation of the


Baguio Teachers Camp has commissioned a RLA to design and manage the construction of the
admin extension building. The new building will house Purchasing Department and Engineering
Department to address the overcrowding in the existing admin building. The two department
office area will be located at the 2nd floor while the locker room/T&B are to be located for the
end users to enjoy the cold climate and scenery of the camp.

Design Requirements
1. A Business Center – 168sq.m, a lobby and a stair of 60sq.m and a storage 1 of
120sq.m will all together be located at GF, right corner of lot. The 3 areas will have a
total width of 30m compose of 12m width business center, 6m width of lobby stair
and what remains is the width of the storage 1. The business center will occupy the
right corner with 6m width x 14 length deck on the right side, and the other deck in
front measuring 18m x 10m to join the side deck. The lobby will also have a deck of
6.0m x 10.0m. Both front and side open decks are accessible by stairs/steps. Storage
1 will contain the beddings, linen and the like as well as office supplies, a
concessionaire will operate the business center.

2. The Storage 2 will be a 300sq.m, with a width of 15m width min. setback and is
attached to storage 1. The storage 2 will contain construction materials such as
cement, lumber, plywood, paints, and the like. This spacer is under the management
and control of the purchasing department.

3. The last enclosed space at the G.F, is the workshop for use of the engineering
department; its size will have a width of 4.0m x 8.0sq.m and is aligned to storage 2.
The workshop will contain a locker room with T&B/ shower with area of 60sq.m. The
workshop will be constructed fire rated partition walls.

4. The back portion of the workshop, storage 1, storage 2, and lobby is where the
docking/delivery platform is attached. The platform measures 4m width 73m length.
Ramp and stair are integrated in the platform.

5. A rear driveway, loading/ unloading area, parking spaces, multipurpose open space
will occupy the measuring 24m x 105m.

6. Right after workshop is a softscape space of 3.0m x 72sq.m


7. A driveway will be provided with width of 6.0m to connect the rear open space to
the main road.

8. The front and side setback will be dedicated for softscape/garden.

9. The second floor will contain the stair and stairwell of the same size as the ground
lobby/stair. It also contains the engineering department office of the same size as
the business center which is exactly region it. Likewise, the purchasing department
office which of the same size as the storage 1.

10. A balcony for 2 offices will be provided with open deck 4 x 16m.

Design Objectives:
The new building should have a design character uniform to that to the existing
administration building being the its extension. The use of local materials, Baguio stone, as
finishing material is encouraged. The building should be provided with wide windows for the
ample ventilation since the building will not be equipped with artificial ventilation or AC. The
front and side softscape be in the same level as the main road to avoid rain water ponding.

The Site
The project site is a small camp of a big camp, BIR. The site assigned is at the left corner
of the main road (teacher’s camp) and secondary road, the first road from the Leonard Wood
road except that the land is bounded in the south by the main road and in the east bounded by
the secondary road. The rear and the left side is technically limitless, the camp being a large
campus like environment east of downtown Baguio. RLA is required to determine and report
the final lot area to be used after it has satisfy the space required of DepEd-BTC. It is assumed
that main and secondary roads are perpendicular to each other. The camp is declared as Group
C – Education and Recreation, Division C – other types of government buildings and a zoning
classification of G.I (Gen. Institution). The office of the building official of Baguio declared the
groupings and zoning classification of this site. The site is sloping downward at 3% from the
main street, sidewalk towards the rear part of the site. The front right corner is the east is the
same level as the main street sidewalk. The secondary street and its sidewalk are sloping just
like the lot towards the rea. It must be noted that the entire camp is provided with buildings
including this project. The front and right side setback will be 5.0m while rear and left sides are
to comply with minimum setback.
Public utilities such as water, sewage and electric are all in placed in the camp and are
accessible by the building project.
105

MULTIPURPOSE
AREA/PARKING/LOADING
&UNLOADING/REAR
24

DRIVEWAY
6 3 40 15 30 6 5
73
12 6 12

P L A T F O R M
3% SLOPE

4
53

D R I V E W A Y

SIDE SETBACK

D
S P A C E

STORAGE [Link]. SIDE

A
14
LOCKER
DECK
&
168SQ.M.

10
T&B
WORKSHOP STORAGE 1 LOBBY 6X14M

R O
60SQ.M.
24

(120SQM)
S O F T S C A P E

800SQM 2
20

40M X 20M 300SQM LOBBY FRONT


DECK DECK

10
15M X 20M 6X10M 18X10M

Y
R
6 18
F R O N T S E T B A C K
5

N D A
M A I N R O A D

O
C
S E
2 STOREY ADMINISTRATION BUILDING EXTENSION
LAYOUT BY AR. RAFAEL GATUS
PAGE 1 OF 2
30
18 12

OPEN
DECK FOR 2 OFFICES

4
4X18M ENGINEERING
DEPT
OFFICEE

14
PURCHASING
DEPT OFFICE STAIRWELL

10
(SAME AS
(SAME AS
STORAGE 1) [Link])

12 6 12

S E C O N D F L O O R

2 STOREY ADMINISTRATION BUILDING EXTENSION


LAYOUT BY AR. RAFAEL GATUS
PAGE 2 OF 2