'l1ffif ~ (GOVERNMENT OF INDIA)
tC1 ~ (MINISTRY OF RAILWAYS)
tc1c) <1M (RAILWAY BOARD)
>io.2004/RE/161/l Pt-III(ACTM) ~ ~, ~o.C)3.c5"·.2005
The General Manager (Elec)
All Indian Railways including
Metro Railway/Kolkata.
CORE/Allahabad,
ICF, Chennai,
CLW, Chittaranjan,
RCF Kapurthala
The Chief Administrative Officer,
Metro Railwayat Delhi, Mumbai and Chennai.
, Director, IRIEEN, Nasik and Director, Indian Railway Centre [or Advance
Maintenance Technology, Gwalior.
Principal, Railway Staff College, Vadodara
-The Director General, (Tl/Electrical Standards/PS & EMU)
"imSO/Alambagll; Lucknow
, , CliiefCommissibner of Railway Safety, Lucknow,
CRSlNorthern Circle/Central Circle/Eastern Circle/Southern Circle/
'Solith .Central Circle/South Eastern Circle/Western Circle.
/ ',C Sub: Advance Correction Slip No. 12 to Railways Manual of AC Tr-action
, ',' ,(ACTM) Vol.lI Pt.I, 1994. Details regarding - Temporary Speed
, Restrictions and inclusion of additional proformas in conformity with
Railways (Opening of Public Carriage of Passengers) Rules 2000.
" Ref: CCRS letters No. S-1901S/1!2003-TW dt. 02.05.03 & 13.02.03.
Commission or Railway Safety vide letters No. S-19015/1 /200J-TW ,;,. :;::,05.03
. & 13'.02,03 had raised the issue of non-availability of any criteria for speed restriction
during the provision of temporary OHE mast in electrified sections and documents to be
submitted to the Commissioner of Railway Safety prior to opening the line [or electric
tractiOl\ according to Railways (Opening of Public Carriage of Passengers) Rules 2000, It
is decided to include an additional Para 20830(a) regarding temporary speed restrictions,
enclosed as Annex-I (I sheet), and modify Item 2 of Para 21009 regarding additional
proformas, enclosedas Annex-If (8 sheets) as Correction Slip No, 12 dt. 281h April 2005
in the ACTM Vol.ll.
Receipt of the letter may please be acknowledged.
"Hindi Version will follow .
.•..
(1\ chtab Singh)
Executive Director/Railway E ectrificatlol1
Railway Board
DA:.2 Sheets
,!--
-2- i
1"o.2004/RE/16l11 Pt-llI(ACTlvl)
I-~
'j~ ~, ~o. 2R.04.2005
Copy (0: - eR13,!viE, Ml., MS, MM, MT, FC, Secretary
:1---""1
!
1_-
AM(L), ~M(CE), AlvI(W), AJ"f(B), AM(T)," Mvl(Fin), /\M(Sig.). 1\1\.1(l'lg.), l'dvl(iv1S). :'i
Alv[(Mcctl), AM(l'U), AI'v1(f cic), i\([v.(Vig). !\dv(L&!\), "
"
:"j"--
~[)EE(!ZS),. EDEE(G), EDEE(Dcv),
IYj'Y':)-1 \ L':J)(SHI~~}\ ED(Works), EDCE(P'.
,
LD(J 10J), ED(MD), eDl K(M), rm
K(1\1C), EDTK(P), EDCE(G), EDCE(B&S) )
~
I',
~1
CEE(G), DEE(RS), DEE(l'S), DEE(G)
·1----
'\
A II Ii i!.\'III'l!.{
"fu.2004/REI161/l Pl-III(ACTM)
Indian Railways Manual of AC Traction Volume II I'Ll
i 1994 Edition ,
Advance Correction Slip No.12 Dated 28th April, 2005
The following may be added as a new item (a) in the existing Para 20830
Vol. II (Para I)
PaI'a 20830(a)- Temporal>' Speed Restrictions
The instructions regarding sped restriction, in electri fled sections are being
notified under GR-17.09. The temporary speed restrictions shall be imposed by
Electrical(TRD) Deptt, as per GR-4.09 wherein a caution order shall be banded
over to driver at the stopping station immediately short of the place where such
precautions are necessary. While imposing temporary speed restrictions, the
following guidelines shall generally be followed: -
(i) Whenever temporary mast is provided, speed restriction of about 15-40 krnph is
imposed: depending upon the site conditions. Then the new mast is provided, the
;. foundation of which takes about 5/6 days for curing and after that only OHE is
shifted to the new mast. -Total time taken in this process is about 10 days from
the date-of imposition of speed restriction depending upon the availability of
blocks. ' :
"',.~
Whenever mast gets bent due to.accidents etc. same is straightened using trifor.
Speed restriction of about' 30-60 krnph is imposed depending upon site
conditions/stagger profile. Bent is removed during next 3-4 days depending upon
.. the availability of blocks.
, (iii), Whenever there is extensive damage to 0[-1E due to Pan to entanglement etc. but
, not affecting the masts, or-IE is attended by using temporary droppers etc. and
speed restrictions of about 30-60 kmph is imposed depending upon site
conditions and restoration of sectional speed takes about 4 days depending upon
.
the extejit of damage and block availability .
't
**>!<>i<*********
.I:
Annexure-It
",,!o.2004/RE/l 61/1 Pt-Ilf(ACTM)
hullun Railways Manual or
At 'I'ructiou Vulume U I'Ll
1994 Edition
Advance Correction Slip No.12 Dated 28th April, 2005
(The following may be replaced in the existing item 2 of Para 2 1009)
Item 2 of Para 21009
(i) General Safdy Cerlil'icnle or Works signed by CGE and CSTE of the
Construction Organization, as Profonna-lO.19/1.
(ii) Safety Certificate for Electrical Works 1O be signed by the CEE of
Open Line and CPM/CEElDy.CEE of Construction Organisation, as
Proforma-IO.20.
(iii) Certificate regarding Electric Rolling Stock to be signed by the CEE,
CME, COM & CE of the Open Line Railways, as Proforma-IO.2I.
(iv) Certificate of Open Line officers and the knowledge of their staff
regarding safety rules for electrified sections, Existing Proforma-
10.05. It is also countersigned by DRM.
(v) Copies of station working rules, traction working rules and diagrams,
which have been distributed to various Station Managers.
(vi) Brief particulars of traction installations (Form X), as Proforma-
10.22.
(vii) Power supply installation abstract (Form XI), as Profurma-Itl.Z'I.
(viii) Traction Maintenance Depot abstract (Form XII), as Proforma-I 0.24.
(ix) Restricted OEE clearance abstract (Form Xlll), as Proforma-IO.2S.
(x) Electrical Crossing over railway track: abstract (Form XIV) as
Proforma-Ifl.Zo.
(xi) The layout plan of the section or list of Implantation of fixed
structures, where implantation is less than specified, alongside the
track.
(xii) The approval forenergisetion of HT installations mentioned including
OHE issued by Electrical Inspector to Govt. of india
Enclosed: 8 fO. sheets
*************
ProfOioma-lOo19/1
FORM XV - I, XVI & xvn
(See rule 5(3 - 42,43 & 59), 5(4), 5(5) and Chapter VII of the Railways Opening 1'0,0 Public
Ca rriagc of Passengers Rules, 2000)
GICNERAL SAFETY CI~RTIFICi\TE
(As pel sub Pam 2(a) or Para 21009 of ACTM)
o
Description of Work:
f-
SECTION
t- .::...FROM
'---E CHAINAG_E__ --=--=- __
TO
==i
~
We do hereby certify that in the work mentioned above: -
i) There is no infringement to the schedule of dimensions due to OHE/signal structures
(or the sanction of Railway Board regarding infringement of schedule of dimensions
due to ONE/Signalling structures has been obtained, as the case may be).
Infringement of maximum and minimum dimensions (Form XVII) Rule 5(5)0
SN Location Name of Prescribed Existing Amount of Particulars
(Divn, structures maximum actual infringement of sanctions
section which and dimensions to
and Kms.) infringe I minimum infringement
I dimensions. and
Remarks
_._--L-
ii) All the works have been carried out in accordance with the standard drawings,
designs and specifications.
iii) Masts/structures
'"
are such as per prescribed norms.
.s
iv) The signalling/interlocking/block signalling has been carried out in accordance with
signaling and interlocking plan and the requirement laid down in the manuals or
instructions for the installation and maintenance of signalling, interlocking and block-
signalling apparatus have been fully complied with.
v) The work has been carried out in accordance with the provisions of the AC Traction
Manual.
We hereby certify that the section has been carefully inspected and tested. It is also certified
that the above work h,as been properly completed and is in good working order. The work
can be opened for public carriage of passengers and goods traffic without endangering the
safety of the traveling public or of the employees of the Railways.
CEE (Const.) CSTE (Const)
OR Dy. CEE/RE Dy. CSTE/RE
Countersigned by CPM OR CEE (lncharge of Project)
Proforma-IO.20
FORMXV-2
(See rule 5(3)(59) and Chapter VUI of the Railways Opening Ior Public Carriage of
Passengers Rules, 2000)
CI£RTiFICATE FOR ELECTRICAL WORKS
(As per sub Para 2(b) of Para 21009 of ACTM)
SECTION CHAINAGE
FROM TO·
It is certified that: -
i) Adequate arrangements have been made to warn the public regarding the dangers of
coming in contact with Jive overhead equipment within the Railway premises.
ii) The design of steel structures of overhead equipment complies with the Indian
Electricity Rules. The wind pressure of : has been adopted for the section
and wind pressure of has been adopted at Bridges.
iii) Bonding of rails by means of mild steel flats has been done at various locations
-/ where public or Railway Staff come frequently in contact with the rails. Track
bonding is done in accordance with the "Code for Bonding & Earthing" as laid down
in the ACTM.
iv) All the traction structures and other structures to which the OEE is attached are also
bonded to the rails in accordance with the "Code for Bonding & Earthing" referred to
above.
v) The overhead lines "and, underground cables crossing the railway tracks are in
accordance with the "Regulations for Electrical crossings of Railway Track" and
the crossing plans as approved by Railways' Chief Electrical Engineer who is also
the Electrical Inspector for such installations.
vi) There are no Railway structures carrying 25 KV live conductor outside the Railways'
premises in the above section.
vii) The height gauges have been provided, so that no part of any road vehicle or its load
comes in contact with live overhead equipment and have adequate clearances, on
either side of Railway premises at level crossings.
viii) The height gauges are provided with Danger Boards and clearance above road level .
maintained as per ACTM.
ix) No unauthorized cables/wires are crossing the Railway tracks.
CPMORCEE Chief Electrical Engineer,
(lncharge of Proj ect) Open Line Railway
Proforma-lO.21
NORTHERN RAILWAY
JOINT SAFETY CERTIFICATE NO.SLCIBGI01l2004
Certified that it is safe t(~ run Class of locomotive, single or coupled, having maximum axle load at
the maximum speed and on the section given in the table below. The maximum permissible speed as certified by RDSO is given in
juxta position.
Class of Section KM. Existing Speed Reasons for Remarks
Proposed Maximum
locomotives Permissible
permissib permissible speed II restriction Speed
I
SN & speed of the (permanent restrictions
From To From To !e speed certified by RDSO
Drawing Nos. section &
(Kl\1PH) I (KMPH) in (KMPH)
Temporary)
(1) (2L (3) (4) (5) (6) I (7) (8) (9)~ (10) (11)
Q12)~
I
\'"' ,.>
( ) ( ) ( ) ( ) ( )
Chief Signal & Tclecom.Engg. Chief Operating Manager Chief Mechanical Engineer Chief Electrical Engineer Principal Chief Engine .r
Railway, Railway, Railway, Railway, Rnilwuy,
Profonmi-10.22
FORM X
(See nile 5(1)(j) of the Railways Opening for Public Carriage of Passengers Rules, 20(0)
BRIEF PARTICULARS OF TRl\.CTION INST ALLATlON
(Sample)
Section: Tundla-Delhi North Central Railway
Length 292RKM Gauge 1676 111m
I. Total track kms electrified section - 650
2. Brief particulars of traction system: -
The type of Over I-lead Equipment installed on main line of the section is of the simple
polygonal type with swiveling brackets having tensions in the conductors regulated
automatically. The tension in the catenary and contact wire is kept as 1000 kgf each. The
contact wire has been given a pre sag of 103 111mfor a span of 72 m (suitably reduced for
smaller spans). On secondary lines and yards, the Over Head Equipment is of fixed type
and unregulated. The contact wire is grooved hard drawn copper with 107 sq. 111m cross
section supported by means of copper droppers from catenary which is stranded (1912.10
rnm) with 65 sq. 111m cross section made up of cadmium copper having 80%
conductivity. The maximum wind pressure- for design of masts and foundation has been
taken kg/sqrn. Maximum sPJl1 adopted on main lines is- 63 m. The Over Head
Equipment has been designed for a maximum speed of 160 km/h,
The power supply is taken from UPSEB at a single point viz. Aligarh from where railways
run their own transmission lines, for feeding the Sub Stations located at Haihras, Khurja
and Sahibabad. At eci&:hof the sub stations two power transformers 12.5 MVA, 132/25
KV are installed, one of them acting as standby. Standard arrangement of having neutral
of normal/short PTFE type have been provided at the sectioning post between two sub
stations for separation of phases. For sectioning and isolating facilities, sub sectioning
and paralleling posts have been provided. All the switching operations at power supply
stations are remote controlled from a single remote control center located at Tundla, The
RCC/SCADA system has been provided by (Manufacturer) and is or
........... Type (Microprocessor/PC based). The same will be commissioned by
(Target date, if not commissioned at the time of making application to CRS).
CPM or CEE (Incharge of OR Chief Electrical Engineer/Const,
Project) Opcn Line Railway
Proforma-l0.23
FORM XI
(See rule 5(1)(k) of the Railways Opening for Public Carriage of Passengers Rules, 2000)
POWER SUPPLY INSTALLATION ABSTRACT
SECTION: RAILWAY
LENGTH: KM GAUGE: mm
SN Type of Switching Stations Total Location and Remarks
Nos Nearest Railway
Stations
1 2 3 4 5
1 Traction substation and feeding
stations
2 Sectioning and paralleling
station
3 Sub-sectioning and paralleling
stations !
4 Sub-sectioning stations
5 Booster transformer stations
- (List to be
attached)
6 L T Supply transformer stations (List to be
attached)
.
$
CPM or CEE (Inchargc of OR Chief Electrical Engincer/Const,
Project) Open Line Railway
P!·oforma-lO.24
FORMxn
(See rule 5(1)(1) of the Railways Opening for Public Carriage of Passengers Rules, 2000)
MAINTENANCE DEPOT ABSTRACT
SECTION: RAILWAY
LENGTH: k111 GAUGE: mm
SN Location Name of the nearest No.ofOBE Remarks
Railway stations and maintenance car
distance there from (tower wagon) and
emergency road
1 2 3
vehicles provided.
4
5---1
CPM or CEE (Incharge of OR Chief Electrical Engincer/Const,
Project) Open Line Railway
Profonna-l0.25
FORM XIII
( ee rule 5(1)(111) of the Railways Opening for Public Carriage of Passengers Rules, 2000)
RESTRICTED OHE CLEARANCE ABSTRACT
SECTION: RAIL\VAY:
LENGTH: km GAUGE: 111m
Overview Structure
~ Location of
Over line'
Type of
Structure
Clearance
from R.L. to
Height of
contact wire
Whether Catenary
is ancho redor
Minim Ulll static
Clearance
Remarks
.
f_
- tructure Bottom of below the Freely Running between 25 KV I
Structure structure Below/Above the Live Parts &
" Structure Earth
f; I 2 3 4 5 6 7 8
II
R. Location of OHE where specified (2.0 m) working clearance are not available
.
.-
1
t·
sx Location Type of nearest earthed Actual distance Remarks
part between live part -
and earth
) 2 3, 4 5
I
CPM or CEE (Inchargc of OR Chief Electrical Enginecr/Const,
Project) Open: Line Railway
I'l"Ofonna-10.26
FORM XIV
(See rule 5(1)(11) of the Railways Opening for Public Carriage of Passengers Rules, 2000)
ELECTRICAL CROSSING OVER ELECTRIFIED TRACKS ABSTRACT
SECTION: RAILWAY
LENGTH: k111 GAUGE mm
SN Location Brief Tech. Whether Owned Whether Remarks
Particulars with by clearance as
including Guards OR pel" the
voltage wlo Guards regulations for
I
Electrical
Crossing
available
1 2 3 4 5 6 7
Chief Electrical Engineer/Const,
CPM or CEE (Incharge of Project)
OR Open Line Railway