100% found this document useful (1 vote)
660 views13 pages

S.L.R. Bridge Design at Thotapalli Km 117.090

This document contains the design calculations for a drainage line road (DLR) bridge at chainage 117.090 km of the Right Main Canal of the Thotapalli Barrage Project from km 52.45 to 117.890. It includes calculations for the hydraulic particulars of the canal, scour depth, afflux, and design of the super structure, abutments, and wing walls. References drawings and design codes are also listed. The bridge is proposed to allow continuity of the Vizainagaram to Rajam road which crosses the canal.

Uploaded by

gurumurthy38
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
660 views13 pages

S.L.R. Bridge Design at Thotapalli Km 117.090

This document contains the design calculations for a drainage line road (DLR) bridge at chainage 117.090 km of the Right Main Canal of the Thotapalli Barrage Project from km 52.45 to 117.890. It includes calculations for the hydraulic particulars of the canal, scour depth, afflux, and design of the super structure, abutments, and wing walls. References drawings and design codes are also listed. The bridge is proposed to allow continuity of the Vizainagaram to Rajam road which crosses the canal.

Uploaded by

gurumurthy38
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

NAGARJUNA CONSTRUCTION COMPANY LTD.

DOCUMENT NO. DATE


PROJECT: Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of S.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

CONTENTS Page no.

1 Scope of work 3

2 References 3

3 S.L.R.Bridge Design 3

4.1 Hydraulic particulars of canal 4

4.2 Scour depth calculations 4

4.3 Afflux calculations 5

5 Design Of Super Structure 5

6 Design of Abutment 6-7

7 Design of wing wall 8 - 10


NAGARJUNA CONSTRUCTION COMPANY LTD.

DOCUMENT NO. DATE


PROJECT: Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of S.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

1 Scope of work
This report contains the design calculations for the D.L.R.Bridge at Ch.117.070 km of

Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890

2 References

Drawing referred for the design of D.L.R.Bridge are as follows:


- MOST Drawing NO. BD/4-76
- MOST Drawing NO. BD/5-76A
- MOST Drawing NO. BD/6-76A

The IS/IRC Codes referred for the design of D.L.R.Bridge are as follows:
- IRC:5-2000 : - Standard Specifications & Code of Practice for Road Bridges-Section-I

[ General Features of Designs. ]

- IRC:6-2000 : - Standard Specifications & Code of Practice for Road Bridges-Section-II

[ Loads & Stresses. ]

- IRC:21-2000 : - Standard Specifications & Code of Practice for Road Bridges-Section-II

[ Cement Concrete(Plain & Reinforced)]

- IS:456-2000 : - Plain and Reinforced Concrete - Code of Practice.

- Guidelines for Design of CM/ CD works, CDO.

3 D.L.R.Bridge Design

Vizainagaram To Rajam B.T road crosses the Right Main Canal of Thotapalli Barrage at Km 117.890.

D.L.R.Bridge is proposed for the continuity of the road .


NAGARJUNA CONSTRUCTION COMPANY LTD.

DOCUMENT NO. DATE


PROJECT: Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of S.L.R.Bridge at Ch. 117.090 km
KSK KVCHN
NAGARJUNA CONSTRUCTION COMPANY LTD.

DOCUMENT NO. DATE


PROJECT: Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of S.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

4.1 Hydraulic Particulars of Canal at Point of Crossing


DESCRIPTION PARTICULARS UNITS
Discharge (Required/Designed) Q = 2.238 / 2.238 Cumecs

Bed width B = 4.30 m


Full supply depth F.S.D = 1.060 m

Side slopes (Inner) (z:1) = 1.5 : 1 ---

(Outer) (z:1) = 2.0 : 1 ---

Bed fall 1 IN = 1 / 8500 ---

Value of Rugosity n = 0.0250 ---

Free board = 0.50 m

Velocity V = 0.364 m/sec

Top width of banks (Left / Right) L/S = 4.00 + Dowel m


R/S = 2.50 Incl Dowel

Canal Bed Level C.B.L = + 85.994 m

Full Supply Level F.S.L = + 87.054 m

Top Bund Level T.B.L = + 87.554 m

Road Crossing Level = + 89.085 m

4.2 SCOUR DEPTH :

As per clause 110.1.3 of IRC : 5-1998,the Mean depth of scour is calculated by formula

Mean depth of scour (Dsm) = 1.34 x Db 2 (1/3)

Ksf

Where Db = Discharge/ m width

Ksf = silt factor = 2

Canal width at C.B.L = 4.30 m


Canal width at F.S.L = 7.48 m

= 2.238
Db
4.30 + 7.48 2

= 0.380 Cumecs 2 (1/3)

Mean depth of scour (Dsm) = 1.34 x 0.4

= 0.558 m

Maximum depth of scour = 2xDsm


= 2 x 0.558

= 1.116 m say 1.2 m from F.S.L


NAGARJUNA CONSTRUCTION COMPANY LTD.

DOCUMENT NO. DATE


PROJECT: Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of S.L.R.Bridge at Ch. 117.090 km
KSK KVCHN
NAGARJUNA CONSTRUCTION COMPANY LTD.

DOCUMENT NO. DATE


PROJECT: Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of S.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

Scour level = F.S.L - Maximum depth of scour

= 87.054 - 1.2

= 85.854 m

which is 0.140 m below CBL

4.3 AFFLUX IN CANAL :


Depth of flow = 1.060 m

Top width of Abutment below bed block = 1.000 m

Area of obstruction due to each abuyment = 0.000


= 0 m2
Area of obstruction due to 2 abutment = 0 x 2.000

= 0 m2

Width of canal at F.S.L = 4.30 + 2.00 x 1.50 x 1.06


= 7.48 m

Area of normal section (A) = 4.30 + 7.48 x 1.06

= 2

= 6.24 m2

Net area of flow(a) = 6.24 - 0


= 6.24 m2

v2 + 0.01524 x A 2 1
Afflux =
17.85 a

2 2 2

= 0.364 + 0.01524 x 6.24 1

17.85 6.24

= 0m

= 0.000 cm < 5 cm

Hence Ok (As per C.D.O Guide lines)

5.0 DESIGN OF SUPER STRUCTURE

Super structre is adopted from Standard design of concrete bridges of MOST for T-Beam slab bridge

with footpaths for effective span of 10.500 m along with elastomeric bearings

VERTICAL CLEARANCE

Vertical clearance available = 89.625 - 85.994 = 3.631 > 1.200


m
( Vide CL 106.2.1 of IRC: 5-1998) Hence OK
NAGARJUNA CONSTRUCTION COMPANY LTD.

DOCUMENT NO. DATE


PROJECT: Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 117.890
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of S.L.R.Bridge at Ch. 117.090 km
KSK KVCHN
NAGARJUNA CONSTRUCTION COMPANY LTD.
DOCUMENT NO. DATE
PROJE Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 107
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of D.L.R.Bridge at Ch. 117.090 km
KSK KVCHN
6.0) DESIGN OF ABUTMENT
VR
+ 91.275
+ 90.925 W10 W7
+ 91.050

+ 89.625 W2 89.425
+ 89.125 W8 W1

FSL 86.117
W5
Density of soil : 2.10 t/m3 W9 3609
Density of concrete : 2.20 t/m3
Density of Rcc : 2.40 t/m3 W11 W6 W4 W3
Live load surcharge : 1.34 m 750
500 1100 500 750 500
86.016 A

85.416 W12 B 600


3100
4100

1) REACTION ON ABUTMENT;

Dead load : Length of abutment = = 10.5 m

As calculated in Abutment design = 155.20 t

As per DRG.NO. BD/14- 75A

Load on abutment = 155.200 / 2 = 77.6 t

Load coming on to abutment per m length = 77.6 / 10.5 = 7.390 t/ m

Live load :

Live load maximum = 74.150 t

Impact factor = 4.5 = 4.5 = 0.220

6+L 6+ 14.50

As the impact factor reduces to zero at 3.00 m below bed block and 0.5 times the

factor at bottom of bed block, the above factor comes down to

= 0.220 x 0.00 = 0.000 on top of concrete

2 3.00

Live load including impact per m length = 74.150 x 1.000 = 7.724 t/m

9.60

Total load coming on abutment = 7.390 + 7.724 = 15.114 t/m

2) Force due to braking effect ;

20 % of max train load on span

The Braking force for this loading is the maximum that is coming on the span = 74.150 ( from DRG.NO. BD/14- 75A

Braking force = ( 74.150 ) 20 /( 100 x 2 ) = 7.415 t

acting at 1.20 m above road level I.e.,

Force per running m = 7.415 / 9.60 = 0.772 t/m


NAGARJUNA CONSTRUCTION COMPANY LTD.
DOCUMENT NO. DATE
PROJE Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 107
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of D.L.R.Bridge at Ch. 117.090 km
KSK KVCHN
NAGARJUNA CONSTRUCTION COMPANY LTD.
DOCUMENT NO. DATE
PROJE Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 107
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of D.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

3) Frictional force due to bearings

Force( from pier design ) = 1 x 2.035 = 2.035 t

Force per running m = 2.035 / 9.60 = 0.212 t/m

STRESS ON CONCRETE: ( Taking moments about 'A' )


S.NO Description Load LA Moment
in Tons in mts in T.m

1 VR : Vertical loads 15.114 1.125 17.004

2 W1 : Bed block 0.750 x 0.800 x 2.400 1.440 1.750 2.520

3 W2 : Dirt wall 0.500 x 2.150 x 2.400 2.580 0.500 1.290

4 W3 : 0.5 x 0.750 x 3.109 x 2.200 2.565 0.500 1.283

5 W4 : 0.750 x 3.109 x 2.200 5.130 1.125 5.771

6 W5 : 0.500 x 5.259 x 2.200 5.785 1.750 10.124

7 W6 : 0.5 x 1.100 x 5.034 x 2.200 6.091 2.367 14.416

8 W7 : 1.100 x 0.225 x 2.400 0.594 2.550 1.515

9 W8 : 1.100 x 1.925 x 2.100 4.447 2.550 11.339

10 W9 : 0.5 x 1.100 x 3.109 x 2.100 3.591 2.733 9.815

11 Pv : 0.038 x ( 6.599 ²- 1.340 ² ) x 2.100 3.33 3.100 10.3

V= 50.669 85.405

12 Ph : 0.134 x ( 6.599 ²- 1.340 ² ) x 2.100 11.75 2.209 ( - ) 25.950

13 Braking force 0.772 3.609 ( - ) 2.788

14 Frictional force 0.212 3.609 ( - ) 0.765

M= 55.902

Lever arm = M/V = 55.902 / 50.669 = 1.103276835 m

Eccentricity = 1.10328 - 3.100 /2 = 0.447 m

B/6 = 3.10 /6 = 0.517 m > 0.447 m Hence No Tension

Max. Stress = ( 50.669 / 3.100


) x { 1 + (6 x 0.447 ) / 3.100 }

= 30.48 t/m 2
( Compression )

Min. Stress = ( 50.669 / 3.100


) x { 1 - (6 x 0.447 ) / 3.100 }
= 2.21 t/m 2
( Compression )
STRESS ON SOIL: ( Taking moments about 'B' )
S.NO Description Load LA Moment
in Tons in mts in T.m

1 Item 1 to 8 same as on concrete 47.337 75.076

2 Item 1 to 8 same as on concrete 47.337 0.500 23.668

3 W10 : 0.500 x 0.225 x 2.400 0.270 3.850 1.039

4 W11 : 0.500 x 5.034 x 2.100 5.286 3.850 20.350

5 W12 : 4.100 x 0.600 x 2.200 5.412 2.050 11.095

6 Pv : 0.038 x ( 7.199 ²- 1.340 ² ) x 2.100 3.99 4.100 16.4

V= 62.297 147.598

7 Ph : 0.134 x ( 7.199 ²- 1.340 ² ) x 2.100 14.08 2.461 ( - ) 34.644

8 Braking force 0.772 4.209 ( - ) 3.251


NAGARJUNA CONSTRUCTION COMPANY LTD.
DOCUMENT NO. DATE
PROJE Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 107
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of D.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

9 Frictional force 0.212 4.209 ( - ) 0.892

M= 108.810
NAGARJUNA CONSTRUCTION COMPANY LTD.
DOCUMENT NO. DATE
PROJE Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 107
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of D.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

Lever arm = M/V = 108.8103467 / 62.297 = 1.74663895 m

Eccentricity = 1.74664 - 4.100 /2 = 0.30336105 m

B/6 = 4.100 /6 = 0.683 m > 0.30336105 m Hence No Tension

Max. Stress = ( 62.2969886 / 4.100


) x { 1 + (6 x 0.303 ) / 4.100 }

= 21.94 t/m 2
( Compression )

Min. Stress = ( 62.297 / 4.100


) x { 1 - (6 x 0.303 ) / 4.100 }

= 8.45 t/m2 ( Compression )

7.0) DESIGN OF WING WALL

92.175
900
91.275 W1

Grade of concrete : M15


Density of RCC : 2.4 t/m3
Density of Concrete : : 2.2 t/m3 W6
Density of Soil : 2.1 t/m3 W5 W3 3130
Live load : 1.2 m
Surcharge W4 W2

88.145 400 1300 500 0 400


A W7
87.545 B 600
1800
2600

STRESS ON CONCRETE: ( Taking moments about 'A' )

Load Description Load-t L.A -m Moment-tm


W1 0.900 x 0.300 x 2.200 0.594 1.550 0.921
W2 0.50 x 0.000 x 3.130 x 2.200 0.000 1.800 0.000
W3 0.500 x 3.130 x 2.200 3.443 1.550 5.337
W4 0.50 x 1.300 x 3.130 x 2.200 4.476 0.867 3.88
W5 0.50 x 1.300 x 3.130 x 2.100 4.272 0.433 1.85
Pv 0.0380 x ( 4.330 ²- 1.200 ² ) x 2.100 1.38 0.000 0.000
Total Load 14.17
Ph 0.1340 x ( 4.330 ²- 1.200 ² ) x 2.100 4.87 1.315 6.40
Total Moment 18.39

Leverarm = 18.39 / 14.17 = 1.298 m


Eccentricity = 0.900 - 1.30 = 0.398 m
B/6 = 1.800 /6 = 0.300 m < 0.398 m Tension

MAX. STRESS = 14.17 x {1 + 6 x 0.398 } = 18.32 t/m²


1.80 1.800 ( Compression )
MIN STRESS = 14.17 x {1 - 6 x 0.398 } = -2.58 t/m²
1.80 1.800 ( Tension )
NAGARJUNA CONSTRUCTION COMPANY LTD.
DOCUMENT NO. DATE
PROJE Thotapalli Barrage Project - Right Main Canal from Km 52.45 to 107
MNJV-TBP-DLRB-117.090 18.05.10
DESIGNED CHECKED PAGE
TITLE : Design of D.L.R.Bridge at Ch. 117.090 km
KSK KVCHN

STRESS ON SOIL: ( Taking moments about 'B' )

Load Description Load-t L.A -m Moment-tm


W1 0.300 x 0.900 x 2.200 0.594 1.950 1.16
W2 0.5 x 0.000 x 3.130 x 2.200 0.000 2.200 0.00
W3 0.500 x 3.130 x 2.200 3.443 1.950 6.71
W4 0.5 x 1.300 x 3.130 x 2.200 4.476 1.267 5.67
W5 0.5 x 1.300 x 3.130 x 2.100 4.272 0.833 3.56
W6 0.400 x 3.130 x 2.100 2.629 0.200 0.53
W7 2.600 x 0.600 x 2.200 3.432 1.300 4.46
Pv 0.0395 x ( 4.930 ²- 1.200 ² ) x 2.100 1.90 0.000 0.00
Total Load 20.74
Ph 0.1584 x ( 4.930 ²- 1.200 ² ) x 2.100 7.61 1.567 11.92
Total Moment 34.00
Leverarm = 34.00 / 20.74 = 1.639 m
Eccentricity = 1.300 - 1.64 = 0.339 m
B/6 = 2.600 /6 = 0.433 m > 0.339 m Hence No Tension

MAX. STRESS = 20.74 x {1 + 6 x 0.339 } = 14.23 t/m²


2.60 2.600 ( Compression )
MIN STRESS = 20.74 x {1 - 6 x 0.339 } = 1.73 t/m²
2.60 2.600 ( Compression )
STRSS TABLE

S.No DESCRIPTION STRESS ON CONCRETE( t/m2) STRESS ON SOIL( t/m2)


MAX ( t/m2) MIN ( t/m2) MAX ( t/m2) MIN ( t/m2)
1 ABUTMENT 30.48 2.21 21.94 8.45
2 WING AT START 18.32 -2.58 14.23 1.73
(As per IRC-21-2000 TABLE No 11 stress are in limits)