Commercial Preline Inspection Checklist
Commercial Preline Inspection Checklist
Ver: 8
Date: 29/04/14
Tradesperson: Tradesperson:
[Link].: Contact Details: Reg. No.: Contact Details:
Date: Time: Staged/Partial Inspection: of
Item to be inspected for compliance: Outcome1 Details of Inspection & Comments:
with the Building Act 2004, Comments must be made for:
NZBC and Approved Documents. Complies 1. Non-complying Items
N/A
with approved plans and specifications. 2. Items/work deviating from approved documents
Pass
Fail
Note: N/A = this item is not applicable to this application 3. Detail alternative solution & how compliance is achieved
and has not been assessed
Conditions of consent/site instructions read? Yes / No
Approved plans & specifications sighted?2 Yes / No
Approved plans include specific design Yes / No
detail?
Plumbing pre-line inspection passed?3 Yes / No Comment:
Subfloor inspection passed?
Framing inspection passed?
Site hazard board read Yes / N/a / No
Specify: safety footwear / eye protection / dust mask
Special PPE required for this site high visibility jacket / hard hat
Yes / No
(as detailed on hazard board)? Other:
Fire safety precautions allowed for?4 Yes / No
Exterior
Exterior cladding in place & weathertight? Yes / No
If “No” Weathertight Inspection Checklist
MUST be completed & passed
Roof
Roof cladding & flashings5
Access to roof space6
Bracing
Brace bottom plate fixings Type:
Unit length as per plan
Bracing limitations7
Roof bracing checked
Bracing as per approved plans
Framing
Bottom plate fixings Type:
Floor plan as per approved plans
Moisture content8 MC Range %- %
Lintels & beams as per approved plans
Lintel/beam support & fixings & straps
Fixings for high wind9
Top plate fixings10
Spacing (suitable for linings)
Engineer detail as per approved plans
Engineer design steel connections checked
Fire Wall
Engineer detail as per approved plans
Property rating requirements checked11
Life rating requirements checked12
Fixings & straps
Penetrations & electrical fittings13
Insulation
Air gap backing rod and foam installed
correctly?
Insulation walls Type: Grade: R
Insulation ceilings Type: Grade: R
Blown insulation thickness
Insulation in skillion roof
Page 1 of 2
DMS-#73648-v8-BCA_T-30ah_-_Commercial_Inspection_-_Preline.DOC
BCA T-30ah
Ver: 8
Date: 29/04/14
N/A
with approved plans and specifications. 2. Items/work deviating from approved documents
Pass
Fail
Note: N/A = this item is not applicable to this application 3. Detail alternative solution & how compliance is achieved
and has not been assessed
Ply (roof & decks) thickness as per plans
Safety Glazing
Exterior windows
Window restrictors fitted
Doors
Stairs
Wet areas
Glass manifestation checked
Wet Area
Flooring substrate as per plans
Waterproofing systems checked
Provision for accessible facilities checked14
Notes15:
1 Pass = Compliance with approved plans & documentation, N/A = Not applicable to this project, Fail = Non-compliance with approved plans &
documentation.
2 Approved stamped site plan, foundation plan, cross section drawings, truss layout and fixing detail, specifications, engineer detail, floor plan,
actions
4 Emergency lighting, alarm systems, hose reels, alarm panel, etc.
5 Roof is weatherproofed i.e. minimum of ridge caps, barge rolls, barge flashings, apron flashings in place
6 NZS 3604:1999 Section 13.3.1 & NZS 3604:2011 section 13.3.1 location to allow unobstructed access to roof space, min. 600mm headspace
7 Check bracing limitations in appropriate bracing manual (e.g. Limitations Page 8 GIB Bracing Systems)
8 Reference E2 / AS1, 11.2. Forest Research Institute recommends testing 10 studs, 6 ceiling battens & 6 lintels, 9 out of the 10 studs must be