Republic of the Philippines
Province of Oriental Mindoro
Municipality of Pinamalayan
Date Sept. 11, 2019
PROGRAM OF WORKS/BUDGET COST
Vegetation Control
Project Category
NAME OF PROJECT: Vegetation Control Implementation/Procedure : By Administration
Description/Dimension:
Location: Brgy. Papandayan Pinamalayan, Oriental Mindoro Vegetation Control
Appropation/amount: 32,000.00
Source of Funds: Municipal Fund 2023 (MOOE)
P.D/
Classification: Desirable Starting Date: Upon Approval
Cal. Days to Complete 8 calendar days Target Date of Completion:
REQUIREMENTS
ITEM No. DESCRIPTION OF WORK TO BE DONE % AMOUNT
DESCRIPTION
I Vegetation Control 100%
DIRECT COST
ITEM No. DESCRIPTION OF WORK TO BE DONE QTY UNIT UNIT COST
AMOUNT
I Vegetation Control 1.00 lot 32,000.00 32,000.00
BREAKDOWN OF ESTIMATES COST
(Refer to Detailed Cost)
d) Direct Lab. For Work: 32,000.00 100.00% 1. MATERIALS, Fuels, Oil
Item b) VAT of 2.Equipment Labor 32,000.00
c)………. 3. VAT OF 2
2. Materials Cost 4.OCM Profit Mobil.
3. OCM, Profit & Mobil . A. Total Direct Cost 32,000.00
4. Quality Control B. Indirect Cost
5. Equipment Rentals 1. Contingencies Overhead
6. Fuels,Oils Spareparts 2. Mun. Retentions
B. INDIRECT COST 3. Quality Control Retentions
1. Contingencies Eng'g
and Admin. Overhead TOTAL INDIRECT COST
2. Retentipns TOTAL PROJECT COST 32,000.00
TOTAL PROJECT COST 32,000.00 100% SAY 32,000.00
PREPARED BY: RECOMMENDING APPROVAL:
CHECKED AND VERIFIED: APPROVED:
DETAILED ESTIMATES
ITEM NO. I
Description of Item: Vegetation Control Quantity: L.S
(Includes Excavation & Lay-Out)
A. LABOR
(Include acquisition and Materials)
NUMBER NO. OF DAYS MEN/DAYS RATE/DAY AMOUNT
Laborer 10 8 80 400.00 32,000.00
SUB-TOTAL 32,000.00
B. EQUIPMENT
(Include acquisition and delivery of materials)
NUMBER NO. OF DAYS MEN/DAYS RATE/DAY AMOUNT
SUB-TOTAL
C. FUEL, OIL, AND SPAREPARTS:
(Exclude acquisition and delivery of Materials)
QUANTITY UNIT UNIT COST AMOUNT
Diesoline
Gasoline
Lubricants
Maint./Spareparts
SUB-TOTAL
D. MATERIALS:
(Include Cost of Labor, Equipments, Fuel & Oil for Material Acquisition and delivery)
MATERIALS QUANTITY UNIT UNIT COST AMOUNT
SUB TOTAL
TOTAL COST OF ITEM 32,000.00
UNIT COST L.S
SAY L.S