Project: KG-1 SHEET NO : 1
Element: Sedimentation wall DATE : 15/02/2005
ref Calculation Results
1 Concrete Lateral pressure Calculation.
[
Pmax =D [ C1 √ R ]+ D C2 K ( √ H−C 1 √ R ) ] OR Pmax DH
Whichever is the smaller.
a. Formwork vertical height , H= 3 m
b. Average rate of concreting , R= 1 m/Hr
c. Temperature of concreting at the time of placing, t= 24 centi.
d. Type of cement C2,= 0.3
e. Density of concrete, D= 25 KN/m3
f. Coefficient of formwork of wall, C1 = 1
Pmax = 33.59 KN/m2 OR Pmax =Dh = 75 KN/m2
( )
2
36
Where, K= 0.81 K=
t+16
The maximum concrete lateral Pressure= 33.59 KN/m2
2 Concret Lateral pressure Distribution
3 Tie Rod Calclation
Load Calculation
F=( P max × A×F s 1 + F c ×F s2 )
Fs1 = 1.5
Where Fs1, Fs2- Safety factors Fs2 = 1.4
Fc- Compaction Load, Cosider 6KN
PROJECT KG-1 SHEET NO 2
ELEMENT Sedimentation wall DATE : 15/02/2005
ref. Calculation Results
T18, Tie Rod diameter 14.93mm and Net Area, A = 174 mm2
Use G 43 Steek, Ps = 215 N/mm2
Let Tie Rod Spacings @ 600mm at 450mm height P1 = 33.59 KN/m2
F1 = 24.27 KN Spacing = 0.6 m
Tie Rod Spacings @ 600mm at 1050mm height P2 = 33.59 KN/m2
F2 = 31.07 KN Spacing = 0.6 m
Tie Rod Spacings @ 600mm at 1950mm height P3 = 23.67 KN/m2
F3 = 27.57 KN Spacing = 0.6 m
Tie Rod Spacings @ 1200mm at 2850mm height P3 = 3.38 KN/m2
F3 = 11.59 KN Spacing = 1.2 m
Fallowable = Ps* A = 37.41 KN > F1,F2,F3,F4
It is OK.
4 Vertical Soldier Calculation
Vertical Soldiers use 2Nos. 50x100x2 mm SHS
Ixx = 1121200 mm4 E= 210000
Wxx = 22420 mm3
Q=P 'max ×amax a max = 0.75
Q= 44.09 KN/m ' 58.79
Pmax =
Consider Simply supported for 2nd span
Here a = 750 mm
P'max ×a×b2 b= 900 mm
σ max =
2×8×W xx
σ max = 99.56 Mpa < Ps= 215 Mpa
Strength is Ok.
Check for Deflection.
4
5×q max ×b = 0.80 mm
W max =
384×E×(I ×2)
W allowable =900/500 = 1.8 mm
The Deflection is OK