Plate Heat Exchanger Specs
Plate Heat Exchanger Specs
1.0 General PHE for TG & Station Aux. PHE for SG Aux.
1.1 Number of Plate Heat Exchanger Nos Total Four (4) nos i.e. [1W+1S] for each unit Total Four (4) nos i.e. [1W+1S] for each unit
3.0 Guaranteed Performance Requirements for each Heat Exchangers in fouled condition:
3
(DMCW Side) M /hr 1920 600
3.1 Flow rate
(ACW Side) M3/hr 1920 600
o
(DMCW Side) C 46.2 45.1
3.2 Inlet temperature
o
(ACW Side) C 36 36
o
(DMCW Side) C 38 38
3.3 Outlet temp
o
(ACW Side) C 44.5 43.4
* Allowable pressure
drop across heat
(DMCW Side) MWC 7
exchanger from inlet to
3.4
outlet in fouled
conditions at design (ACW Side) MWC 7
flow
Design Heat Load per (DMCW Side) Kcal/Hr 15666000 4214400
3.5
PHE (ACW Side) Kcal/Hr 15666000 4214400
* High pressure drop than the specified figure will not be accepted, no credit shall however be given for lower pressure drop in bid evaluation. Pressure drop
mentioned shall be calculated against flow mentioned at S. No 3.1. of this datasheet. Each heat exchanger shall be capable of passing a flow of at least 1.1 times the
design flow rate on both primary and secondary water sides. Bidder shall indicate maximum pressure drop through the heat exchanger under this condition.
6.3 Compression/Fixed/Frame/Movable Pressure plates Carbon Steel, ASTM A36, Epoxy painted (with Titanium cladding on ports on ACW side)
6.4 Guide Rails/ bar Carbon Steel, ASTM A36 with SS cladding (CS to be epoxy painted)
6.5 Support Beam/ column Carbon Steel, ASTM A36 Epoxy Coated
6.13 Painting
External Surface
b.) Primer All surface other than stainless steels shall be painted.
The steel surface to be applied with painting shall be thoroughly cleaned before applying painting by shotblasting
(SA 2.5) etc shall be subjected to BHEL/Customer approval. For all the steel surfaces inside the (indoor
installation) building, two coats of epoxy polymide resin based red oxide-zinc phosphate (primer) of minimum
thickness of 30 microns/coat followed up with one coat of epoxy resin based paint with MIO/coal tar based epoxy
c.) Final Paint paint of minimum thickness of 80 microns shall be applied. The top coat shall consist of two coats of epoxy
polyamide enamel suitably pigmented of minimum thickness of 30 microns/coat. Thus total thickness shall be
minimum 200 microns.
12.1 Hydrotesting Pressure Kg/cm2 (g) 1.5 times the design pressure
13.1 Primary side water outlet temperature vs. Secondary side water inlet temperature.
13.2 Primary side water flow (80% to 115%) vs. Pressure drop and outlet temperature (Secondary side flow – 100%)
13.3 Secondary side water flow (80% to 115%) vs. Secondary side pressure drop and primary side outlet temp (Primary side flow – 100%)
13.4 Primary side water outlet temperature vs. Primary side inlet temp.
13.5 Film heat transfer coefficient curve
13.6 Correction Curves.
14.4 Heat transfer plates shall be sealed at their outer edges and around the ports by gaskets in order to prevent leakage and inter-mixing of fluids.
Double sealing arrangement shall be provided at outer edge and around ports with the inter space between the seals vented to atmosphere in order to
14.5 avoid inter-mixing of liquids in case of gaskets failure.
14.6 Each Plate shall be numbered in sequence with the number marked by indelible ink on each plate to permit easy reassembly.
14.7 Flanges shall be as per ANSI B 16.5 or equivalent. Thickness of pressure and frame plates shall be as per ASME Sect. VIII div.1.
Frame of exchanger should be designed so that 25% additional plates can be added in future i.e 25% extra capacity for additional plates shall be
14.8
provided in frame.
SECONDRY SIDE
Annex M-04
COOLING WATER ANALYSIS
Wateranalysis
( SEA WATER )
3 Sampling April 7,9 31 2550 13190 12,00 54 5,7 2,1 1,3 1360 3,20 376
4 Sampling July 7,1 33 175 445 2,20 90 6,8 0,45 0,76 45 3,10 28
5 Sampling October 8,1 31 0,00 7,6 4,00
9724
Oil and
SiO2 Grease
SL Sampling Location Al (mg/L) Ba (mg/L) Ca (mg/L) Fe (mg/L) Mn (mg/L) Mg (mg/L) K (mg/L) Na (mg/L) FC (CFU) TC (CFU) (mg/L) P (mg/L) TOC (mg/L) DOC (mg/L) (mgl)
1 High tide, Passur River, Mongla, Khulna 0,85 0,107 26,75 2,0 <.05 8,7 3,9 29,11 240 460 11,7 1,2 6,25 3,93
2 Low tide, Passur River, Mongla, Khulna 0,962 0,165 26,94 4,2 <.05 9,4 6,68 41,77 270 520 13,6 2,3 7,91 4,49
Sampling 16 August 2014
6 Sampling 23. May 2014: Jetty Side Passur River 296 0,51 737 204 8505 14,3
8140A01/FICHT-14920448-v1
SECONDRY SIDE
COOLING WATER ANALYSIS
( SEA WATER )
Test Results on Water Quality and Sedimentation Characteristics of Possur River at Intake Point (BIFPCL, Rampal)
SEA WATER
WATER
Design ANALYSIS
Wave Height 2.0 m
Design Wave Period 6.0 sec
Sedimentation and Siltation: Soft to stiff clay and alternations of very sandy
and stiff clay.
A water analysis from the area adjacent to the site giving salinity and water
quality is shown below:
8140A01/FICHT-14374282-v21 B0-12
BIFPCL/EPC-Main Plant/2015/0/
SECONDRY SIDE
COOLING WATER
ANALYSIS SEA WATER
8140A01/FICHT-14374282-v21 B0-13
BIFPCL/EPC-Main Plant/2015/0/
TITLE :
SPECIFICATION NO. PE-TS-421-179-N001
TECHNICAL SPECIFICATION FOR
PLATE HEAT EXCHANGERS SECTION II
REV. NO. 0 DATE 06/01/18
SECTION II
SECTION: IIA
SECTION: IIA
PE-TS-XXX-179-N001
SECTION: IIA
PE-TS-XXX-179-N001
SECTION: IIA
PE-TS-XXX-179-N001
SECTION: IIA
PE-TS-XXX-179-N001
SECTION: IIA
PE-TS-XXX-179-N001
SECTION: IIA
PE-TS-XXX-179-N001
SECTION: IIA
PE-TS-XXX-179-N001
SECTION: IIA
STANDARD QUALITY CUSTOMER: PROJECT TITLE: SPECIFICATION NO. : PE-TS-XXX-179-N001
PLAN BIDDER/VENDOR: QUALITY PLAN NO.:
SPECIFICATION TITLE : TECHNICAL SPEICIFICATION FOR
SYSTEM: ITEM: PHE PLATE HEAT EXCHANGERS
SHEET 1 OF 5
SECTION : IIA
EXTENT REFERENC
TYPE/ AGENCY
SL. COMPONENT & CHARACTERISTICS CAT OF CHECK E ACCEPTANCE FORMAT OF
METHOD OF REMARKS
NO OPERATIONS 2/3 1 DOCUMEN NORMS RECORD
CHECK
T P W V
1. 2. 3. 4. 5. 6. 7. 8. 9. D* ** 10. 11.
1.0 RAW MATERIAL INSPESTION
1/ If co-related mill TCS
1/ Mill TC Or
Heat/He App. Drg / Relevant are not available then
Physical Properties MA Physical Test Heat/He- Lab Test √ 2,3 - 1
-at Data Sheet material spec. check testing carried
at Batch Report
Batch out by reputed lab
1/
Frame Plates & Pressure 1/
Chemical Heat/He
Plates, Counter Flanges, Chemical Properties Heat/He- -do- -do- -do- √ 2,3 - 1 -do-
MA Analysis -at
1.1 Connection Lining at Batch
Batch
Material.Top And Bottom Inspection
Carrying Bar. Dimensions MA Measurement 100% 100% Approved Drawings √ 2,3 - 1
Reports
Workmanship And Finish MA Visual 100% 100% -do- -do- -do- 2,3 - 1
Lamination Applicable for plate
Ultrasonic
(Applicable For Frame And CR 100% 100% SA 435 SA 435 -do- √ 2,3 - 1 thickness more than
Test
Pressure Plate Only) 25 mm only
Mill TC Or Co-related mill TCS to
App. Drg. / App. Drg. / Data
Physical Properties MA Physical Test 1/ Heat 1/ Heat Lab Test √ 2,3 - 1 be provided. See
Data Sheet Sheet
Report Remark 1
Heat Transfer
1.2 Chemical
Plates/Coils Chemical Properties MA 1/ Heat 1/ Heat -do- -do- -do- √ 2,3 - 1 -do-
Analysis
Inspection
Dimensions MA Measurement 100% Sample Approved Drawings √ 2,3 - 1
Reports
Dimensions MA Measurement 100% Sample Approved Drawings Inspection
2,3 - 1
Reports
Workmanship And Finish MA Visual -do- -do- No damage, No Surface defects. -do- 2,3 - 1 Co-related mill TCS to
1.3 Gaskets be provided.
Contour MA Visual -do- -do- Mfg. Drgs / specification -do- 2,3 - 1
Hardness CR Measurement -do- -do- Approved Drawings -do- √ 2,3 - 1
LEGEND: * RECORDS, INDENTIFIED WITH “TICK” ( ) SHALL BE Cust. DOC. NO.: REV. CAT-.
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION. Logo
** 1: BHEL 1* SHALL BE CLEARED BY BHEL 2: VENDOR, 3: SUB
VENDOR
MANUFACTURER/ MAIN-SUPPLIER P: PERFORM W: WITNESS AND V: VERIFICATION. AS APPROPRIATE FOR
SUB-SUPPLIER CHP: CUSTOMER SHALL IDENTIFY IN COLUM “N” AS ‘ W” CUST.
SIGNATURE USE REVIEWED BY APPROVED BY APPROVAL SEAL
1. 2. 3. 4. 5. 6. 7. 8. 9. D* ** 10. 11.
LEGEND: * RECORDS, INDENTIFIED WITH “TICK” ( ) SHALL BE Cust. DOC. NO.: REV. CAT-.
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION. Logo
** 1: BHEL 1* SHALL BE CLEARED BY BHEL 2: VENDOR, 3: SUB
VENDOR
MANUFACTURER/ MAIN-SUPPLIER P: PERFORM W: WITNESS AND V: VERIFICATION. AS APPROPRIATE FOR
SUB-SUPPLIER CHP: CUSTOMER SHALL IDENTIFY IN COLUM “N” AS ‘ W” CUST.
SIGNATURE USE REVIEWED BY APPROVED BY APPROVAL SEAL
1. 2. 3. 4. 5. 6. 7. 8. 9. D* ** 10. 11.
2 % or
Manufacturer's DP test
min. 100
procedure (to be reviewed and
DP test 10% nos. DPT Report See Remark 3
approved by BHEL/Customer √ 2,3 1 -
whichever
during contract stage)
is higher
Surface Defects And Cracks CR
Manufacturer's Light
Light Box Box/Vacuum test procedure (to
Vacuum Test
Test/ Vacuum 100% 10% be reviewed and approved by 2,3 1 - See Remark 3
Report √
chamber test BHEL/Customer during contract
stage)
PMI
1 Sample
PMI testing CR PMI test 100 % Approved drawing/ data sheet Compliance 2,3 - 1 See Remark 5
per Heat √
report
Customer /BHEL/ TPI
QW 482 (NPCIL, EIL, LLYODS
Welding Procedures ASME SEC-
2.2 Correctness MA Verification 100% 100% ASME SEC-IX. ASME SEC- √ 2,3 - 1 & BVIS) approved
Specification (WPS) IX.
IX WPS shall be used for
welding
Only customer /
BHEL/ TPI (NPCIL,
QW 484
Welders Performance Welder's Performance Visual / RT & EIL, LLYODS & BVIS)
2.4 MA 100% 100% -do- -do- ASME SEC- √ 2,3 - 1
Qualification Soundness Of Welds Mechanical approved welder shall
IX
be engaged for
welding.
LEGEND: * RECORDS, INDENTIFIED WITH “TICK” ( ) SHALL BE Cust. DOC. NO.: REV. CAT-.
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION. Logo
** 1: BHEL 1* SHALL BE CLEARED BY BHEL 2: VENDOR, 3: SUB
VENDOR
MANUFACTURER/ MAIN-SUPPLIER P: PERFORM W: WITNESS AND V: VERIFICATION. AS APPROPRIATE FOR
SUB-SUPPLIER CHP: CUSTOMER SHALL IDENTIFY IN COLUM “N” AS ‘ W” CUST.
SIGNATURE USE REVIEWED BY APPROVED BY APPROVAL SEAL
1. 2. 3. 4. 5. 6. 7. 8. 9. D* ** 10. 11.
3.1 Complete Assembly a. Conformance to GA drg. MA -do- 100% 100% -do- -do- -do- 2 1 - CHP
LEGEND: * RECORDS, INDENTIFIED WITH “TICK” ( ) SHALL BE Cust. DOC. NO.: REV. CAT-.
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION. Logo
** 1: BHEL 1* SHALL BE CLEARED BY BHEL 2: VENDOR, 3: SUB
VENDOR
MANUFACTURER/ MAIN-SUPPLIER P: PERFORM W: WITNESS AND V: VERIFICATION. AS APPROPRIATE FOR
SUB-SUPPLIER CHP: CUSTOMER SHALL IDENTIFY IN COLUM “N” AS ‘ W” CUST.
SIGNATURE USE REVIEWED BY APPROVED BY APPROVAL SEAL
1. 2. 3. 4. 5. 6. 7. 8. 9. D* ** 10. 11.
CHP; Hydro test @
Unbalanced hydrostatic
Leakage / strength of 1.5 times the design
3.3 pressure (Secondary MA Hyd. Test 100% -do- -do- √ 2 1 -
structure 100% pressure with 60
Side)
minutes holding time.
Completeness of all Verification of Completion
3.4 Completeness MA 100% 100% Tech. Specs / App. Drawings √ 2 - 1
previous tests reports Certificate
REMARKS:-
1 Original Mill TC’s to be furnished by vendor to BHEL representative during inspection stage. BHEL to verify physical correlation of Mill TC’s with material.
2 Inspection of Heat Transfer Plate Area Measurement shall be by White Light Scanning Method from BHEL(Refer Annexure –A). In case, inspection of plate area measurement by white light scanning method of
specific PHE model has been witnessed by BHEL in past project then Type test certificates are acceptable to BHEL for same.
3. Reg. Dye Penetrant Test & Light Box Test: There shall be random witness by BHEL/ NTPC at Bidder’s works, in case any defect is found in any of selected % of plates, the whole lot shell be tested in presence of
BHEL & Customer. H.T. Plates without defect only shall only be accepted.
4. Ultrasonic test of tie rods shall be carried out using 10 mm / 20 mm size Normal Beam Probe of frequency 2 MHz. Using this probe the back wall echo in the sound area of bar shall be adjusted to 100% of full Screen
Height (FSH). The whole bar shall be scanned under this sensitivity setting. In this sensitivity setting any defect echo indication having height greater than 20% of FSH is not acceptable.
5. 100% PMI Inspection for material grade of PHE Heat Transfer plates shall be from third party like TUV/Lloyd & certificate shall be submitted for review of BHEL. BHEL reserves the right to conduct random &
independent PMI inspection on PHE’s Heat Transfer plates to ascertain the plate material.
LEGEND: * RECORDS, INDENTIFIED WITH “TICK” ( ) SHALL BE Cust. DOC. NO.: REV. CAT-.
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION. Logo
** 1: BHEL 1* SHALL BE CLEARED BY BHEL 2: VENDOR, 3: SUB
VENDOR
MANUFACTURER/ MAIN-SUPPLIER P: PERFORM W: WITNESS AND V: VERIFICATION. AS APPROPRIATE FOR
SUB-SUPPLIER CHP: CUSTOMER SHALL IDENTIFY IN COLUM “N” AS ‘ W” CUST.
SIGNATURE USE REVIEWED BY APPROVED BY APPROVAL SEAL
The Heat transfer area of the PHE plate is the area of the plate participating in the heat transfer
process viz. the wetted surface area inside the gasketed groove of the plate as shown in the
Annexure 1.
2) Apply the developer (as used in Dye Penetrant test) over the entire surface area of the
plate.
5) The entire surface area including all the geometrical features of the plate (corrugations)
is captured by the 3D camera.
7) The surface area can be measured from the 3D· CAD drawing.
TITLE :
SPECIFICATION NO. PE-TS-421-179-N001
TECHNICAL SPECIFICATION FOR
PLATE HEAT EXCHANGERS SECTION IIA
REV. NO. 0 DATE 06/1/18
SHEET 2 OF 2
ANNEXURE-1
The purpose of this procedure is to outline the requirements and procedures for protecting
the equipment’s during shipment and preserving during the storage.
Plate Heat Exchangers shall be packed in proper sizes of wooden cases. High
grade woods like Rubber woods, jungle wood, hard wood, mango wood, pine
wood, etc. is used for packing.
All finished (or) machined (External C.S. Surfaces shall be protected against
corrosion with corrosion resisting coating, which is easily removable (Compound
shall be such that it will remain on the surface at temperature normally
encountered during shipping & storage).
All machined surfaces shall be protected from mechanical damage. All external
unfinished carbon steel surfaces shall be sand blasted & shall be coated with rust
preventive primer.
Flanged opening if any shall be covered with blank flanges sealed with blank
gasket of natural rubber or equivalent. Butt welded opening shall be closed with
temporary closing covers. Internal threads shall be protected with metal plug
sealed with Teflon tape (if applicable). External thread shall be protected with PVC
sleeve.
Wooden cases shall be covered with HDPE cloth from inside wooden box and the
top. All the opening in plate heat exchanger shall be closed properly by suitably
covering to prevent foreign material entering in plate heat exchanger.
Loose material, primary and secondary a shall be packed in corrugated box and
plastic
bags with proper tagging.
All fabricated wooden cases & crates conform to the requirement as per table
given below:
Gross Weight [Kgs.] Board Thickness Batton / Rafter
Thickness
2000 to 9000 Min. 30 mm Min. 35 mm
TITLE :
SPECIFICATION NO. PE-TS-421-179-N001
TECHNICAL SPECIFICATION FOR
PLATE HEAT EXCHANGERS SECTION IIA
REV. NO. 0 DATE 06/01/18
SHEET 2 OF 2
All the equipment shall be protected for entire period of dispatch, storage and
erection against corrosion, incidental damage due to vermin, sunlight, rain, high
temperature, humid atmosphere, rough handling in transit and storage. All MS
parts which are not painted shall be provided with coating of grease.
Clay Desiccant or such other moisture absorbing material in small cotton bags
shall be placed and tied at various points on the equipment, wherever necessary.
6. Sea-worthy packing is applicable for Complete PHE package. Details of Sea-worthy packing is
enclosed with NIT.
TITLE :
SPECIFICATION NO. PE-TS-421-179-N001
TECHNICAL SPECIFICATION FOR
PLATE HEAT EXCHANGERS SECTION III
REV. NO. 0 DATE 06/01/18
SECTION III
COMPLIANCE CERTIFICATE
The bidder shall confirm compliance with following by signing/ stamping this compliance certificate and
furnishing same with the offer
a.) The scope of supply, technical details, construction features, design parameters etc. shall be as per
technical specification & there are no exclusions/ deviations with regard to same.
b.) QP/ test procedures shall be submitted in the event of order based on the guidelines given in the
specification & QP enclosed therein.
QP will be subject to BHEL/Customer approval in the event of order & customer hold points for
inspection/ testing shall be marked in the QP at the contract stage. Inspection/ testing shall be
witnessed as per same apart from review of various test certificates/ Inspection records etc.
The charges for 3rd party inspection (Lloyds, TUV or equivalent) for imported components shall be
included in the base price of the equipment by the bidder.
c.) All drawings/data – sheets etc. to be submitted during contract shall be subject to BHEL/Customer
review/ approval.
GA drawings, as submitted with offer at tender stage are for reference purpose only and shall be
subject to approval during contract stage.
d.) There are no other deviations with respect to specification other than those furnished in the
‘Schedule of Deviations’
e.) The offered materials shall be either equivalent or superior to those specified. Also for components
where material is not specified it shall be suitable for intended duty, materials shall be subject to
approval in the event of order.
f.) The commissioning spares (if any) are supplied on ‘As Required Basis’ & prices for same included
in the base price (If bidders reply to this is “No commissioning spares are required” and if some
spares are actually required during commissioning same shall be supplied by bidder without any
cost to BHEL).
g.) All sub vendors shall be subject to BHEL/CUSTOMER approval.
h.) Any special tools & tackles, if required, shall be in bidder’s scope.
i.) Performance Guarantees for PHE’s shall stand valid as per commercial terms and conditions.
j.) Regarding bidder’s association with their respective Principals ( Plate & Gasket supplier ) bidder
confirms the following:
i. Plate supplier shall vet the thermal design of PHE at tender and contract stage and certify the
adequacy of design and no of plates.
ii. Guarantee schedule duly vetted by Principal shall be submitted during contract stage.
iii. Bidders have back to back arrangement with their principal for technical guarantees.
SCHEDULE OF PERFORMANCE GUARANTEES SPECIFICATION NO. PE-TS-421-179-N001
Section IIIB
PLATE HEAT EXCHANGER-SG Rev No. 0
SL. NO. DESCRIPTION UNIT GUARANTEE VALUE
o
b) DMCW inlet temperature C
o
c) DMCW outlet temperature C
o
b) ACW inlet temperature C
o
c) ACW outlet temperature C
o
b) DMCW inlet temperature C
o
c) DMCW outlet temperature C
o
b) ACW inlet temperature C
o
c) ACW outlet temperature C
NAME
SIGNATURE
DATE
SPECIFICATION NO.
Title DATA SHEET - B PE-TS-XXX-179-N001
SECTION IIIC
PLATE HEAT EXCHANGER
SHEET 1 OF 7
INSTRUCTION TO BIDDER
1. This data sheet shall be read in conjunction with Specification No. PE-TS-XXX-179-N001 Section-
PE-TS-XXX-179-N001, SectionIA- D,
& IB.
Volume - IIB.
2. Items which deviate from Specification shall be marked with an asterisk (*)
SL.NO. ITEM UNIT PARTICULARS
1.0 General
1.1 Number of plate heat exchangers being Nos.
supplied.
1.2 Manufacturer
1.3 Model Number/ Type
1.4 Whether single or double pass
1.5 Flow Pattern
2.0 Design
2.1 Design Pressure bar (g)
2.2 Design Temperature oC
a) In fouled conditions
b) In clean conditions
Name of
Bidder/ Vendor
Revision Number 0 1 2 3 4
SECTION IIIC
PLATE HEAT EXCHANGER
SHEET 2 OF 7
INSTRUCTION TO BIDDER
1. This data sheet shall be read in conjunction with Specification No. PE-TS-XXX-179-N001
PE-TS-XXX-179-N001, SectionIA- &
Section- D,IB.
Volume - IIB.
2. Items which deviate from Specification shall be marked with an asterisk (*)
SL.NO. ITEM UNIT PARTICULARS
4.0 Heat Transfer & Fluid flow data Primary Side Secondary Side
(Hot Fluid) (Cold Fluid)
a) In Clean Condition
b) In fouled conditions
a) In Clean Condition
b) In fouled conditions
Name of
Bidder/ Vendor
Revision Number 0 1 2 3 4
SECTION IIIC
PLATE HEAT EXCHANGER
SHEET 3 OF 7
INSTRUCTION TO BIDDER
1. This data sheet shall be read in conjunction with Specification No. PE-TS-XXX-179-N001
PE-TS-XXX-179-N001, SectionIA- &
Section- D,IB.
Volume - IIB.
2. Items which deviate from Specification shall be marked with an asterisk (*)
SL.NO. ITEM UNIT PARTICULARS
6.1 Type
6.2 Material and composition
6.3 Thickness of gasket mm
6.4 Hardness of gasket
6.5 Expected life of gasket
Name of
Bidder/ Vendor
Revision Number 0 1 2 3 4
SECTION IIIC
PLATE HEAT EXCHANGER
SHEET 4 OF 7
INSTRUCTION TO BIDDER
1. This data sheet shall be read in conjunction with Specification No. PE-TS-XXX-179-N001
PE-TS-XXX-179-N001, SectionIA- D,
Section- Volume - IIB.
& IB.
2. Items which deviate from Specification shall be marked with an asterisk (*)
SL.NO. ITEM UNIT PARTICULARS
Name of
Bidder/ Vendor
Revision Number 0 1 2 3 4
SECTION IIIC
PLATE HEAT EXCHANGER
SHEET 5 OF 7
INSTRUCTION TO BIDDER
1. This data sheet shall be read in conjunction with Specification No. PE-TS-XXX-179-N001
PE-TS-XXX-179-N001, SectionIA- &
Section- D,IB.
Volume - IIB.
2. Items which deviate from Specification shall be marked with an asterisk (*)
SL.NO. ITEM UNIT PARTICULARS
13.0 Inlet & outlet Connection Nozzles Primary Side Secondary Side
(Hot Fluid) (Cold Fluid)
13.1 Size mm
13.2 Rating
13.3 Facing & drilling standard
13.4 Flange material
13.5 Are all nozzles counter-flanges, bolts, YES/NO
nuts, gaskets etc., are included in the
offer?
Name of
Bidder/ Vendor
Revision Number 0 1 2 3 4
SECTION IIIC
PLATE HEAT EXCHANGER
SHEET 6 OF 7
INSTRUCTION TO BIDDER
1. This data sheet shall be read in conjunction with Specification No. PE-TS-XXX-179-N001 Section-
PE-TS-XXX-179-N001, SectionIA- D,
& IB.
Volume - IIB.
2. Items which deviate from Specification shall be marked with an asterisk (*)
SL.NO. ITEM UNIT PARTICULARS
Name of
Bidder/ Vendor
Revision Number 0 1 2 3 4
SECTION IIIC
PLATE HEAT EXCHANGER
SHEET 7 OF 7
INSTRUCTION TO BIDDER
1. This data sheet shall be read in conjunction with Specification No. PE-TS-XXX-179-N001 Section-
PE-TS-XXX-179-N001, SectionIA- &
D,IB.
Volume - IIB.
2. Items which deviate from Specification shall be marked with an asterisk (*)
SL.NO. ITEM UNIT PARTICULARS
a) Empty
b) Flooded
Name of
Bidder/ Vendor
Revision Number 0 1 2 3 4