Lesson Overview
• Testing and Quality Management
• Reading
– Ch. 8 – Software Testing
– Ch. 24 – Quality Management
• Objectives
– Analyze testing as a critical life-cycle phase and
quality as a critical goal of software engineering
– Explore both the reactive (testing) and proactive
(quality management) approaches for maximizing
quality and likelihood of success
Participation – P3
• Discuss the testing process necessary to prove
that the IIT registration system’s course
enrollment function is perfectly “easy to use”.
• Explain the challenge in proving such a thing.
• Rewrite the usability non-functional
“requirement” from #1 so that definitive testing is
more feasible. Explain your improvements.
• Explain how each of the following would make
achieving this requirement more feasible:
– More experienced, better trained engineers
– More of them
– Design, development, and testing tools
– A rapid-prototyping process which involves the users
Quality Defined
• Quality
– The degree to which the project fulfills
requirements
– A degree of excellence
– A critical yet understated requirement
• Quality Management
– Creating policies and procedures
– Enforcing them to ensure compliance with project
requirements
QA vs. QC
• Quality Assurance
– Prevent defects
– Improve the level of quality through an efficient set
of activities performed throughout the life cycle
• Quality Control
– Eliminate defective products
– Improve the rate of acceptable product delivery
through an efficient set of defect detection
activities, primarily late in the life cycle
Quality Goals
• Prevent, discover and eliminate defects
• Deliver customer satisfaction by representing
the user in design and development
• Enforce standards and process
• Mind the gate
• Improve processes
• Review, audit, monitor, verify, validate and
inspect
The Value of Quality
• Quality increases customer satisfaction
– Credibility lasts and attracts new business
• Lack of quality leads to rework
– Unscheduled work means unplanned expense and
slipping schedules
– Work under duress increases the likelihood of
more mistakes
• Uptime and performance are largely
determined by quality
– Lack of quality drives the need to change
The QA Environment
• Contractual conditions
– Scope, time, budget, etc.
• Customer-supplier relationship
– Change management, acceptance, etc.
• Teamwork
– Variety of skills, parallel activities, etc.
• Multiple project support
• HCI / usability concerns
• Turnover management
• Maintenance
– Enhancement and release management, troubleshooting,
etc.
Defect Classification
• Incorrect specification of requirements
• Misunderstanding of client’s needs
• Deviation from requirements
– Gold-plating, short-cutting, etc.
• Design errors
• Implementation errors
• Violation of standards
• Poor test coverage
• User interface / usability errors
• Documentation errors
Planning for Quality
• Checkpoints supporting milestones
• Independent verification
• Build-test-fix-retest
• Make it measurable/testable
• Inspire the delivery of high-quality deliverables
– Establish quality goals
– Obtain commitment
– Motivate performance
• Collect the data/information required to improve over
time
Perform Quality Control
• Feedback loops
– Measure the output of a process
– As compared to expected
– Understand the results (both good and bad)
– Use that knowledge to improve the process
• Root-cause analysis
– Ask yourself what caused a problem to occur,
– then ask what caused that cause, and so on
• Histograms and Pareto Charts
– Frequency of problems by problem category
– 80% of the problems are due to 20% of the causes
– Invest in eliminating the most problematic causes
Focus on Quality
• Commitment to quality must be part of the
organizational culture
• Improvement frameworks
– Process maturity models
• Six-Sigma, CMMI
– The agile approach
• Rapid delivery of functionality
• Customer responsiveness
• Assess the quality of all deliverables and reward
practices and behaviors that lead to high-quality
results
– Attention to detail
– Extra effort
– Defect removal
– Proactive communication, etc.
Variability of Process
• Variety
– The spice of life, but death to a production line
– Managing variability requires knowledge of
• The desired output and the degree of tolerance
– Reducing variability (increasing predictability) takes effort
($)
– Side benefits can be significant
• Focus on improvement
– A focal point is essential to achieving significant, sustainable
improvement
• Feedback provides the mechanism for assessment
Cleanroom Software Development
• Target is zero-defect software
• Keep the development environment “ultra
clean”
• Approach
– Formally specify the system showing system
response to stimuli (state transitions)
– Utilize incremental development with significant
user involvement
– Rely on structured programming and limit the use of
control and data abstraction
– Rigorous software inspections
– Statistical testing to determine reliability
Configuration Management
• Configuration Management (CM) supports the
evolution of software systems through a
progression of versions
• Policies, processes and tools
• CM activities
– Change management
– Version management
– System building
– Release management
CM Activities
Change Management
• Change happens, mainly for good
• Change requests
– Formality reduces risk (and dampens change)
– Impact (time, effort, cost, risk, value, etc.)
• Decision making
– Change control board (CCB)
• Implementation
– Project planning and documentation
– Timing
– Cutover and rollback
Version Management (VM)
• Inevitable evolution often results of multiple
“supported” versions
• VM responsibilities
– Version and release identification
– Storage management
– Tracking change history
– Check out – modify – check in
– Shared component modification management
• Branching and merging
– Branching allows for parallel development
– Merging brings changes together
Baselines
System Building
• Compiling and linking the latest checked-in
components into a version of the system
• Tool support
– Build script generation
– VM system integration
– Minimal recompilation
– Executable system creation
– Test automation
– Reporting
– Documentation generation
Continuous Integration
Release Management
• A package for distribution
– Major – significant new functionality
– Minor – patches / fixes
• Release planning
– Current system quality
– Platform changes
– New-feature release followed by bug-fix release
– Competition
– Marketing commitments
– Custom changes
The Role of Testing
• Goals
– Demonstrate correctness, completeness, etc.
• At least one test per requirement
• Tests to fully exercise features
– Discover any defects
• Or at least gain confidence that all have been discovered
• V&V
– Validate that we are building the right product
– Verify that we are building it right
Testing Model
Fit for Purpose
• The system is good enough for its intended use
• Software purpose – the more critical the
system, the more important that it is reliable
• User expectations
– Tolerance for defects
– Sense of value in the system’s capabilities
• Marketing environment
– Competition can both drive organization’s to strive
for greater quality OR motivate them to release
systems without fully testing
– User expectations of quality are related to price
Inspections
• Static review of “readable” representations of
the system
– “Executability” is not a pre-condition
– Source code, design documents, etc.
– Inspected for adherence to specification and
standards
• Inspections vs. Testing
– In testing, defects can “hide beneath” other defects
– Testing requires a certain degree of completeness
– Inspections can look at other important factors
beyond correctness, such as portability,
maintainability, efficiency, etc.
Inspection Checks
• Variable management
• Flow control management
• Input/output management
• Interface management
• Memory management
• Exception handling
Development Testing
• Testing done local to the development effort
– Often done informally by the developer
– Primarily for defect detection – “debugging”
• Levels of granularity
– Unit testing – exercise the functionality of logical
units of the system
– Component testing – verify proper operation of
interacting entities such as objects
– System testing – exercise the system as a whole for
proper operation, exception handling, tolerance of
load, etc.
Test-driven Development
• Interleave testing and code development
– Develop a portion of code and its associated test(s)
– Move onto the next increment of code only when
current increment passes testing
• TDD approach
– Forces partitioning of system into portions
– Ensures “clean” code (in portions)
– Utilize automated testing
– Facilitates deeper understanding of the system
– Provides a level of documentation
– Needs to be supported by occasional “big picture”
assessment
Release Testing
• Establish a “fit for use” version of the system
– Requires independent verification
– Focus is on validation more than defect discovery
– Usually “black-box” in nature (ins and outs)
• Requirements testing
– Requirements should be testable
– Demonstrate proper implementation of system
requirements
• Scenario testing
– Verify “realistic” operation
• Performance or load testing
User Testing
• User acceptance is the ultimate goal of systems
development
• User involvement is critical to successful
development
• Users should be involved in test planning and
execution
• Approaches
– Alpha – within development process
– Beta – “field” testing of a preliminary release
– Acceptance – users determine “fitness”
Test Cases
• Effectiveness
– Efficiently discover defects
– Credibly show proper operation
• Efficiency
– Repeatable
– Self-documenting
– Easy to develop and maintain
• Strategies
– Test normal AND abnormal
– Use realistic data
– Test boundaries
Interface Testing
• Exercise the interface
– Parameter passing
– Return values and types
– Synchronization
– State management
• Box testing
– Predictable output for given input
– “Correctly incorrect” output for given improper
input
Test Planning
• Testing process description
• Requirements traceability
• Items to be tested
• Schedule
• Results recording procedures
• Required hardware and software
• Constraints