0% found this document useful (0 votes)
64 views1 page

As-Built: THC-EE-005

The document is an as-built third floor schedule of loads drawing for a 4 storey building with roof deck located in Cagayan de Oro City. It provides information on the owner, project title, drawing number, scale, and engineer who prepared the drawing.

Uploaded by

jpsablan.gccm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

As-Built: THC-EE-005

The document is an as-built third floor schedule of loads drawing for a 4 storey building with roof deck located in Cagayan de Oro City. It provides information on the owner, project title, drawing number, scale, and engineer who prepared the drawing.

Uploaded by

jpsablan.gccm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

1 AS-BUILT THIRD FLOOR SCHEDULE OF LOADS

E 24 SCALE : NTS

AS-BUILT
REG. NO. 004619 OWNER: IMPORTANT : DRAWING & SPECIFICATIONS AND OTHER CONTRACT PROJECT TITLE: SHEET CONTENT: DRAWING NO.
DOCUMENTS DULY SIGNED,STAMPED OR SEALED,AS AN INSTRUMENT SHEET NO.
VALIDITY NOV. 11, 2025
PTR NO. 8294004
OF SERVICE ARE THE INTELLECTUAL PROPERTY (PD.49) AND 4 STOREY WITH
DOCUMENTS OF RTHE ARCHITECT ,WHETHER THE OBJECT FOR WHICH
DATE ISSUED
PLACE ISSUED
JANUARY 12, 2023
VALENZUELA CITY
THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS
ROOF DECK
TH CAGAYAN MALL
THC-EE-005 E
ENGR. GILBERT P. GUERRERO FOR USE IN THE REPEATITION OF AND FOR THE OTHER

PROFESSIONAL ELECTRICAL ENGINEER


TIN 218-113-464 JERRY YU
TH CAGAYAN, INC.
PROJECT,WITHOUT THE WRITTEN CONSENT OF AUTHOR/ARCHITECT
OF SAID DOCUMENT (R.A. [Link].33)
LOCATION :
PUERTO, CAG. DE ORO CITY
24

You might also like