PANEL LC01 - INCOMER
FEEDER PROTECTION RELAY
GE 750
SIGMA POWER SERVICES PTY LTD
www.sigmapowerservices.com.au
[email protected] T: +61 89 2777 228 | M: +61 428 666 274
PROTECTION RELAY Page 1 of 5
TEST REPORT
Customer Rio-Tinto Job No. SPS-851062
Location Marandoo Work Order 110577685
Substation Primary Crushing Substation Date 09/04/2024
Switchboard 6.6kV Load Centre Panel LC01- INCOMER
1. DETAILS
GENERAL CHARACTERISTICS
Relay Manufacturer General Electric Rated Aux. Voltage -
Relay Type GE750 CT Ratio 500:1A
Serial No. B2721749 VT Ratio 60:1
Model No. 750-P1-G1-S1-LO-A20-R-T Ground CT Ratio 200:1
Setting Group 1 Software Version 011
2. PROTECTION SETTINGS
CURRENT PROTECTION SETTINGS
I> I>TMS I>CURVE I>> I>>Delay I>>> I>>> Delay
Element
Setting Setting Setting Setting Setting Setting Setting
Phase 1 0.3 IEC Curve C 12 0 - -
Overcurrent 4.60 0.5 DT - - - -
Neutral OC - - - - - - -
Sensitive
0.1 0.5 IEC Curve A - - - -
Overcurrent
VOLTAGE & FREQUENCY PROTECTION SETTINGS
Element Pickup Tripping Curve Time Delay Output Relay
Undervoltage 27 0.75 DT 2 Output 5
Overvoltage 59 - - - -
Underfrequency - - - -
CIRCUIT BREAKER FAILUE PROTECTION SETTINGS
Breaker Status/ Binary
Element Pickup Time Delay Output Relay
Input
CBF 0.1 - 0 Sec Output 3
Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad
PROTECTION RELAY Page 2 of 5
TEST REPORT
3. METERING
PHASE CURRENT METERING
Injected Current (A) Expected Current (A) Displayed Prim. Current on Relay (A) Remarks
R W B G R W B G R W B G
0.25 0.5 1 - 50 50 50 - 50 50 50 - Pass
SENSITIVE GROUND CURRENT METERING
Injected Current N (A) Expected Current N (A) Displayed Prim. Current on Relay (A) Remarks
0.1 20 19.8 Pass
VOLTAGE METERING
Injected Voltage (V) Expected Voltage (kV) Displayed Prim. Voltage on Relay (kV) Remarks
R-N W-N B-N R W B R W B
63.5 63.5 63.5 6.6 6.6 6.6 6.58 6.58 6.58 Pass
4. PROTECTION TEST RESULTS
PHASE OVERCURRENT PICK UP TEST
CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE
ELEMENT
L1, L2, L3 L1 L2 L3
1 1.04 1.05 1.04
I>
Pick Up: Based on Input Current (I2 is
4.60 4.611 4.610 4.610
3x input error)
I>> 12 12.10 12.20 12.10
I>>> - - - -
PHASE OVERCURRENT TIMING TEST
CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Calculated TOLERANCE
ELEMENT Trip Times
L1, L2, L3 L1-L2 L2-L3 L3-L1 (s)
Timing: ±3% of trip
2 8.037 8.044 8.037 8.000
time or 40ms
(@1.03xPU)
PTOC1 I> 3 3.016 3.045 3.045 3.000
4 1.632 1.628 1.628 1.600
6.9 45.90 ms 45.98 ms 45.99 ms 50 ms
PTOC2 I> 9.2 60.90 ms 60.98 ms 60.10 ms 50 ms
Timing: ±3% of trip
13.8 23.20 ms 23.98 ms 23.29 ms 50 ms time or 40ms
(@1.03xPU)
I>> 14 0.073 0.071 0.065 0 sec
I>>> - - - - -
Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad
PROTECTION RELAY Page 3 of 5
TEST REPORT
SENSITIVE GROUND OVERCURRENT PICK UP TEST
ELEMENT CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE
IN> 0.350 0.360 Pick Up: Based on Input Current (I2
IN>> - - is 3x input error)
SENSITIVE GROUND OVERCURRENT TIMING TEST
Calculated TOLERANCE
ELEMENT CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Trip Times
Timing: ±3% of trip
(s)
time or 40ms
IN> 1 1.475 1.485 (@1.03xPU)
Timing: ±3% of trip
IN>> - - - time or 40ms
(@1.03xPU)
GROUND OVERCURRENT PICK UP TEST
ELEMENT CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE
IG> - - Pick Up: Based on Input Current (I2
IG>> 0.1 0.11 is 3x input error)
GROUND OVERCURRENT TIMING TEST
Calculated TOLERANCE
ELEMENT CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Trip Times
Timing: ±3% of trip
(s)
time or 40ms
2x = - - (@1.03xPU)
IG> 4x = - -
6x = - -
Timing: ±3% of trip
IG>> 0.225 0.102 0.10 time or 40ms
(@1.03xPU)
VOLTAGE / FREQUENCY PROTECTIONS
ELEMENTS PICKUP (V , F) TRIP TIME (s) TRIP OUTPUT Tolerance
Undervoltage 27 31.72 2 5
Pick Up: Per Voltage Input
Timing: ±100ms
Expected Result 31.00 3 5
Overvoltage 59 - - -
Pick Up: Per Voltage Input
Timing: ±100ms
Expected Result - - -
Underfrequency - - -
Pick Up: Per Voltage Input
Timing: ±30ms
Expected Result - - -
Overfrequency - - -
Pick Up: Per Voltage Input
Timing: ±30ms
Expected Result - - -
Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad
PROTECTION RELAY Page 4 of 5
TEST REPORT
5. FINAL CHECKS
FINAL CHECKS
Relay Settings Compared to as found settings ☒ CT Links Closed ☒
Relay Settings read back ☒ CT Shorts removed ☒
All test equipment removed ☒ VT Supply restored ☒
As tested stickers applied to relay ☒ All Trip links closed ☒
Reset all flags/latches ☒ All Wiring and Contacts in good condition ☒
6. COMMENTS
Observations & Comments
1 All the test results are satisfactory, and the protection relay is in serviceable condition.
7. TEST EQUIPMENT
Test Equipment Used
Equipment Description Serial Number Calibration Due-Date
Omicron CMC356 Relay Test Set HN022W / 102411375 11/12/2024
8. VISUAL INSPECTION
Visual Photos
Front View of Relay Panel Name
Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad