Incomer Feeder Protection Relay Report

The document details test results for protection relay settings and functionality on a GE750 relay used on the 6.6kV load center panel LC01-INCOMER at Rio Tinto's Marandoo primary crushing substation. It includes protection element settings, metering tests, overcurrent pickup and timing tests, and sensitive ground element tests.

Uploaded by

bilal ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views5 pages

Incomer Feeder Protection Relay Report

The document details test results for protection relay settings and functionality on a GE750 relay used on the 6.6kV load center panel LC01-INCOMER at Rio Tinto's Marandoo primary crushing substation. It includes protection element settings, metering tests, overcurrent pickup and timing tests, and sensitive ground element tests.

Uploaded by

bilal ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PANEL LC01 - INCOMER

FEEDER PROTECTION RELAY


GE 750

SIGMA POWER SERVICES PTY LTD


www.sigmapowerservices.com.au
[email protected]
T: +61 89 2777 228 | M: +61 428 666 274
PROTECTION RELAY Page 1 of 5

TEST REPORT

Customer Rio-Tinto Job No. SPS-851062

Location Marandoo Work Order 110577685

Substation Primary Crushing Substation Date 09/04/2024

Switchboard 6.6kV Load Centre Panel LC01- INCOMER

1. DETAILS

GENERAL CHARACTERISTICS
Relay Manufacturer General Electric Rated Aux. Voltage -

Relay Type GE750 CT Ratio 500:1A

Serial No. B2721749 VT Ratio 60:1

Model No. 750-P1-G1-S1-LO-A20-R-T Ground CT Ratio 200:1

Setting Group 1 Software Version 011

2. PROTECTION SETTINGS

CURRENT PROTECTION SETTINGS


I> I>TMS I>CURVE I>> I>>Delay I>>> I>>> Delay
Element
Setting Setting Setting Setting Setting Setting Setting
Phase 1 0.3 IEC Curve C 12 0 - -
Overcurrent 4.60 0.5 DT - - - -
Neutral OC - - - - - - -
Sensitive
0.1 0.5 IEC Curve A - - - -
Overcurrent
VOLTAGE & FREQUENCY PROTECTION SETTINGS
Element Pickup Tripping Curve Time Delay Output Relay
Undervoltage 27 0.75 DT 2 Output 5
Overvoltage 59 - - - -
Underfrequency - - - -
CIRCUIT BREAKER FAILUE PROTECTION SETTINGS
Breaker Status/ Binary
Element Pickup Time Delay Output Relay
Input
CBF 0.1 - 0 Sec Output 3

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad


PROTECTION RELAY Page 2 of 5

TEST REPORT

3. METERING

PHASE CURRENT METERING


Injected Current (A) Expected Current (A) Displayed Prim. Current on Relay (A) Remarks
R W B G R W B G R W B G
0.25 0.5 1 - 50 50 50 - 50 50 50 - Pass

SENSITIVE GROUND CURRENT METERING


Injected Current N (A) Expected Current N (A) Displayed Prim. Current on Relay (A) Remarks
0.1 20 19.8 Pass

VOLTAGE METERING
Injected Voltage (V) Expected Voltage (kV) Displayed Prim. Voltage on Relay (kV) Remarks

R-N W-N B-N R W B R W B

63.5 63.5 63.5 6.6 6.6 6.6 6.58 6.58 6.58 Pass

4. PROTECTION TEST RESULTS


PHASE OVERCURRENT PICK UP TEST
CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE
ELEMENT
L1, L2, L3 L1 L2 L3

1 1.04 1.05 1.04


I>
Pick Up: Based on Input Current (I2 is
4.60 4.611 4.610 4.610
3x input error)
I>> 12 12.10 12.20 12.10

I>>> - - - -

PHASE OVERCURRENT TIMING TEST


CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Calculated TOLERANCE
ELEMENT Trip Times
L1, L2, L3 L1-L2 L2-L3 L3-L1 (s)
Timing: ±3% of trip
2 8.037 8.044 8.037 8.000
time or 40ms
(@1.03xPU)
PTOC1 I> 3 3.016 3.045 3.045 3.000

4 1.632 1.628 1.628 1.600

6.9 45.90 ms 45.98 ms 45.99 ms 50 ms

PTOC2 I> 9.2 60.90 ms 60.98 ms 60.10 ms 50 ms


Timing: ±3% of trip
13.8 23.20 ms 23.98 ms 23.29 ms 50 ms time or 40ms
(@1.03xPU)
I>> 14 0.073 0.071 0.065 0 sec

I>>> - - - - -

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad


PROTECTION RELAY Page 3 of 5

TEST REPORT

SENSITIVE GROUND OVERCURRENT PICK UP TEST


ELEMENT CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE

IN> 0.350 0.360 Pick Up: Based on Input Current (I2


IN>> - - is 3x input error)

SENSITIVE GROUND OVERCURRENT TIMING TEST


Calculated TOLERANCE
ELEMENT CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Trip Times
Timing: ±3% of trip
(s)
time or 40ms
IN> 1 1.475 1.485 (@1.03xPU)
Timing: ±3% of trip
IN>> - - - time or 40ms
(@1.03xPU)

GROUND OVERCURRENT PICK UP TEST


ELEMENT CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE

IG> - - Pick Up: Based on Input Current (I2


IG>> 0.1 0.11 is 3x input error)

GROUND OVERCURRENT TIMING TEST


Calculated TOLERANCE
ELEMENT CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Trip Times
Timing: ±3% of trip
(s)
time or 40ms
2x = - - (@1.03xPU)
IG> 4x = - -
6x = - -
Timing: ±3% of trip
IG>> 0.225 0.102 0.10 time or 40ms
(@1.03xPU)

VOLTAGE / FREQUENCY PROTECTIONS


ELEMENTS PICKUP (V , F) TRIP TIME (s) TRIP OUTPUT Tolerance

Undervoltage 27 31.72 2 5
Pick Up: Per Voltage Input
Timing: ±100ms
Expected Result 31.00 3 5

Overvoltage 59 - - -
Pick Up: Per Voltage Input
Timing: ±100ms
Expected Result - - -

Underfrequency - - -
Pick Up: Per Voltage Input
Timing: ±30ms
Expected Result - - -

Overfrequency - - -
Pick Up: Per Voltage Input
Timing: ±30ms
Expected Result - - -

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad


PROTECTION RELAY Page 4 of 5

TEST REPORT

5. FINAL CHECKS

FINAL CHECKS
Relay Settings Compared to as found settings ☒ CT Links Closed ☒
Relay Settings read back ☒ CT Shorts removed ☒
All test equipment removed ☒ VT Supply restored ☒
As tested stickers applied to relay ☒ All Trip links closed ☒
Reset all flags/latches ☒ All Wiring and Contacts in good condition ☒

6. COMMENTS

Observations & Comments


1 All the test results are satisfactory, and the protection relay is in serviceable condition.

7. TEST EQUIPMENT
Test Equipment Used
Equipment Description Serial Number Calibration Due-Date
Omicron CMC356 Relay Test Set HN022W / 102411375 11/12/2024

8. VISUAL INSPECTION

Visual Photos

Front View of Relay Panel Name

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad